Download Hearing Documents
Information:
Third-Party Information Liability Disclaimer – Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.
French/English documents – Content provided by external sources is submitted in either French or English only. To request a CNSC staff document in French please email interventions@cnsc-ccsn.gc.ca.
June 24-26, 2025 - Part-2 Public Hearing - Ontario Power Generation
Application from Ontario Power Generation to renew power reactor operating license for the Darlington Nuclear Generating Station
- Download all documents for the June 24-26, 2025 public hearing (ZIP, 14.2 MB)
- Download a particular PDF document for the June 24-26, 2025 public hearing
June 24-26, 2025 public hearing
- Published on August 30, 2024
- Published on August 1, 2024
Public Hearing of June 4-5, 2025 – Nordion (Canada) Inc
Application from Nordion for the renewal of the Class 1B Nuclear Substance Processing Facility Operating License
- Download all documents for the June 4-5, 2025 public hearing (ZIP, 2.39 MB)
- Download a particular PDF document for the June 4-5, 2025 public hearing
June 4-5, 2025 public hearing
- Published on December 12, 2024
- Published on November 4, 2024
-
Published on October 22, 2024
- Supplementary Submission from Nordion (1): Information required for the renewal of license (PDF, 31 pages, 464 KB)
- Supplementary Submission from Nordion (2): Summary of facility modifications and program improvement (PDF, 8 pages, 256 KB)
- Supplementary Submission from Nordion (3): Supplementary report to support the renewal (PDF, 22 pages, 465 KB)
- Published on October 18, 2024
May 2025 Hearing in Writing and Participant Funding – Ontario Power Generation – Pickering Waste Management Facility (CMD 25-H101)
Application to Amend the Pickering Waste Management Facility Licence to Authorize Construction and Operation of the Pickering Component Storage Structure
- Download all documents for the May 2025 Hearing in writing (ZIP, 13.1 MB)
- Download a particular PDF document for the May 2025 Hearing in writing
May 2025 Hearing in writing
- Published on October 3, 2024
- Published on September 18, 2024
March 26, 2025 Part-1 Public Hearing - Ontario Power Generation
Application from Ontario Power Generation to renew power reactor operating license for the Darlington Nuclear Generating Station
- Download all documents for the March 26, 2025 public hearing (ZIP, 14.2 MB)
- Download a particular PDF document for the March 26, 2025 public hearing
March 26, 2025 public hearing
- Published on August 30, 2024
- Published on August 1, 2024
March 2025 Hearing in writing – Ontario Power Generation – Darlington Nuclear Generating Station
Application to amend Darlington Nuclear Generating Station power reactor operating licence to allow production of additional medical isotopes
- Download all documents for the March 2025 Hearing in writing (ZIP, 19.9 MB)
- Download a particular PDF document for the March 2025 Hearing in writing
March 2025 Hearing in writing
- Published on September 9, 2024
- Published on September 3, 2024
- Published on August 29, 2024
January 30, 2025 Public Hearing – Cameco Corporation – Beaverlodge
Application for the Licence Revocation and Transfer of Properties to Saskatchewan Institutional Control Program
- Download all documents for the January 30, 2025 public hearing - Part 1 (ZIP, 66 MB)
- Download all documents for the January 30, 2025 public hearing - Part 2 (ZIP, 15 MB)
- Download a particular PDF document for the January 30, 2025 public hearing
January 30, 2025 public hearing
- Published on October 29, 2024
-
Published on October 17, 2024
- CMD 25-H3.1A – Supplementary submission from Cameco Corporation, Beaverlodge - Application for the Licence Revocation and Transfer of Properties to Saskatchewan Institutional Control Program (PDF, 70 pages, 7.13 MB)
- CMD 25-H3.1 – Submission from Cameco Corporation, Beaverlodge - Application for the Licence Revocation and Transfer of Properties to Saskatchewan Institutional Control Program (PDF, 84 pages, 7.89 MB)
- Published on October 15, 2024
- Published on October 10, 2024
-
Published on October 8, 2024
- CMD 25-H3 – Submission from CNSC staff - Request to Revoke the Current Licence and Release the Beaverlodge Project to the Institutional Control Program (PDF, 112 pages, 5.23 MB)
- CMD 25-H3.REF – Reference Package for CMD 25-H3.REF Submission from CNSC Staff on Cameco Corporation Request to Revoke the Current Licence and Release the Beaverlodge Project to the Institutional Control Program (PDF, 843 pages, 61.3 MB)
- Published on September 24, 2024
- Published on August 30, 2024
January 8-10, 2025, and January 13-14, 2025 – Part 2 Public Hearing – Ontario Power Generation - Darlington New Nuclear Project
Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project
- Download all documents for the January 8-10, 2025 public hearing - Part 1 (ZIP, 21.8 MB)
- Download all documents for the January 8-10, 2025 public hearing - Part 2 (ZIP, 74.7 MB)
- Download all documents for the January 8-10, 2025 public hearing - Part 3 (ZIP, 66.8 MB)
- Download a particular PDF document for Part 2 of the DNNP hearing
January 8-10, 2025 Hearing
- Published on December 12, 2024
- Published on December 10, 2024
- Published on December 9, 2024
- Published on December 3, 2024
-
Published on December 2, 2024
- CMD 24-H3 NK054-REP-08130-00004 DNNP Licence to Construct Management System Report (Rev 1) (PDF, 104 pages, 1.35 MB)
- CNSC Staff Review of OPG’s Request for Confidentiality in Relation to CNSC Staff CMD 24-H3 Reference Document NEDC-33926P (PDF, 1 pages, 96.9 KB)
- CMD 24-H3.20 – Submission from RESD Inc. (PDF, 10 pages, 433 KB)
- CMD 24-H3.38 - Submission from Ecojustice Working Group (PDF, 77 pages, 1.59 MB)
- CMD 24-H3.67 - Submission from Canadian Coalition for Nuclear Responsibility & Prolet Inc. (PDF, 75 pages, 9.87 MB)
- CMD 24-H3.68 - Submission from Nuclear Transparency Project (PDF, 15 pages,255 KB)
- Published on November 29, 2024
-
Published on November 27, 2024
- GEH Correspondence in Support of the Ontario Power Generation Inc. (OPG) Request for Confidentiality in 24-H3 (PDF, 2 pages, 99.2 KB)
- CMD 24-H3 - BWRX-300 Containment Evaluation Method – Non-Proprietary Information (PDF, 444 pages, 4.30 MB)
- CMD 24-H3 - BWRX-300 Darlington New Nuclear Project (DNNP) Fire Protection Preliminary Code Compliance Review Report – Non-Proprietary Information (PDF, 233 pages, 1.53 MB)
- CMD 24-H3 - BWRX-300 Darlington New Nuclear Project (DNNP) GNF2 Fuel Design, Qualification and BWR Fuel Licensing - Non-Proprietary Information (PDF, 25 pages, 3.61 KB)
- CMD 24-H3 - BWRX-300 Darlington New Nuclear Project (DNNP) Human Factors Engineering Program Plan – Non-Proprietary Information, GE Hitachi (PDF, 59 pages, 467 KB)
- CMD 24-H3 - BWRX-300 Darlington New Nuclear Project (DNNP) Preliminary Fire Hazards Assessment Report – Non-Proprietary Information (PDF, 162 pages, 7.10 MB)
- CMD 24-H3 - BWRX-300 Darlington New Nuclear Project (DNNP) Preliminary Fire Safe Shutdown Requirements and Analysis Document – Non-Proprietary Information (PDF, 82 pages, 541 KB)
- CNSC Staff Feedback on OPG’s Additional Justification to be Granted Confidentiality (PDF, 17 pages, 4.10 MB)
- CNSC Staff Review of OPG’s Requests for Confidentiality in Relation to CNSC Staff CMD 24-H3 Referenced Documents (PDF, 27 pages, 959 KB)
- Letter to CNSC Staff on Commission Expectations for Part 2 of the Hearing (PDF, 2 pages, 189 KB)
- Letter to OPG on Commission Expectations for Part 2 of the Hearing (PDF, 2 pages, 186 KB)
- Letter to OPG Regarding Requests for Confidentiality in 24-H3 (PDF, 3 pages, 154 KB)
- CMD 24-H3 - NEDO-32177, TRACG Qualification – Non-Proprietary Version (PDF, 485 pages, 13.2 MB)
- CMD 24-H3 - NEDO-32176, TRACG Model Description, Revision 4 – Non-Proprietary Version (PDF, 507 pages, 3.06 MB)
- CMD 24-H3 - NEDO-32725, TRACG Qualification for SBWR, Volume 1 – Non-Proprietary Version (PDF, 307 pages, 2.22 MB)
- CMD 24-H3 - NEDO-32725, TRACG Qualification for SBWR, Volume 2 – Non-Proprietary Version (PDF, 510 pages, 1.70 MB)
- CMD 24-H3 - NEDO-33080, TRACG Qualification for ESBWR – Non-Proprietary Version (PDF, 108 pages, 791 KB)
- CMD 24-H3 - BWRX-300 Darlington New Nuclear Project (DNNP) Occupational Dose Assessment Report – Non-Proprietary Information (PDF, 29 pages, 463 KB)
- OPG Response to Commission’s Letter on Requests for Confidentiality in 24-H3 (PDF, 33 pages, 770 KB)
- Published on November 25, 2024
-
Published on November 21, 2024
- CMD 24-H3.58 - Submission from Northwatch (PDF, 38 pages, 1.4 MB)
- CMD 24-H3.81 - Submission from the Mississaugas of Scugog Island First Nation (PDF, 157 pages, 3.31 MB)
- CMD 24-H3.82 - Submission from the Saugeen Ojibway Nation (PDF, 18 pages, 390 KB)
- CMD 24-H3.83 - Submission from Curve Lake First Nation (PDF, 18 pages, 665 KB)
- CMD 24-H3.84 - Submission from the Canadian Environmental Law Association (PDF, 26 pages, 461 KB)
- CMD 24-H3.85 - Submission from the Hiawatha First Nations (PDF, 5 pages, 297 KB)
- Published on November 12, 2024
-
Published on November 7, 2024
- CMD 24-H3.3 - Submission from Labourers’ International Union of North America (PDF, 3 pages, 478 KB)
- CMD 24-H3.4 - Submission from AtkinsRéalis (PDF, 4 pages, 178 KB)
- CMD 24-H3.5 - Submission from Durham College (PDF, 3 pages, 704 KB)
- CMD 24-H3.6 - Submission from Ontario Clean Air Alliance (PDF, 17 pages, 1.98 MB)
- CMD 24-H3.7 - Submission from CANDU Owners Group Inc. (PDF, 5 pages, 353 KB)
- CMD 24-H3.8 - Submission from North American Young Generation in Nuclear (PDF, 7 pages, 827 KB)
- CMD 24-H3.9 - Submission from Lakeside Process Controls Ltd (PDF, 3 pages, 159 KB)
- CMD 24-H3.10 - Submission from Orano Canada Inc. (PDF, 4 pages, 205 KB)
- CMD 24-H3.11 - Submission from Christine Drimmie (PDF, 5 pages, 204 KB)
- CMD 24-H3.69 - Submission from Aecon Group INC. (PDF, 3 pages, 209 KB)
- CMD 24-H3.70 - Submission from the Ontario Chamber of Commerce (PDF, 2 pages, 164 KB)
- CMD 24-H3.71 - Submission from Johanna Aucoin-Slaunwhite (PDF, 2 pages, 339 KB)
- CMD 24-H3.72 - Submission from Mary Veltri (PDF, 3 pages, 173 KB)
- CMD 24-H3.73 - Submission from Catherine Vakil (PDF, 7 pages, 251 KB)
- CMD 24-H3.12 - Submission from Darlington Nuclear Community Advisory Council (PDF, 7 pages, 364 KB)
- CMD 24-H3.13 - Submission from BWX Technologies Inc. (PDF, 4 pages, 374 KB)
- CMD 24-H3.14 - Submission from The CEDAR Project Environment & Society Program (PDF, 3 pages, 163 KB)
- CMD 24-H3.15 - Submission from the Regional Municipality of Durham (PDF, 15 pages, 266 KB)
- CMD 24-H3.16 - Submission from the Power Workers’ Union (PDF, 11 pages, 425 KB)
- CMD 24-H3.17 - Submission from Cheryl Casbourn (PDF, 2 pages, 101 KB)
- CMD 24-H3.18 – Submission from Canadian Nuclear Association (PDF, 4 pages, 383 KB)
- CMD 24-H3.19 – Submission from CALIAN (PDF, 3 pages, 168 KB)
- CMD 24-H3.21 – Submission from Bruce Power (PDF, 3 pages, 239 KB)
- CMD 24-H3.22 – Submission from CAMECO Corporation (PDF, 3 pages, 204 KB)
- CMD 24-H3.23 – Submission from Black & McDonald (PDF, 3 pages, 200 KB)
- CMD 24-H3.24 - Submission from Scientists in School (PDF, 2 pages, 282 KB)
- CMD 24-H3.25 - Submission from the Society of United Professionals (PDF, 5 pages, 889 KB)
- CMD 24-H3.26 - Submission from Celeros Flow Technology (PDF, 3 pages, 281 KB)
- CMD 24-H3.27 - Submission from E.S. Fox Limited (PDF, 5 pages, 274 KB)
- CMD 24-H3.28 - Submission from Chris Corey (PDF, 4 pages, 570 KB)
- CMD 24-H3.29 - Submission from Paul Filteau (PDF, 2 pages, 439 KB)
- CMD 24-H3.30 - Submission from Mark M Giese (PDF, 2 pages, 336 KB)
- CMD 24-H3.31 - Submission from Adam Pasmanik (PDF, 2 pages, 543 KB)
- CMD 24-H3.32 - Submission from Andrew Stout (PDF, 2 pages, 619 KB)
- CMD 24-H3.59 – Submission from Stephen Lawrence (PDF, 6 pages, 176 KB)
- CMD 24-H3.60 – Submission from Promation (PDF, 3 pages, 268 KB)
- CMD 24-H3.61 – Submission from Fermi Energia AS (PDF, 4 pages, 142 KB)
- CMD 24-H3.62 - Submission from Alderville First Nation (PDF, 5 pages, 244 KB)
- CMD 24-H3.63 – Submission from AECOM (PDF, 3 pages, 130 KB)
- CMD 24-H3.64 – Submission from Jamil Jivani (PDF, 2 pages, 284 KB)
- CMD 24-H3.65 – Submission from Nuclear Waste Management (PDF, 3 pages, 241 KB)
- CMD 24-H3.37 – Submission from Jennifer Tett (PDF, 2 pages, 127 KB)
- CMD 24-H3.40 – Submission from Kinectrics (PDF, 4 pages, 405 KB)
- CMD 24-H3.41 – Submission from Kerstin Muth (PDF, 2 pages, 98 KB)
- CMD 24-H3.42 - Submission from Durham Business Alliance (PDF, 3 pages, 434 KB)
- CMD 24-H3.43 – Submission from Bird Construction (PDF, 4 pages, 550 KB)
- CMD 24-H3.44 – Submission from Mary Ludwig (PDF, 4 pages, 164 KB)
- CMD 24-H3.45 – Submission from Pauline Richardson (PDF, 2 pages, 147 KB)
- CMD 24-H3.46 – Submission from NAGYN Durham (PDF, 6 pages, 169 KB)
- CMD 24-H3.47 – Submission from Clarington Board of Trade (PDF, 5 pages, 321 KB)
- CMD 24-H3.48 – Submission from Ingrid Alesich (PDF, 2 pages, 135 KB)
- CMD 24-H3.49 – Submission from NB Power (PDF, 3 pages, 223 KB)
- CMD 24-H3.50 – Submission from SaskPower (PDF, 3 pages, 909 KB)
- CMD 24-H3.51 – Submission from Organization of Canadian Nuclear Industries (PDF, 4 pages, 1.61 MB)
- CMD 24-H3.52 – Submission from Society of High Prairie Regional Environmental Action Committee (PDF, 4 pages, 198 KB)
- CMD 24-H3.53 – Submission from Brilliant Energy Institute (PDF, 3 pages, 919 KB)
- CMD 24-H3.54 – Submission from Municipality of Clarington (PDF, 18 pages, 968 KB)
- CMD 24-H3.55 – Submission from Janine Carter (PDF, 2 pages, 371 KB)
- CMD 24-H3.56 – Submission from GEH SMR Technologies Canada (PDF, 7 pages, 650 KB)
- CMD 24-H3.57 - Submission from Metis Nation of Ontario (PDF, 5 pages, 258 KB)
- CMD 24-H3.74 – Submission from Women in Nuclear (WiN) Canada (PDF, 4 pages, 317 KB)
- CMD 24-H3.75 – Submission from Victor Lau (PDF, 4 pages, 437 KB)
- CMD 24-H3.76 – Submission from Canadian Nuclear Workers’ Council (PDF, 5 pages, 264 KB)
- CMD 24-H3.77 – Submission from Hatch Ltd. (PDF, 5 pages, 164 KB)
- CMD 24-H3.78 – Submission from Wendy O’Connor (PDF, 4 pages, 190 KB)
- CMD 24-H3.80 – Submission from Jeremy Whitmore (PDF, 4 pages, 154 KB)
- CMD 24-H3.34 – Submission from Marilyn Hay (PDF, 3 pages, 594 KB)
- CMD 24-H3.35 – Submission from Shawn Kettner (PDF, 2 pages, 532 KB)
- CMD 24-H3.36 – Submission from Ole Hendrickson (PDF, 3 pages, 168 KB)
- CMD 24-H3.66 – Submission from Judith Fox Lee (PDF, 3 pages, 542 KB)
- CMD 24-H3.79 – Submission from Kenneth C Johnson (PDF, 11 pages, 3.9 MB)
-
Published on November 6, 2024
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced Documents - Volume 1
- CMD 24-H3 NK054-SR-01210-00001-R001-Ontario Power Generation Inc (Darlington New Nuclear Project) BWRX 300 Preliminary Safety Analysis Report (PDF, 2596 pages, 35.5 MB)
- CMD 24-H3 REGDOC-1.1.1 Site Evaluation and Site Preparation for New Reactor Facilities (PDF, 230, 27.5 MB)
- CMD 24-H3 NK054-REP-01210-00144 BWRX 300 Darlington New Nuclear Project (DNNP) Hazards Analysis Methodology (PDF, 1, 76 KB)
- CMD 24-H3 NK054-REP-01210 00158 (Rev 0) BWRX 300 Darlington New Nuclear Project (DNNP) Hazard Analysis Results (PDF, 1, 76 KB)
- CMD 24-H3 CSA Group Standard N293 Fire Protection for Nuclear Power Plants (PDF, 4 pages, 924 KB)
- CMD 24-H3 NK054 CORR 01210 1015770 Engineering Direction for Darlington New Nuclear Project Design Basis Tornado Values (PDF, 1 page, 76 KB)
- CMD 24-H3 ASME-ANS-RA-S-14 Probabilistic Risk Assessment Standard for Advanced Non Light Water Reactor Nuclear Power Plants (2021 ed) (PDF, 2 pages, 132 KB)
- CMD 24-H3 IAEA SSG-18 Meteorological and Hydrological Hazards in Site Evaluation for Nuclear Installations (PDF, 172 pages, 23.1 MB)
- CMD 24-H3 Environment and Climate Change Canada (ECCC) guidance document Technical Guide for Strategic Assessment of Climate Change: Assessing Climate Change Resilience (PDF, 69 pages, 8.5 MB)
- CMD 24-H3 NK054-REP-01210-00175 Darlington New Nuclear Project Phase 1 Geotechnical Investigation Report Volume 2 (Power Block) (PDF, 1454 pages, 52.3 MB)
- CMD 24-H3 NK054-REP-01210-00187 Darlington New Nuclear Project Phase 2 Geotechnical Investigation (Condenser Cooling Water System) (PDF, 1176 pages, 87.7 MB)
- CMD 24-H3 DA1-SNC-Y99-RNN-TSPC-GT-0001 Excavation and Backfill Specifications for Power Block Area (PDF, 1, 74 KB)
- CMD 24-H3 NK054-REP-035008-00002 Darlington New Nuclear Project Seismically Induced Soil Liquefaction Assessment (Rev 1) (PDF, 700 pages, 32.8 MB)
- CMD 24-H3 REGDOC-2.4.2 Probabilistic Safety Assessment (PSA) for Reactor Facilities (PDF, 13 pages, 1.5 MB)
- CMD 24-H3 NK054-REP-01210-00144 BWRX 300 DNNP Probabilistic Safety Assessment Methodology (PDF, 1 page, 74 KB)
- CMD 24-H3 CNSC Letter to M. Knutson - DNNP - CNSC Staff Response to OPG Responses to CNSC Staff Comments on Probabilistic Safety Assessment Methodology and Hazards Analysis Methodology (PDF, 1 page, 74 KB)
- CMD 24-H3 NK054-CORR-00531-10860 DNNP Request for CNSC Acceptance for OPG Use of Computer Codes in BWRX 300 Probabilistic Safety Assessments (PDF, 4 pages, 176 KB)
- CMD 24-H3 NK054-REP-01210-00163 BWRX 300 Probabilistic Safety Assessment Summary Report (Rev 0) (PDF, 1 page, 74 KB)
- CMD 24-H3-NK054-REP-01210-00158 BWRX 300 DNNP Hazard Analysis Results (Rev 0) (PDF, 1 page, 74 KB)
- CMD 24-H3 ASME ANS Standard RA-S-1.2 2019 Severe Accident Progression and Radiological Release (Level 2) PRA Standard for Light Water Reactors (PDF, 2 pages, 108 KB)
- CMD 24-H3 IAEA SSG 3 Development and Application of Level 1 Probabilistic Safety Assessme nt for Nuclear Power Plants (2010 ed) (PDF, 215 pages, 31.4 MB)
- CMD 24-H3 IAEA SSG-4 Development and Application of Level 2 Probabilistic Safety Assessme nt for Nuclear Power Plants (2010 ed) (PDF, 108 pages, 14.4 MB)
- CMD 24-H3 IAEA INSAG-10 Defence in Depth in Nuclear Safety (1996 ed) (PDF, 48 pages, 3.7 MB)
- CMD 24-H3 CSA N290.17 Probabilistic Safety Assessment for Nuclear Power Plants (2017 ed) (PDF, 5 pages, 1.05 MB)
- CMD 24-H3 USNRC NUREG-0800 Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants LWR Edition (PDF, 2 pages, 283 KB)
- CMD 24-H3 USNRC Regulatory Guide RG 1.200 Acceptability of Probabilistic Risk Assessment Results for Risk Informed Activities (Rev 3) (PDF, 117 pages, 28.7 MB)
- CMD 24-H3 CNSC REGDOC-2.4.1 Deterministic Safety Analysis (Version 1 2014 ed) (PDF, 124 pages, 15.5 MB)
- CMD 24-H3 IAEA SSG-61 Format and Content of the Safety Analysis Report for Nuclear Power Plants (2021 ed) (PDF, 218, 29.3 MB)
- CMD 24-H3 CSA N286.7 Quality Assurance of Analytical Scientific and Design Computer Programs 2016 edition (reaffirmed in 2021) (PDF, 6 pages, 1.4 MB)
- CMD 24-H3 GE Hitachi document NEDC-33987-TRACG Application for BWRX 300 (Rev 0) (PDF, 1, 74 KB)
- CMD 24-H3 NK054-REP-03555-00001 BWRX 300 Containment Evaluation Method (Rev 3) (PDF, 1, 74 KB)
- CMD 24-H3 USNRC and CNSC Licensing Topical Report Joint Report on GE Hitachi’s Containment Evaluation Method (PDF, 444 pages 2.7 MB)
- CMD 24-H3 BWR 300 Safety Strategy Implementation Process (PDF, 17 pages, 3.2 MB)
- CMD 24-H3 GEH-NEDE-32176-TRACG Model Description (PDF, 1 page, 74 KB)
- CMD 24-H3 GEH-NEDE-32177P-TRACG Qualification revision 3 (PDF, 1, 74 KB)
- CMD 24-H3 GEH-NEDC -2725P-TRACG Qualification for SBWR (Volumes 1 and 2) revision 1 (PDF, 1 page, 74 KB)
- CMD 24-H3 GEH-NED-33080P-TRACG Qualification for ESBWR Class III revision 1 (PDF, 1 page, 74 KB)
- CMD 24-H3 NK054-REP-01210-00164-TRACG Application for BWRX 300 (PDF, 1 page, 74 KB)
- CMD 24-H3 CNSC Regulatory Document REGDOC-2.4.3 Nuclear Criticality Safety (Version 1) (PDF, 133, 26.9 MB)
- CMD 24-H3 NK054-REP-01210-00191 BWRX 300 Darlington New Nuclear Project (DNNP) Out of Core Criticality Safety Analysis Demonstration (Rev 0) (PDF, 1 page, 64 KB)
- CMD 24-H3 CNSC REGDOC-2.3.2 Accident Management (Version 2) (PDF, 36 pages, 462 KB)
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced Documents - Volume 1
- CMD 24-H3 OPG document NK054-SR-01210-00001 OPG DNNP BWRX 300 Preliminary Safety Analysis Report Revised Chapter 2 Site Characteristics revision 1 (PDF, 285 pages, 5.46 MB)
- CMD 24-H3 OPG document NK054-REP-01210-0001 DNNP Supporting Environment Studies Environment revision 1 dated December 2022 (PDF, 619 pages, 17.0 MB
- CMD 24-H3 OPG document NK38-REP-07730-10020 Fish Impingement Sampling at Darlington Nuclear Generating Station revision 0 dated October 2011 (PDF, 81 pages, 833 KB)
- CMD 24-H3 NK054-REP-07730-00029 Environmental Impact Statement New Nuclear Darlington Environmental Assessment (Sept 2009) (PDF, 1168 pages, 11.3 MB)
- CMD 24-H3 NK054-REP-07330-00053 Soil Characterization Report (Rev 0) (PDF, 1454 pages, 52.3 MB)
- CMD 24-H3 Government of Ontario Soil Groundwater and Sediment Standards for Use under Part XV 1 of the Environmental Protection Act Table 3 Full Depth Generic Site Conditions in a Non Potable Groundwater Condition first published July 2011 (PDF, 32 pages, 125 KB)
- CMD 24-H3 N-CHAR-AS-0002 Nuclear Management System (Rev 22) (PDF, 30 pages, 433 KB)
- CMD 24-H3 N-PROC-MP-0078 Specification Review Acceptance and Use of Vendor Technical Documents (Rev 11) (PDF, 41 pages, 617 KB)
- CMD 24-H3 N-STD-MP-0009 Contractor Owner Engineering Interface and Oversight (Rev 7) (PDF, 16 pages, 340 KB)
- CMD-24-H3-Ref2-5-19-NK054-SR-01210-00001-Ontario-Power-Generation-Inc-Darlington-New-Nuclear-Project-BWRX-300-Preliminary-Safety-Analysis-Report-Chapter-3-Safety-Objectives-and-Design-Rules-for-Structures-Systems-and-Components-Rev-1 (PDF, 322, 3.09 MB)
- CMD 24-H3 USNRC Regulatory Guide 1.26 Quality Group Classifications and Standards for Water Steam and Radioactive Waste Containing Components of Nuclear Power Plants (Rev 6) (PDF, 18 pages, 354 KB)
- CMD 24-H3 CSA N285.0 General Requirements for Pressure Retaining Systems and Components in CANDU Nuclear Power Plants Material Standards for Reactor Components for CANDU Nuclear Power Plants (2017 ed) (PDF, 8 pages, 172 KB)
- CMD 24-H3 USNRC RG-1.183 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (Rev 2) (PDF, 87 pages, 716 KB)
- CMD 24-H3 National Research Council National Building Code of Canada 2020 edition (PDF, 1530, 16.2 MB)
- CMD 24-H3 CNSC REGDOC-2.6.1 Reliability Programs for Nuclear Power Plants (Version 1) (PDF, 21 pages, 250 KB)
- CMD 24-H3 Darlington New Nuclear Project BWRX 300 Preliminary Safety Analysis Report Chapter 18 Human Factors Engineering (Rev 0) (PDF, 60 pages, 513 KB)
- CMD 24-H3 National Research Council of Canada National Fire Code of Canada 2020 edition (PDF, 355 pages, 3.79 MB)
- CMD 24-H3 USNRC RG-1.143 Design Guidance for Radioactive Waste Management Systems Structures and Components Installed in Light Water Cooled Nuclear Power Plants (PDF, 8 pages, 519 KB)
- CMD 24-H3 American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code 2021 edition (PDF, 70 pages, 1.60 MB)
- CMD 24-H3 USNRC-NUREG-0800-BTP-3-4 Postulated Rupture Locations in Fluid System Piping Inside and Outside Containment (Rev 2) (PDF, 10 pages, 130 KB)
- CMD 24-H3 NK054-REP-03555-00001 BWRX 300 Containment Evaluation Method (Rev 3)CMD 24-H3 NK054-REP-03555-00001 BWRX 300 Containment Evaluation Method (Rev 3) (PDF, 444, 2.75 MB)
- CMD 24-H3 IEC document 61513 Nuclear Power Plants Instrumentation and Control Important to Safety General Requirements for Systems (PDF, 25 pages, 301 KB)
- CMD 24-H3 IEC document 60709 Nuclear Power Plants Instrumentation Control and Electrical Power Systems Important to Safety Separation (PDF, 23 pages, 353 KB)
- CMD 24-H3 CSA N290 14 Qualification for Digital Hardware and Software for Use in Instrumentation and Control Applications for Nuclear Power Plants (2015 ed reaffirmed 2020) (PDF, 48 pages, 1.50 MB)
- CMD 24-H3 NEI-00-01 Guidance for Post Fire Safe Shutdown Circuit Analysis (PDF, 4 pages, 60 KB)
- CMD 24-H3 CNSC REGDOC-2.6.3 Ageing Management (Version 1) (PDF, 36 pages, 309 KB)
- CMD-24-H3-NEDO-33968 Human factors engineering (PDF, 60 pages, 476 KB)
-
CMD 24-H3 - Demande de permis de construction d’un réacteur BWRX-300 sur le site du projet de nouvelle centrale nucléaire de Darlington (PNCND) - Documents référencés - Volume 3
- CMD 24-H3 OPG document N-CHAR-AS- 0002 Nuclear Management System revision R022 dated December 2021 (PDF, 30 pages, 427 KB)
- CMD 24-H3 OPG document OPG PROG-0039 Project Management revision R002 December 2019 (PDF, 12 pages, 427 KB)
- CMD 24-H3 OPG document NK054-PCH-01210-00002 Darlington New Nuclear Project Charter revision R001 dated January 2024 (PDF, 9 pages, 267 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00008 Darlington New Nuclear Project Program Management Plan revision R002 dated November 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00100 DNNP Construction Program Management Plan Sheet 9 revision R000 dated March 2022 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document DA1-IPD-NN-NN-TPLN-PM-0001 Darlington Small Modular Reactor Project Execution Plan (PEP) revision C02 dated January 2024 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00100-DNNP Project Assurance Program Management Plan Sheet 2 revision R002 dated September 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210 00108 Integrated Project Execution Plan Sheet 1 revision 0 dated 13 April 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00035 DNNP Engineering Oversight Plan revision R001 dated February 2024 (PDF, 1 page, 66 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00108 DNNP Unit 1 Quality Management Plan Sheet 3 revision 0 dated 24 April 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210 00107-DNNP Construction Plan revision R000 dated February 2023 (PDF, 10 pages, 162 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00108 IPD Organization Chart Sheet 16 revision 0 dated 01 June 2023 (PDF, 1 page, 67 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00108 IPD Team Roles and Responsibilities Sheet 17 revision 0 dated 01 June 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00014 Roles and Responsibilities for Darlington New Build Engineering revision R001 dated September 2022 (PDF, 1 page, 66 KB)
- CMD 24-H3 OPG document NK054-COI-01210-00002 Contractor Owner Interface Agreement revision 0 dated March 2023 (PDF, 1 page, 66 KB)
- CMD 24-H3 CNSC Regulatory Document REGDOC-2.1.2 Safety Culture version 1 published April 2018 (PDF, 48 pages, 220 KB)
- CMD 24-H3 OPG document N-PROG-AS-0001 Nuclear Management System Administration revision R019 dated May 2021 (PDF, 16 pages, 465 KB)
- CMD 24-H3 OPG document OPG PROG 0009 Items and Services Management revision 3 dated October 2018 (PDF, 43 pages, 494 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00100 DNNP Document Management Plan Sheet 18 revision R000 dated March 2022 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG PROG 0001-(R011)- Information-Management revision 11 dated October 4 2021 (PDF, 19 pages, 161 KB)
- CMD 24-H3 CNSC REGDOC-2.2.2 Personnel Training (Version 2) (PDF, 19 pages, 3.5 MB)
- CMD 24-H3 CNSC REGDOC-2.2.4 Fitness for Duty Volume 1: Managing Worker Fatigue (Version 1) (PDF, 28 pages, 3.69 MB)
- CMD 24-H3 CNSC REGDOC-2.2.4 Fitness for Duty Volume 2: Managing Alcohol and Drug Use (Version 3) (PDF, 42 pages, 5.5 MB)
- CMD 24-H3 N-PROG-AS-0002 Human Performance Program (Rev 18) (PDF, 26 pages, 388)
- CMD 24-H3 N-PROG-TR-0005 Training (Rev 19) (PDF, 18 pages, 320 KB)
- CMD 24-H3 N PROC TR 0008 Systematic Approach to Training (Rev 24) (PDF, 18 pages, 320 KB)
- CMD 24-H3 N LIST 08920 10001 Nuclear Training Programs (Rev 11) (PDF, 7 pages, 152 KB)
- CMD 24-H3 NK054-PLAN-01210-00034 Darlington New Nuclear Project (DNNP) Health and Safety Plan (Rev 1) (PDF, 15 pages, 1.15 MB)
- CMD 24-H3 NK054 REP 01210 00193 2023 Annual Report for Licensed Activities at the Darlington New Nuclear Project (PDF, 50 pages, 526 KB)
- CMD 24-H3 CNSC REGDOC-2.8.1 Conventional Health and Safety (PDF, 24 pages, 526 KB)
- CMD 24-H3 OPG POL-0001 Employee Health and Safety Policy (Rev 17) (PDF, 1 page, 75 KB)
- CMD 24-H3 OPG PROC-0120 Safety Incident and Regulatory Event Response (Rev 5) (PDF, 46 pages, 594 KB)
- CMD 24-H3 OPG-PROC-0121 Safety Incident Investigation and Corrective Actions (Rev 3) (PDF, 26 pages, 448 KB)
- CMD 24-H3 CNSC Regulatory Document REGDOC-2.9.1 Environmental Principles Assessments and Protection Measures version 12 published September 2020 (PDF, 7 pages, 84 KB)
- CMD 24-H3 OPG policy document OPG POL-0021 Environmental Policy revision 9X dated August 2021 (PDF, 1 page, 100 KB)
- CMD 24-H3 OPG document NK054-PLAN-07730-00022 DNNP Environmental Management and Protection Plan (EMPP) revision 0 dated 15 February 2022 (PDF, 49 pages, 807 KB)
- CMD 24-H3 OPG document NK054 PLAN 07730 00014 Environmental Monitoring and Environmental Assessment Follow Up (EMEAF) Plan revision 2 dated 14 December 2023 (PDF, 138 pages, 1.81 MB)
- CMD 24-H3 OPG document N PROC OP 0025 Management of the Environmental Monitoring Programs revision 12 dated July 2021 (PDF, 38 pages, 444 KB)
- CMD 24-H3 OPG report N-REP-03443-0029-2022 Results of Environmental Monitoring Programs for Darlington and Pickering Nuclear revision 0 dated 07 April 2023 (PDF, 116 pages, 1.89 MB)
- CMD 24-H3 OPG document OPG PROG 0005 Environment Health and Safety Managed System revision 8 dated 03 June 2021 (PDF, 34 pages, 784 KB)
- CMD 24-H3 OPG program manual NK38-MAN-03443-10002 Darlington Environmental Monitoring Program revision 0 Dated (PDF, 29 pages, 726 KB)
- CMD 24-H3 CNSC REGDOC 2101 Nuclear Emergency Preparedness and Response (Version 2) (PDF, 56 pages, 488 KB)
- CMD 24-H3 Government of Ontario Provincial Nuclear Emergency Response Plan (PNERP) Master Plan (2017 ed) (PDF, 228 pages, 1.74 MB)
- CMD 24-H3 Waste Management, Volume I: Management of Radioactive Waste (PDF, 21 pages, 571 Ko)
- CMD 24-H3 CNSC REGDOC-2.11.2 Decommissioning (Version 1) (PDF, 28 pages, 262 KB)
- CMD 24-H3 OPG-STD-0156 Management of Wastes and Other Environmentally Regulated Materials (Rev 3) (PDF, 63 pages, 544 KB)
- CMD 24-H3 NK054 PLAN 03460 00001 Solid Radioactive Waste Management Strategy (Rev 0) (PDF, 30 pages, 682 KB)
- CMD 24-H3 NK054-PLAN-00960-00006 Preliminary Decommissioning Plan for the Darlington New Nuclear Project: As Built (Rev 0) (PDF, 95 pages, 2.49 MB)
- CMD 24-H3 NK054PLAN0096000007 Preliminary Decommissioning Plan for the Darlington New Nuclear Project: End of Life (Rev 0) (PDF, 110 pages, 1.97 MB)
- CMD 24-H3 IAEA INFCIRC-140 Treaty on the Non Proliferation of Nuclear Weapons (NPT) (PDF, 5 pages, 24 KB)
- CMD 24-H3 CNSC REGDOC-2.13.1 Safeguards and Nuclear Material Accountancy (Version 1) (PDF, 63 pages, 378 KB)
- CMD 24-H3 N PROG RA 0015 Safeguards and Nuclear Material Accountancy (Rev 10) (PDF, 48 pages, 410 KB)
- CMD 24-H3 REGDOC-2.13.2 Import and Export (Version 2) (PDF, 33 pages, 522 KB)
- CMD 24-H3 CNSC Licence PRSL 1800/2031 Nuclear Power Reactor Site Preparation Licence for Ontario Power Generation New Nuclear at Darlington Generating Station (PDF, 4 pages, 164 KB)
- CMD 24-H3 - CNSC CMD 24-H2 CNSC Staff Review and Assessment of the Applicability of the DNNP Environmental Assessment to OPG’s Selection of the General Electric Hitachi BWRX 300 Reactor (PDF, 127 pages, 978 KB)
- CMD 24-H3 CNSC Commission Record of Decision Ontario Power Generation Application to Renew the Power Reactor Site Preparation Licence for the Darlington New Nuclear Project (PDF, 44 pages, 560 KB)
- CMD 24-H3 CNSC Commission Record of Decision Ontario Power Generation Applicability of the BWRX 300 Reactor to the DNNP Environmental Assessment (PDF, 85 pages, 712 KB)
- CMD 24-H3 - CNSC CMD 21-M5 Presentation from CNSC Staff Regulatory Readiness Small Modular Reactor Projects (PDF, 59 pages, 1.11 MB)
- CMD 24-H3 NK054-REP-01210-00078 Darlington New Nuclear Project Commitments Report (Rev 9) (PDF, 194 pages, 1.69 MB)
- CMD 24-H3 CNSC REGDOC-1.1.2 Licence Application Guide: Licence to Construct a Reactor Facility (Version 2) (PDF, 94 pages, 732 KB)
- CMD 24-H3 CNSC REGDOC-2.5.2 Design of Reactor Facilities (Version 1) (PDF, 183 pages, 1.16 MB)
- CMD 24-H3 GEH-005N9751 BWRX 300 General Description (Rev F) (PDF, 95 pages, 2.44 MB)
- CMD 24-H3 CNSC REGDOC-3.2.2 Indigenous Engagement (Version 12) (PDF, 24 pages, 214 KB)
- CMD 24-H3 CNSC Workshop Summary: Public Consultation on OPG's Chosen Technology for its Proposed Darlington New Nuclear Project (PDF, 122 pages, 451 KB)
- CMD 24-H3 NK054-CORR-00531-10735DNNP Submission of Package #1 Management Aspects Deliverables in Support of the Licence to Construct Application for the CNSC Review (PDF, 124 pages, 1.87 MB)
- CMD 24-H3 N STD AS 0013 Nuclear Public Information Disclosure (PDF, 22 pages, 428 KB)
- CMD 24-H3 CNSC Desktop Inspection on OPG's Public Information and Disclosure Program (July 2023) (PDF, 21 pages, 270 KB)
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced documents - Volume 4
- CMD-24-H3 CNSC REGDOC-3.2.2 Indigenous Engagement (Version 1 2) (PDF, 25 pages, 226 KB)
- CMD-24-H3-Ref-4-CNSC-Commission-Record-of-Decision-Ontario-Power-Generation-Applicability-of-the-BWRX-300-Reactor-to-the-DNNP-Environmental-Assessment (PDF, 86 pages, 728 KB)
- CMD-24-H3 Minister of the Department of Aboriginal Affairs and Northern Development Canada “Aboriginal Consultation and Accomodation Updated Guidelines for Federal Officials to Fulfill the Duty to Consult” (2011) (PDF, 70 pages, 802 KB)
- CMD-24-H3 The United Nations Declaration on the Rights of Indigenous Peoples September 2007 (PDF, 33 pages, 168 KB)
- CMD-24-H3 Justice Canada United Nations Declaration on the Rights of Indigenous Peoples Act Implementation Secretariat The United Nations Declaration on the Rights of Indigenous Peoples Act Action Plan (2023) (PDF, 75 pages, 913 KB)
- CMD-24-H3 Government of Canada Principles respecting the Government of Canada's relationship with Indigenous peoples (2018) (PDF, 19 pages, 1.18 MB)
- CMD-24-H3 Government of Canada Backgrounder United Nations Declaration on the Rights of Indigenous Peoples Act (PDf, 7 pages, 173 KB)
- CMD-24-H3 Darlington New Nuclear Power Plant Project Joint Review Panel Darlington New Nuclear Power Plant Project Joint Review Panel Environmental Assessment Report Minister of Environment Government of Canada (2011) (PDf, 188 pages, 2.6 MB)
- CMD-24-H3 Government of Canada Statement of Apology for the Impacts of the 1923 Williams Treaties (2018) (PDF, 6 pages, 577 KB)
- CMD-24-H3 NK054-REP-00531-10771 Darlington New Nuclear Project Indigenous Engagement Report April 2020 to February 2023 (PDf, 48 pages, 839 KB)
- CMD-24-H3 NK054-REP-00531-1330434 Darlington New Nuclear Project Indigenous Engagement Report March 2023 to November 2023 (PDf, 48 pages, 667 KB)
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced Documents - Volume 1
- Published on October 15, 2024
- Published on September 25, 2024
- Published on September 5, 2024
-
Published on August 28, 2024
- Request to protect confidential information in relation to OPG Confidential DNNP Submission Package #6(b) (PDF, 10 pages, 478 KB)
- Request to protect confidential information in relation to CMD 24-H3 (PDF, 1,656 pages, 79,733 KB)
- Request to protect confidential information in relation to CMD 24-H3.1 (PDF, 1,823 pages, 81,821 KB)
- Request to protect confidential information in relation to document NK054-CORR-00531-10740 (PDF, 757 pages, 22,863 KB)
- Published on August 22, 2024
-
Published on July 2, 2024
- CMD 24-H3 – Submission from CNSC - Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project (PDF, 1126 pages, 14.02 MB)
- CMD 24-H3.1 – Submission from Ontario Power Generation - Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project (PDF, 184 pages, 3.58 MB)
- Published on June 27, 2024
November 2024 Hearing in Writing – Saskatchewan Research Council – Gunnar Mine Remediation Project (CMD 24-H108)
Application for the renewal of the waste nuclear substance licence for the Gunnar Mine Remediation Project for a 18-month period
November 2024 Hearing in writing
- Published on November 28, 2024
- Published on November 7, 2024
- Published on October 17, 2024
- Published on October 16, 2024
- Published on September 13, 2024
-
Published on September 12, 2024
- CMD 24-H108.1 – Submission from Saskatchewan Research Council – Application for the renewal of the waste nuclear substance licence for the Gunnar Mine Remediation Project for a 18-month period (PDF, 29 pages, 2.08 MB)
- Application for the renewal of the waste nuclear substance licence for the Gunnar Mine Remediation Project for a 18-month period (PDF, 28 pages, 1.93 MB)
- Request to protect confidential information (PDF, 8 pages, 391 KB)
Public Hearing of October 23, 2024 – Canadian Nuclear Laboratories Ltd. – Whiteshell Laboratories
Application for the renewal of the nuclear research and test establishment decommissioning licence for the Whiteshell Laboratories site
- Download all documents for the October 23, 2024 public hearing - Part 1 (ZIP, 67.7 MB)
- Download all documents for the October 23, 2024 public hearing - Part 2 (ZIP, 61.8 MB)
- Download all documents for the October 23, 2024 public hearing - Part 3 (ZIP, 32.5 MB)
- Download a particular PDF document for the October 23, 2024 public hearing
October 23, 2024 public hearing
-
Published on October 18, 2024
- Revised Agenda for October 23, 2024 Public Hearing – Ref. CMD 24-H8.A (PDF, 3 pages, 169 KB)
- CMD 24-H7.A – Presentation from CNSC Staff – Application for the renewal of the licence for the Whiteshell Laboratories site (PDF, 41 pages, 1.79 MB)
- CMD 24-H7.1A – Presentation from Canadian Nuclear Laboratories Ltd - Application for the renewal of the licence for the Whiteshell Laboratories site (PDF, 23 pages, 9.06 MB)
- CMD 24-H7.1B – Supplementary submission from Canadian Nuclear Laboratories Ltd. - Application for the renewal of the licence for the Whiteshell Laboratories site (PDF, 54 pages, 763 KB)
- CMD 24-H7.5A – Presentation from the Canadian Environmental Law Association (PDF, 21 pages, 1.09 MB)
- CMD 24-H7.5B – Presentation from the Canadian Environmental Law Association (PDF, 9 pages, 775 KB)
- CMD 24-H7.6A – Presentation from the Manitoba Métis Federation (PDF, 10 pages, 286 KB)
- CMD 24-H7.9A – Presentation from the Concerned Citizens of Renfrew County and Area (PDF, 11 pages, 263 KB)
- CMD 24-H7.11A – Presentation from the Black River First Nation, with input from the Hollow Water First Nation (PDF, 14 pages, 239 KB)
- CMD 24-H7.12A – Presentation from Northwatch (PDF, 11 pages, 1.11 MB)
- CMD 24-H7.1-REF – Supplementary submission from Canadian Nuclear Laboratories Ltd. - References for CMD 24-H7.1 (PDF, 1333 pages, 17.39 MB)
- Published on October 17, 2024
- Published on October 9, 2024
- Published on September 27, 2024
-
Published on September 23, 2024
- Agenda for October 23, 2024 Public Hearing – Ref. CMD 24-H8 (PDF, 3 pages, 251 KB)
- CMD 24-H7.2 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 851 KB)
- CMD 24-H7.3 – Submission from CANDU Owners Group Inc. (PDF, 3 pages, 333 KB)
- CMD 24-H7.4 – Submission from the Sagkeeng Anicinabe First Nation (PDF, 14 pages, 716 KB)
- CMD 24-H7.5 – Submission from the Canadian Environmental Law Association (PDF, 34 pages, 546 KB)
- CMD 24-H7.6 – Submission from the Manitoba Métis Federation (PDF, 27 pages, 2.78 MB)
- CMD 24-H7.7 – Submission from the Algonquins of Pikwàkanagàn First Nation (PDF, 9 pages, 342 KB)
- CMD 24-H7.8 – Submission from the North American Young Generation in Nuclear (PDF, 3 pages, 673 KB)
- CMD 24-H7.9 – Submission from the Concerned Citizens of Renfrew County and Area (PDF, 5 pages, 272 KB)
- CMD 24-H7.10 – Submission from the Radiation Safety Institute of Canada (PDF, 9 pages, 550 KB)
- CMD 24-H7.11 – Submission from the Black River First Nation, with input from the Hollow Water First Nation (PDF, 13 pages, 352 KB)
- CMD 24-H7.12 – Submission from Northwatch (PDF, 35 pages, 847 KB)
- Published on September 5, 2024
-
Published on August 30, 2024
- Notice of Public Hearing and Participant Funding – Canadian Nuclear Laboratories Ltd. - Application for 3-year renewal of decommissioning licence for Whiteshell Laboratories site (PDF, 3 pages, 216 KB)
- Revised Notice of Public Hearing and Participant Funding – Canadian Nuclear Laboratories Ltd. - Application for 3-year renewal of decommissioning licence for Whiteshell Laboratories site (PDF, 3 pages, 216 KB)
-
Published on July 23, 2024
- CMD 24-H7 – Submission from CNSC staff - Application for the renewal of the licence for the Whiteshell Laboratories site (PDF, 339 pages, 6.35 MB)
- CMD 24-H7.1 – Submission from Canadian Nuclear Laboratories Ltd. - Application for the renewal of the licence for the Whiteshell Laboratories site (PDF, 125 pages, 4.88 MB)
Public Hearing Part-1 of October 2, 2024 – Ontario Power Generation - Darlington New Nuclear Project
Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project
- Download all documents for the October 2, 2024 public hearing - Part 1 (ZIP, 27.2 MB)
- Download all documents for the October 2, 2024 public hearing - Part 2 (ZIP, 74.7 MB)
- Download all documents for the October 2, 2024 public hearing - Part 3 (ZIP, 66.7 MB)
- Download all documents for the October 2, 2024 public hearing - Part 4 (ZIP, 9.89 MB)
- Download a particular PDF document for Part 1 of the DNNP hearing
October 2, 2024 Hearing
- Published on December 12, 2024
- Published on December 3, 2024
- Published on December 2, 2024
-
Published on November 1, 2024
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced Documents - Volume 1
- CMD 24-H3 NK054-SR-01210-00001-R001-Ontario Power Generation Inc (Darlington New Nuclear Project) BWRX 300 Preliminary Safety Analysis Report (PDF, 2596 pages, 35.5 MB)
- CMD 24-H3 REGDOC-1.1.1 Site Evaluation and Site Preparation for New Reactor Facilities (PDF, 230, 27.5 MB)
- CMD 24-H3 NK054-REP-01210-00144 BWRX 300 Darlington New Nuclear Project (DNNP) Hazards Analysis Methodology (PDF, 1, 76 KB)
- CMD 24-H3 NK054-REP-01210 00158 (Rev 0) BWRX 300 Darlington New Nuclear Project (DNNP) Hazard Analysis Results (PDF, 1, 76 KB)
- CMD 24-H3 CSA Group Standard N293 Fire Protection for Nuclear Power Plants (PDF, 4 pages, 924 KB)
- CMD 24-H3 NK054 CORR 01210 1015770 Engineering Direction for Darlington New Nuclear Project Design Basis Tornado Values (PDF, 1 page, 76 KB)
- CMD 24-H3 ASME-ANS-RA-S-14 Probabilistic Risk Assessment Standard for Advanced Non Light Water Reactor Nuclear Power Plants (2021 ed) (PDF, 2 pages, 132 KB)
- CMD 24-H3 IAEA SSG-18 Meteorological and Hydrological Hazards in Site Evaluation for Nuclear Installations (PDF, 172 pages, 23.1 MB)
- CMD 24-H3 Environment and Climate Change Canada (ECCC) guidance document Technical Guide for Strategic Assessment of Climate Change: Assessing Climate Change Resilience (PDF, 69 pages, 8.5 MB)
- CMD 24-H3 NK054-REP-01210-00175 Darlington New Nuclear Project Phase 1 Geotechnical Investigation Report Volume 2 (Power Block) (PDF, 1454 pages, 52.3 MB)
- CMD 24-H3 NK054-REP-01210-00187 Darlington New Nuclear Project Phase 2 Geotechnical Investigation (Condenser Cooling Water System) (PDF, 1176 pages, 87.7 MB)
- CMD 24-H3 DA1-SNC-Y99-RNN-TSPC-GT-0001 Excavation and Backfill Specifications for Power Block Area (PDF, 1, 74 KB)
- CMD 24-H3 NK054-REP-035008-00002 Darlington New Nuclear Project Seismically Induced Soil Liquefaction Assessment (Rev 1) (PDF, 700 pages, 32.8 MB)
- CMD 24-H3 REGDOC-2.4.2 Probabilistic Safety Assessment (PSA) for Reactor Facilities (PDF, 13 pages, 1.5 MB)
- CMD 24-H3 NK054-REP-01210-00144 BWRX 300 DNNP Probabilistic Safety Assessment Methodology (PDF, 1 page, 74 KB)
- CMD 24-H3 CNSC Letter to M. Knutson - DNNP - CNSC Staff Response to OPG Responses to CNSC Staff Comments on Probabilistic Safety Assessment Methodology and Hazards Analysis Methodology (PDF, 1 page, 74 KB)
- CMD 24-H3 NK054-CORR-00531-10860 DNNP Request for CNSC Acceptance for OPG Use of Computer Codes in BWRX 300 Probabilistic Safety Assessments (PDF, 4 pages, 176 KB)
- CMD 24-H3 NK054-REP-01210-00163 BWRX 300 Probabilistic Safety Assessment Summary Report (Rev 0) (PDF, 1 page, 74 KB)
- CMD 24-H3-NK054-REP-01210-00158 BWRX 300 DNNP Hazard Analysis Results (Rev 0) (PDF, 1 page, 74 KB)
- CMD 24-H3 ASME ANS Standard RA-S-1.2 2019 Severe Accident Progression and Radiological Release (Level 2) PRA Standard for Light Water Reactors (PDF, 2 pages, 108 KB)
- CMD 24-H3 IAEA SSG 3 Development and Application of Level 1 Probabilistic Safety Assessme nt for Nuclear Power Plants (2010 ed) (PDF, 215 pages, 31.4 MB)
- CMD 24-H3 IAEA SSG-4 Development and Application of Level 2 Probabilistic Safety Assessme nt for Nuclear Power Plants (2010 ed) (PDF, 108 pages, 14.4 MB)
- CMD 24-H3 IAEA INSAG-10 Defence in Depth in Nuclear Safety (1996 ed) (PDF, 48 pages, 3.7 MB)
- CMD 24-H3 CSA N290.17 Probabilistic Safety Assessment for Nuclear Power Plants (2017 ed) (PDF, 5 pages, 1.05 MB)
- CMD 24-H3 USNRC NUREG-0800 Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants LWR Edition (PDF, 2 pages, 283 KB)
- CMD 24-H3 USNRC Regulatory Guide RG 1.200 Acceptability of Probabilistic Risk Assessment Results for Risk Informed Activities (Rev 3) (PDF, 117 pages, 28.7 MB)
- CMD 24-H3 CNSC REGDOC-2.4.1 Deterministic Safety Analysis (Version 1 2014 ed) (PDF, 124 pages, 15.5 MB)
- CMD 24-H3 IAEA SSG-61 Format and Content of the Safety Analysis Report for Nuclear Power Plants (2021 ed) (PDF, 218, 29.3 MB)
- CMD 24-H3 CSA N286.7 Quality Assurance of Analytical Scientific and Design Computer Programs 2016 edition (reaffirmed in 2021) (PDF, 6 pages, 1.4 MB)
- CMD 24-H3 GE Hitachi document NEDC-33987-TRACG Application for BWRX 300 (Rev 0) (PDF, 1, 74 KB)
- CMD 24-H3 NK054-REP-03555-00001 BWRX 300 Containment Evaluation Method (Rev 3) (PDF, 1, 74 KB)
- CMD 24-H3 USNRC and CNSC Licensing Topical Report Joint Report on GE Hitachi’s Containment Evaluation Method (PDF, 444 pages 2.7 MB)
- CMD 24-H3 BWR 300 Safety Strategy Implementation Process (PDF, 17 pages, 3.2 MB)
- CMD 24-H3 GEH-NEDE-32176-TRACG Model Description (PDF, 1 page, 74 KB)
- CMD 24-H3 GEH-NEDE-32177P-TRACG Qualification revision 3 (PDF, 1, 74 KB)
- CMD 24-H3 GEH-NEDC -2725P-TRACG Qualification for SBWR (Volumes 1 and 2) revision 1 (PDF, 1 page, 74 KB)
- CMD 24-H3 GEH-NED-33080P-TRACG Qualification for ESBWR Class III revision 1 (PDF, 1 page, 74 KB)
- CMD 24-H3 NK054-REP-01210-00164-TRACG Application for BWRX 300 (PDF, 1 page, 74 KB)
- CMD 24-H3 CNSC Regulatory Document REGDOC-2.4.3 Nuclear Criticality Safety (Version 1) (PDF, 133, 26.9 MB)
- CMD 24-H3 NK054-REP-01210-00191 BWRX 300 Darlington New Nuclear Project (DNNP) Out of Core Criticality Safety Analysis Demonstration (Rev 0) (PDF, 1 page, 64 KB)
- CMD 24-H3 CNSC REGDOC-2.3.2 Accident Management (Version 2) (PDF, 36 pages, 462 KB)
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced Documents - Volume 1
- CMD 24-H3 OPG document NK054-SR-01210-00001 OPG DNNP BWRX 300 Preliminary Safety Analysis Report Revised Chapter 2 Site Characteristics revision 1 (PDF, 285 pages, 5.46 MB)
- CMD 24-H3 OPG document NK054-REP-01210-0001 DNNP Supporting Environment Studies Environment revision 1 dated December 2022 (PDF, 619 pages, 17.0 MB
- CMD 24-H3 OPG document NK38-REP-07730-10020 Fish Impingement Sampling at Darlington Nuclear Generating Station revision 0 dated October 2011 (PDF, 81 pages, 833 KB)
- CMD 24-H3 NK054-REP-07730-00029 Environmental Impact Statement New Nuclear Darlington Environmental Assessment (Sept 2009) (PDF, 1168 pages, 11.3 MB)
- CMD 24-H3 NK054-REP-07330-00053 Soil Characterization Report (Rev 0) (PDF, 1454 pages, 52.3 MB)
- CMD 24-H3 Government of Ontario Soil Groundwater and Sediment Standards for Use under Part XV 1 of the Environmental Protection Act Table 3 Full Depth Generic Site Conditions in a Non Potable Groundwater Condition first published July 2011 (PDF, 32 pages, 125 KB)
- CMD 24-H3 N-CHAR-AS-0002 Nuclear Management System (Rev 22) (PDF, 30 pages, 433 KB)
- CMD 24-H3 N-PROC-MP-0078 Specification Review Acceptance and Use of Vendor Technical Documents (Rev 11) (PDF, 41 pages, 617 KB)
- CMD 24-H3 N-STD-MP-0009 Contractor Owner Engineering Interface and Oversight (Rev 7) (PDF, 16 pages, 340 KB)
- CMD-24-H3-Ref2-5-19-NK054-SR-01210-00001-Ontario-Power-Generation-Inc-Darlington-New-Nuclear-Project-BWRX-300-Preliminary-Safety-Analysis-Report-Chapter-3-Safety-Objectives-and-Design-Rules-for-Structures-Systems-and-Components-Rev-1 (PDF, 322, 3.09 MB)
- CMD 24-H3 USNRC Regulatory Guide 1.26 Quality Group Classifications and Standards for Water Steam and Radioactive Waste Containing Components of Nuclear Power Plants (Rev 6) (PDF, 18 pages, 354 KB)
- CMD 24-H3 CSA N285.0 General Requirements for Pressure Retaining Systems and Components in CANDU Nuclear Power Plants Material Standards for Reactor Components for CANDU Nuclear Power Plants (2017 ed) (PDF, 8 pages, 172 KB)
- CMD 24-H3 USNRC RG-1.183 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (Rev 2) (PDF, 87 pages, 716 KB)
- CMD 24-H3 National Research Council National Building Code of Canada 2020 edition (PDF, 1530, 16.2 MB)
- CMD 24-H3 CNSC REGDOC-2.6.1 Reliability Programs for Nuclear Power Plants (Version 1) (PDF, 21 pages, 250 KB)
- CMD 24-H3 Darlington New Nuclear Project BWRX 300 Preliminary Safety Analysis Report Chapter 18 Human Factors Engineering (Rev 0) (PDF, 60 pages, 513 KB)
- CMD 24-H3 National Research Council of Canada National Fire Code of Canada 2020 edition (PDF, 355 pages, 3.79 MB)
- CMD 24-H3 USNRC RG-1.143 Design Guidance for Radioactive Waste Management Systems Structures and Components Installed in Light Water Cooled Nuclear Power Plants (PDF, 8 pages, 519 KB)
- CMD 24-H3 American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code 2021 edition (PDF, 70 pages, 1.60 MB)
- CMD 24-H3 USNRC-NUREG-0800-BTP-3-4 Postulated Rupture Locations in Fluid System Piping Inside and Outside Containment (Rev 2) (PDF, 10 pages, 130 KB)
- CMD 24-H3 NK054-REP-03555-00001 BWRX 300 Containment Evaluation Method (Rev 3)CMD 24-H3 NK054-REP-03555-00001 BWRX 300 Containment Evaluation Method (Rev 3) (PDF, 444, 2.75 MB)
- CMD 24-H3 IEC document 61513 Nuclear Power Plants Instrumentation and Control Important to Safety General Requirements for Systems (PDF, 25 pages, 301 KB)
- CMD 24-H3 IEC document 60709 Nuclear Power Plants Instrumentation Control and Electrical Power Systems Important to Safety Separation (PDF, 23 pages, 353 KB)
- CMD 24-H3 CSA N290 14 Qualification for Digital Hardware and Software for Use in Instrumentation and Control Applications for Nuclear Power Plants (2015 ed reaffirmed 2020) (PDF, 48 pages, 1.50 MB)
- CMD 24-H3 NEI-00-01 Guidance for Post Fire Safe Shutdown Circuit Analysis (PDF, 4 pages, 60 KB)
- CMD 24-H3 CNSC REGDOC-2.6.3 Ageing Management (Version 1) (PDF, 36 pages, 309 KB)
- CMD-24-H3-NEDO-33968 Human factors engineering (PDF, 60 pages, 476 KB)
-
CMD 24-H3 - Demande de permis de construction d’un réacteur BWRX-300 sur le site du projet de nouvelle centrale nucléaire de Darlington (PNCND) - Documents référencés - Volume 3
- CMD 24-H3 OPG document N-CHAR-AS- 0002 Nuclear Management System revision R022 dated December 2021 (PDF, 30 pages, 427 KB)
- CMD 24-H3 OPG document OPG PROG-0039 Project Management revision R002 December 2019 (PDF, 12 pages, 427 KB)
- CMD 24-H3 OPG document NK054-PCH-01210-00002 Darlington New Nuclear Project Charter revision R001 dated January 2024 (PDF, 9 pages, 267 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00008 Darlington New Nuclear Project Program Management Plan revision R002 dated November 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00100 DNNP Construction Program Management Plan Sheet 9 revision R000 dated March 2022 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document DA1-IPD-NN-NN-TPLN-PM-0001 Darlington Small Modular Reactor Project Execution Plan (PEP) revision C02 dated January 2024 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00100-DNNP Project Assurance Program Management Plan Sheet 2 revision R002 dated September 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210 00108 Integrated Project Execution Plan Sheet 1 revision 0 dated 13 April 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00035 DNNP Engineering Oversight Plan revision R001 dated February 2024 (PDF, 1 page, 66 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00108 DNNP Unit 1 Quality Management Plan Sheet 3 revision 0 dated 24 April 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210 00107-DNNP Construction Plan revision R000 dated February 2023 (PDF, 10 pages, 162 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00108 IPD Organization Chart Sheet 16 revision 0 dated 01 June 2023 (PDF, 1 page, 67 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00108 IPD Team Roles and Responsibilities Sheet 17 revision 0 dated 01 June 2023 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00014 Roles and Responsibilities for Darlington New Build Engineering revision R001 dated September 2022 (PDF, 1 page, 66 KB)
- CMD 24-H3 OPG document NK054-COI-01210-00002 Contractor Owner Interface Agreement revision 0 dated March 2023 (PDF, 1 page, 66 KB)
- CMD 24-H3 CNSC Regulatory Document REGDOC-2.1.2 Safety Culture version 1 published April 2018 (PDF, 48 pages, 220 KB)
- CMD 24-H3 OPG document N-PROG-AS-0001 Nuclear Management System Administration revision R019 dated May 2021 (PDF, 16 pages, 465 KB)
- CMD 24-H3 OPG document OPG PROG 0009 Items and Services Management revision 3 dated October 2018 (PDF, 43 pages, 494 KB)
- CMD 24-H3 OPG document NK054-PLAN-01210-00100 DNNP Document Management Plan Sheet 18 revision R000 dated March 2022 (PDF, 1 page, 65 KB)
- CMD 24-H3 OPG PROG 0001-(R011)- Information-Management revision 11 dated October 4 2021 (PDF, 19 pages, 161 KB)
- CMD 24-H3 CNSC REGDOC-2.2.2 Personnel Training (Version 2) (PDF, 19 pages, 3.5 MB)
- CMD 24-H3 CNSC REGDOC-2.2.4 Fitness for Duty Volume 1: Managing Worker Fatigue (Version 1) (PDF, 28 pages, 3.69 MB)
- CMD 24-H3 CNSC REGDOC-2.2.4 Fitness for Duty Volume 2: Managing Alcohol and Drug Use (Version 3) (PDF, 42 pages, 5.5 MB)
- CMD 24-H3 N-PROG-AS-0002 Human Performance Program (Rev 18) (PDF, 26 pages, 388)
- CMD 24-H3 N-PROG-TR-0005 Training (Rev 19) (PDF, 18 pages, 320 KB)
- CMD 24-H3 N PROC TR 0008 Systematic Approach to Training (Rev 24) (PDF, 18 pages, 320 KB)
- CMD 24-H3 N LIST 08920 10001 Nuclear Training Programs (Rev 11) (PDF, 7 pages, 152 KB)
- CMD 24-H3 NK054-PLAN-01210-00034 Darlington New Nuclear Project (DNNP) Health and Safety Plan (Rev 1) (PDF, 15 pages, 1.15 MB)
- CMD 24-H3 NK054 REP 01210 00193 2023 Annual Report for Licensed Activities at the Darlington New Nuclear Project (PDF, 50 pages, 526 KB)
- CMD 24-H3 CNSC REGDOC-2.8.1 Conventional Health and Safety (PDF, 24 pages, 526 KB)
- CMD 24-H3 OPG POL-0001 Employee Health and Safety Policy (Rev 17) (PDF, 1 page, 75 KB)
- CMD 24-H3 OPG PROC-0120 Safety Incident and Regulatory Event Response (Rev 5) (PDF, 46 pages, 594 KB)
- CMD 24-H3 OPG-PROC-0121 Safety Incident Investigation and Corrective Actions (Rev 3) (PDF, 26 pages, 448 KB)
- CMD 24-H3 CNSC Regulatory Document REGDOC-2.9.1 Environmental Principles Assessments and Protection Measures version 12 published September 2020 (PDF, 7 pages, 84 KB)
- CMD 24-H3 OPG policy document OPG POL-0021 Environmental Policy revision 9X dated August 2021 (PDF, 1 page, 100 KB)
- CMD 24-H3 OPG document NK054-PLAN-07730-00022 DNNP Environmental Management and Protection Plan (EMPP) revision 0 dated 15 February 2022 (PDF, 49 pages, 807 KB)
- CMD 24-H3 OPG document NK054 PLAN 07730 00014 Environmental Monitoring and Environmental Assessment Follow Up (EMEAF) Plan revision 2 dated 14 December 2023 (PDF, 138 pages, 1.81 MB)
- CMD 24-H3 OPG document N PROC OP 0025 Management of the Environmental Monitoring Programs revision 12 dated July 2021 (PDF, 38 pages, 444 KB)
- CMD 24-H3 OPG report N-REP-03443-0029-2022 Results of Environmental Monitoring Programs for Darlington and Pickering Nuclear revision 0 dated 07 April 2023 (PDF, 116 pages, 1.89 MB)
- CMD 24-H3 OPG document OPG PROG 0005 Environment Health and Safety Managed System revision 8 dated 03 June 2021 (PDF, 34 pages, 784 KB)
- CMD 24-H3 OPG program manual NK38-MAN-03443-10002 Darlington Environmental Monitoring Program revision 0 Dated (PDF, 29 pages, 726 KB)
- CMD 24-H3 CNSC REGDOC 2101 Nuclear Emergency Preparedness and Response (Version 2) (PDF, 56 pages, 488 KB)
- CMD 24-H3 Government of Ontario Provincial Nuclear Emergency Response Plan (PNERP) Master Plan (2017 ed) (PDF, 228 pages, 1.74 MB)
- CMD 24-H3 Waste Management, Volume I: Management of Radioactive Waste (PDF, 21 pages, 571 Ko)
- CMD 24-H3 CNSC REGDOC-2.11.2 Decommissioning (Version 1) (PDF, 28 pages, 262 KB)
- CMD 24-H3 OPG-STD-0156 Management of Wastes and Other Environmentally Regulated Materials (Rev 3) (PDF, 63 pages, 544 KB)
- CMD 24-H3 NK054 PLAN 03460 00001 Solid Radioactive Waste Management Strategy (Rev 0) (PDF, 30 pages, 682 KB)
- CMD 24-H3 NK054-PLAN-00960-00006 Preliminary Decommissioning Plan for the Darlington New Nuclear Project: As Built (Rev 0) (PDF, 95 pages, 2.49 MB)
- CMD 24-H3 NK054PLAN0096000007 Preliminary Decommissioning Plan for the Darlington New Nuclear Project: End of Life (Rev 0) (PDF, 110 pages, 1.97 MB)
- CMD 24-H3 IAEA INFCIRC-140 Treaty on the Non Proliferation of Nuclear Weapons (NPT) (PDF, 5 pages, 24 KB)
- CMD 24-H3 CNSC REGDOC-2.13.1 Safeguards and Nuclear Material Accountancy (Version 1) (PDF, 63 pages, 378 KB)
- CMD 24-H3 N PROG RA 0015 Safeguards and Nuclear Material Accountancy (Rev 10) (PDF, 48 pages, 410 KB)
- CMD 24-H3 REGDOC-2.13.2 Import and Export (Version 2) (PDF, 33 pages, 522 KB)
- CMD 24-H3 CNSC Licence PRSL 1800/2031 Nuclear Power Reactor Site Preparation Licence for Ontario Power Generation New Nuclear at Darlington Generating Station (PDF, 4 pages, 164 KB)
- CMD 24-H3 - CNSC CMD 24-H2 CNSC Staff Review and Assessment of the Applicability of the DNNP Environmental Assessment to OPG’s Selection of the General Electric Hitachi BWRX 300 Reactor (PDF, 127 pages, 978 KB)
- CMD 24-H3 CNSC Commission Record of Decision Ontario Power Generation Application to Renew the Power Reactor Site Preparation Licence for the Darlington New Nuclear Project (PDF, 44 pages, 560 KB)
- CMD 24-H3 CNSC Commission Record of Decision Ontario Power Generation Applicability of the BWRX 300 Reactor to the DNNP Environmental Assessment (PDF, 85 pages, 712 KB)
- CMD 24-H3 - CNSC CMD 21-M5 Presentation from CNSC Staff Regulatory Readiness Small Modular Reactor Projects (PDF, 59 pages, 1.11 MB)
- CMD 24-H3 NK054-REP-01210-00078 Darlington New Nuclear Project Commitments Report (Rev 9) (PDF, 194 pages, 1.69 MB)
- CMD 24-H3 CNSC REGDOC-1.1.2 Licence Application Guide: Licence to Construct a Reactor Facility (Version 2) (PDF, 94 pages, 732 KB)
- CMD 24-H3 CNSC REGDOC-2.5.2 Design of Reactor Facilities (Version 1) (PDF, 183 pages, 1.16 MB)
- CMD 24-H3 GEH-005N9751 BWRX 300 General Description (Rev F) (PDF, 95 pages, 2.44 MB)
- CMD 24-H3 CNSC REGDOC-3.2.2 Indigenous Engagement (Version 12) (PDF, 24 pages, 214 KB)
- CMD 24-H3 CNSC Workshop Summary: Public Consultation on OPG's Chosen Technology for its Proposed Darlington New Nuclear Project (PDF, 122 pages, 451 KB)
- CMD 24-H3 NK054-CORR-00531-10735DNNP Submission of Package #1 Management Aspects Deliverables in Support of the Licence to Construct Application for the CNSC Review (PDF, 124 pages, 1.87 MB)
- CMD 24-H3 N STD AS 0013 Nuclear Public Information Disclosure (PDF, 22 pages, 428 KB)
- CMD 24-H3 CNSC Desktop Inspection on OPG's Public Information and Disclosure Program (July 2023) (PDF, 21 pages, 270 KB)
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced documents - Volume 4
- CMD-24-H3 CNSC REGDOC-3.2.2 Indigenous Engagement (Version 1 2) (PDF, 25 pages, 226 KB)
- CMD-24-H3-Ref-4-CNSC-Commission-Record-of-Decision-Ontario-Power-Generation-Applicability-of-the-BWRX-300-Reactor-to-the-DNNP-Environmental-Assessment (PDF, 86 pages, 728 KB)
- CMD-24-H3 Minister of the Department of Aboriginal Affairs and Northern Development Canada “Aboriginal Consultation and Accomodation Updated Guidelines for Federal Officials to Fulfill the Duty to Consult” (2011) (PDF, 70 pages, 802 KB)
- CMD-24-H3 The United Nations Declaration on the Rights of Indigenous Peoples September 2007 (PDF, 33 pages, 168 KB)
- CMD-24-H3 Justice Canada United Nations Declaration on the Rights of Indigenous Peoples Act Implementation Secretariat The United Nations Declaration on the Rights of Indigenous Peoples Act Action Plan (2023) (PDF, 75 pages, 913 KB)
- CMD-24-H3 Government of Canada Principles respecting the Government of Canada's relationship with Indigenous peoples (2018) (PDF, 19 pages, 1.18 MB)
- CMD-24-H3 Government of Canada Backgrounder United Nations Declaration on the Rights of Indigenous Peoples Act (PDf, 7 pages, 173 KB)
- CMD-24-H3 Darlington New Nuclear Power Plant Project Joint Review Panel Darlington New Nuclear Power Plant Project Joint Review Panel Environmental Assessment Report Minister of Environment Government of Canada (2011) (PDf, 188 pages, 2.6 MB)
- CMD-24-H3 Government of Canada Statement of Apology for the Impacts of the 1923 Williams Treaties (2018) (PDF, 6 pages, 577 KB)
- CMD-24-H3 NK054-REP-00531-10771 Darlington New Nuclear Project Indigenous Engagement Report April 2020 to February 2023 (PDf, 48 pages, 839 KB)
- CMD-24-H3 NK054-REP-00531-1330434 Darlington New Nuclear Project Indigenous Engagement Report March 2023 to November 2023 (PDf, 48 pages, 667 KB)
-
CMD 24-H3 - Application for a Licence to Construct a BWRX-300 Reactor at the Darlington New Nuclear Project Site (DNNP) - Referenced Documents - Volume 1
- Published on October 15, 2024
- Published on October 11, 2024
- Published on October 2, 2024
-
Published on October 1, 2024
- CMD 24-H3.1A – Supplementary Information - Written submission from Ontario Power Generation - Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project (PDF, 111 pages, 1558 KB)
- CMD 24-H3.1B - Presentation from Ontario Power Generation - Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project (PDF, 35 pages, 6505 KB)
- CMD 24-H3.2 - Public Comments on the Request for Confidentiality (PDF, 32 pages, 3433.1 KB)
- Revised Agenda for October 2, 2024 Public Hearing – Ref. CMD 24-H6.A (PDF, 2 pages, 159 KB)
- Published on September 25, 2024
- Published on September 24, 2024
- Published on September 5, 2024
-
Published on August 28, 2024
- Request to protect confidential information in relation to OPG Confidential DNNP Submission Package #6(b) (PDF, 10 pages, 478 KB)
- Request to protect confidential information in relation to CMD 24-H3 (PDF, 1,656 pages, 79,733 KB)
- Request to protect confidential information in relation to CMD 24-H3.1 (PDF, 1,823 pages, 81,821 KB)
- Request to protect confidential information in relation to document NK054-CORR-00531-10740 (PDF, 757 pages, 22,863 KB)
- Published on August 22, 2024
-
Published on July 2, 2024
- CMD 24-H3 – Submission from CNSC - Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project (PDF, 1126 pages, 14.02 MB)
- CMD 24-H3.1 – Submission from Ontario Power Generation - Application for a licence to construct one BWRX-300 reactor for its Darlington New Nuclear Project (PDF, 184 pages, 3.58 MB)
- Published on June 27, 2024
June 2024 Hearing in writing – Ontario Power Generation – Pickering Waste Management Facility
Application to change the licensing basis for the Pickering Waste Management Facility (PWMF)
June 2024, Hearing in writing
- Published on November 14, 2024
-
Published on August 30, 2024
- Addendum - Application from Ontario Power Generation to change the licensing basis for the Pickering Waste Management Facility (PDF, 104 pages, 2.42 MB)
- Application from Ontario Power Generation to change the licensing basis for the Pickering Waste Management Facility (PDF, 265 pages, 10.9 MB)
- Notice of Hearing in Writing and Participant Funding - Ontario Power Generation - Application to change the licensing basis for the Pickering Waste Management Facility (PDF, 2 pages, 243 KB)
- Revised Notice of Hearing in Writing and Participant Funding – Ontario Power Generation – Application to change the licensing basis for the Pickering Waste Management Facility (PDF, 2 pages, 246 KB)
- Published on August 20, 2024
- Published on august 19, 2024
- Published on July 16, 2024
- Published on July 12, 2024
- Published on July 8, 2024
- Published on June 25, 2024
-
Published on June 17, 2024
- CMD 24-H102.2 – Submission from CANDU Owners Group Inc. (PDF, 4 pages, 395 KB)
- CMD 24-H102.3 – Submission from Christine Drimmie (PDF, 4 pages, 254 KB)
- CMD 24-H102.4 – Submission from Northwatch (PDF, 19 pages, 657 KB)
- CMD 24-H102.5 – Submission from the Mississaugas of Scugog Island First Nation (PDF, 15 pages, 657 KB)
- Published on June 7 , 2024
- Published on April 12, 2024
Public Hearing of June 19-20, 2024 – Ontario Power Generation - Pickering Nuclear Generating Station
Application to extend the operation of Pickering Nuclear Generating Station Units 5 to 8 until December 31, 2026
- Download all documents for the June 19-20, 2024 public hearing - Part-1 (ZIP, 45.5 MB)
- Download all documents for the June 19-20, 2024 public hearing - Part 2 (ZIP, 39.9 MB)
- Download a particular PDF document for the June 19-20, 2024 public hearing
June 19-20, 2024 public hearing
- Published on December 5 , 2024
-
Published on August 30, 2024
- Notice of Public Hearing and Participant Funding - Ontario Power Generation - Application to extend the operation of Pickering NGS Units 5 to 8 until December 31, 2026 - Ref. 2024-H-05 (PDF, 3 pages, 257 KB)
- Revised Notice of Public Hearing - Ontario Power Generation - Application to extend the operation of Pickering NGS Units 5 to 8 until December 31, 2026 - Ref. 2024-H-05 (PDF, 3 pages, 249 KB)
- Published on June 27, 2024
- Published on June 18, 2024
- Published on June 17, 2024
-
Published on June 7, 2024
- Revised Agenda for June 19-20, 2024 Public Hearing
- CMD 24-H5.A – Presentation from CNSC - Application to extend the operation of Pickering Nuclear Generating Station Units 5 to 8 until December 31, 2026 (PDF, 36 pages, 1.209 KB)
- CMD 24-H5.1B – Presentation from Ontario Power Generation - Application to extend the operation of Pickering Nuclear Generating Station Units 5 to 8 until December 31, 2026 (PDF, 26 pages, 11041 KB)
- CMD 24-H5.1C – Supplementary submission from Ontario Power Generation on Request for Ruling, 2026 (PDF, 9 pages, 434 KB)
- CMD 24-H5.29A – Presentation from the Durham Nuclear Awareness, Slovenian Home Association, and the Canadian Environmental Law Association, 2026 (PDF, 26 pages, 2.38 MB)
- CMD 24-H5.34A.pdf – Presentation from the Canadian Nuclear Society, 2026 (PDF, 8 pages, 264 KB)
- CMD 24-H5.35A – Presentation from Paul Sedran, RESD Inc., 2026 (PDF, 8 pages, 599 KB)
- CMD 24-H5.40A – Presentation from Kinectrics, 2026 (PDF, 11 pages, 1114 KB)
- CMD 24-H5.49A – Presentation from Mississaugas of Scugog Island First Nation, 2026 (PDF, 12 pages, 1073 KB)
- Published on May 23, 2024
- Published on May 22, 2024
-
Published on May 17, 2024
- CMD 24-H5.54 – Submission from the Hiawatha First Nation (PDF, 9 pages, 593 KB)
- CMD 24-H5.55 – Submission from the Curve Lake First Nation (PDF, 6 pages, 1.14 MB)
- CMD 24-H5.33B – Supplementary submission from the Pickering Harbour Company Limited, Frenchman's Bay Harbour & Marine Service Company Limited (PDF, 4 pages, 788 KB)
-
Published on May 9, 2024
- CMD 24-H5.50 – Submission from Graymatter Marketing and Media Solutions Inc. (PDF, 2 pages, 356 KB)
- CMD 24-H5.51 – Submission from Whitby Chamber of Commerce (PDF, 3 pages, 188 KB)
- CMD 24-H5.52 – Submission from the Society of Energy Professionals (PDF, 17 pages, 843 KB)
- CMD 24-H5.53 – Submission from the Saugeen Ojibway Nation (PDF, 9 pages, 403 KB)
- CMD 24-H5.33A – Supplementary submission from the Pickering Harbour Company Limited, Frenchman's Bay Harbour & Marine Service Company Limited (PDF, 4 pages, 521 KB)
-
Published on May 2, 2024
- CMD 24-H5.2 – Submission from the Greater Oshawa Chamber of Commerce (PDF, 2 pages, 286 KB)
- CMD 24-H5.3 – Submission from the Rotary Clubs of Ajax and Pickering (PDF, 2 pages, 475 KB)
- CMD 24-H5.4 – Submission from Station Gallery (PDF, 2 pages, 407 KB)
- CMD 24-H5.5 – Submission from 369 Global (PDF, 2 pages, 327 KB)
- CMD 24-H5.6 – Submission from the Town of Ajax (PDF, 3 pages, 277 KB)
- CMD 24-H5.7 – Submission from Lakeridge Health and the Ajax Pickering Hospital Foundation (PDF, 2 pages, 479 KB)
- CMD 24-H5.8 – Submission from the PineRidge Arts Council (PDF, 2 pages, 261 KB)
- CMD 24-H5.9 – Submission from the Abilities Centre (PDF, 2 pages, 357 KB)
- CMD 24-H5.10 – Submission from the CANDU Owners Group (PDF, 4 pages, 260 KB)
- CMD 24-H5.11 – Submission from Women in Nuclear Canada (PDF, 5 pages, 369 KB)
- CMD 24-H5.12 – Submission from Durham College (PDF, 3 pages, 210 KB)
- CMD 24-H5.13 – Submission from the Organization of Canadian Nuclear Industries (PDF, 3 pages, 409 KB)
- CMD 24-H5.14 – Submission from Earth Rangers (PDF, 2 pages, 661 KB)
- CMD 24-H5.15 – Submission from the North American Young Generation in Nuclear (PDF, 5 pages, 300 KB)
- CMD 24-H5.16 – Submission from Elexicon Energy (PDF, 2 pages, 312 KB)
- CMD 24-H5.17 – Submission from Matheis Financial Group (PDF, 2 pages, 279 KB)
- CMD 24-H5.18 – Submission from the Canadian Association of Nuclear Host Communities (PDF, 10 pages, 2.1 MB)
- CMD 24-H5.19 – Submission from the Durham Region Steps for Life Committee (PDF, 2 pages, 317 KB)
- CMD 24-H5.20 – Submission from BWXT Canada Ltd. (PDF, 3 pages, 370 KB)
- CMD 24-H5.21 – Submission from the Regional Municipality of Durham (PDF, 11 pages, 277 KB)
- CMD 24-H5.22 – Submission from the Durham Community Foundation (PDF, 3 pages, 224 KB)
- CMD 24-H5.23 – Submission from the Pickering Nuclear Community Advisory Council (PDF, 15 pages, 2.95 MB)
- CMD 24-H5.24 – Submission from the Pickering Naturalists (PDF, 3 pages, 367 KB)
- CMD 24-H5.25 – Submission from Gurley Leadership Solutions (PDF, 3 pages, 199 KB)
- CMD 24-H5.26 – Submission from the City of Pickering (PDF, 4 pages, 335 KB)
- CMD 24-H5.27 – Submission from the Scientists in School (PDF, 3 pages, 265 KB)
- CMD 24-H5.28 – Submission from Clarity Chiropractic (PDF, 2 pages, 239 KB)
- CMD 24-H5.29 – Submission from the Durham Nuclear Awareness, Slovenian Home Association, and the Canadian Environmental Law Association (PDF, 23 pages, 704 KB)
- CMD 24-H5.30 – Submission from the Ajax-Pickering Board of Trade (PDF, 3 pages, 468 KB)
- CMD 24-H5.31 – Submission from Paul Filteau (PDF, 2 pages, 196 KB)
- CMD 24-H5.32 – Submission from Janet Graham (PDF, 2 pages, 177 KB)
- CMD 24-H5.33 – Submission from the Pickering Harbour Company Limited, Frenchman's Bay Harbour & Marine Service Company Limited (PDF, 5 pages, 567 KB)
- CMD 24-H5.34 – Submission from the Canadian Nuclear Society (PDF, 4 pages, 729 KB)
- CMD 24-H5.35 – Submission from Paul Sedran, RESD Inc. (PDF, 9 pages, 818 KB)
- CMD 24-H5.36 – Submission from the Métis Nation of Ontario (PDF, 7 pages, 343 KB)
- CMD 24-H5.37 – Submission from Girls Incorporated of Durham (PDF, 2 pages, 433 KB)
- CMD 24-H5.38 – Submission from North American Young Generation in Nuclear – Durham Chapter (PDF, 5 pages, 327 KB)
- CMD 24-H5.39 – Submission from Nordion (Canada) Inc. (PDF, 5 pages, 469 KB)
- CMD 24-H5.40 – Submission from Kinectrics (PDF, 5 pages, 492 KB)
- CMD 24-H5.41 – Submission from the Ontario Tech University (PDF, 2 pages, 295 KB)
- CMD 24-H5.42 – Submission from the Ontario Federation of Anglers and Hunters (PDF, 3 pages, 285 KB)
- CMD 24-H5.43 – Submission from the Canadian Nuclear Association (PDF, 5 pages, 1 MB)
- CMD 24-H5.44 – Submission from the Canadian Coalition for Nuclear Responsibility (PDF, 4 pages, 263 KB)
- CMD 24-H5.45 – Submission from Northwatch (PDF, 25 pages, 900 KB)
- CMD 24-H5.46 – Submission from Sunil Nijhawan (PDF, 40 pages, 1.9 MB)
- CMD 24-H5.47 – Submission from Christine Drimmie (PDF, 3 pages, 238 KB)
- CMD 24-H5.48 – Submission from Canadians for Nuclear Energy (PDF, 18 pages, 694 KB)
- CMD 24-H5.49 – Submission from Mississaugas of Scugog Island First Nation (PDF, 18 pages, 652 KB)
-
Published on February 29, 2024
- CMD 24-H5 – Submission from CNSC - Application to extend the operation of Pickering Nuclear Generating Station Units 5 to 8 until December 31, 2026 (PDF, 149 pages, 2.01 MB)
- CMD 24-H5.1 – Submission from Ontario Power Generation - Application to extend the operation of Pickering Nuclear Generating Station Units 5 to 8 until December 31, 2026 (PDF, 135 pages, 5.9 MB)
- CMD 24-H5.1A – Supplementary submission from Ontario Power Generation - Application to extend the operation of Pickering Nuclear Generating Station Units 5 to 8 until December 31, 2026 (PDF, 33 pages, 8.23 MB)
April 2024 Hearing in writing – Ontario Power Generation – Darlington
Application for the Darlington Nuclear Generating Station’s licence amendment regarding the commercial production of Cobalt-60
April 2024 Hearing in writing – Ontario Power Generation – Darlington
- Published on November 21, 2024
-
Published on August 30, 2024
- Addendum - Application from Ontario Power Generation - Licence amendment for the Darlington Nuclear Generating Station regarding the commercial production of cobalt-60 (PDF, 138 pages, 4.21 MB)
- Application from Ontario Power Generation - Licence amendment for the Darlington Nuclear Generating Station regarding the commercial production of cobalt-60 (PDF, 114 pages, 3.29 MB)
- Record of Decision on Request to Protect Confidential Information – OPG’s application to amend its Darlington Nuclear Generating Station Power Reactor Operating Licence to authorize the production of the Cobalt-60 Radioisotope (PDF, 8 pages, 231 KB)
- Notice of Request for Confidentiality – Ontario Power Generation - Application to amend its Darlington Nuclear Generating Station power reactor operating licence to authorize the production of the cobalt-60 radioisotope (PDF, 1 page, 241 KB)
- Notice of hearing in writing and participant funding – Ontario Power Generation - Licence amendment application for the Darlington Nuclear Generating Station regarding the commercial production of cobalt-60 (PDF, 3 pages, 240 KB)
- Revised Notice of hearing in writing and participant funding – Ontario Power Generation - Licence amendment application for the Darlington Nuclear Generating Station regarding the commercial production of cobalt-60 - Revision 1 (PDF, 3 pages, 242 KB)
- Published on May 31, 2024
- Published on May 24, 2024
- Published on May 9, 2024
- Published on May 8, 2024
- Published on April 23, 2024
-
Published on April 10, 2024
- CMD 24-H101.3 – Submission from the Canadian Nuclear Isotope Council (PDF, 3 pages, 292 KB)
- CMD 24-H101.4 – Submission from the International Irradiation Association (PDF, 3 pages, 378 KB)
- CMD 24-H101.5 – Submission from Becton, Dickinson and Company (PDF, 2 pages, 320 KB)
- CMD 24-H101.6 – Submission from the Gamma Industry Processing Alliance (PDF, 2 pages, 298 KB)
- CMD 24-H101.7 – Submission from Gammatom s.r.l. (PDF, 2 pages, 407 KB)
- CMD 24-H101.8 – Submission from CANDU Owners Group (PDF, 3 pages, 401 KB)
- CMD 24-H101.9 – Submission from the Regional Municipality of Durham (PDF, 7 pages, 311 KB)
- CMD 24-H101.10 – Submission from Bruce Power (PDF, 3 pages, 280 KB)
- CMD 24-H101.11 – Submission from Nordion (Canada) Inc. (PDF, 5 pages, 489 KB)
- CMD 24-H101.12 – Submission from Kinectrics (PDF, 3 pages, 497 KB)
- CMD 24-H101.13 – Submission from the Mississaugas of Scugog Island First Nation (PDF, 6 pages, 383 KB)
- Published on April 2, 2024
- Published on March 18, 2024
- Published on March 14, 2024
- Published on March 4, 2024
April 2024 Hearing in Writing – McMaster University – Renewal
Application to renew its McMaster Nuclear Reactor Class IA non-power reactor operating licence
April 2024 Hearing in Writing – McMaster University – Renewal
-
Published on October 23, 2024
- Record of Decision – McMaster University - Application to renew the McMaster Nuclear Reactor Class IA non-power reactor operating licence (PDF, 39 pages, 1.11 MB)
- Errata to Record of Decision – McMaster University - Application to renew the McMaster Nuclear Reactor Class IA non-power reactor operating licence (PDF, 4 pages, 183 KB)
-
Published on August 30, 2024
- Application from McMaster University to renew its McMaster Nuclear Reactor Class IA non-power reactor operating licence (PDF, 111 pages, 4.53 MB)
- Notice of Hearing in Writing and Participant Funding - McMaster University - Application to renew its McMaster Nuclear Reactor Class IA non-power reactor operating licence - Ref. 2024-H-100 (PDF, 3 pages, 203 KB)
- Published on April 18, 2024
- Published on April 17, 2024
-
Published on March 19, 2024
- CMD 24-H100.2 – Submission from Bureau Veritas (PDF, 2 pages, 263 KB)
- CMD 24-H100.3 – Submission from Williams College (PDF, 2 pages, 182 KB)
- CMD 24-H100.4 – Submission from Activation Laboratories Ltd. (PDF, 3 pages, 279 KB)
- CMD 24-H100.5 – Submission from Applus+ NRAY Services (PDF, 2 pages, 348 KB)
- CMD 24-H100.6 – Submission from Isologic Innovative Radiopharmaceuticals (PDF, 2 pages, 375 KB)
- CMD 24-H100.7 – Submission from AtomVie Global Radiopharma (PDF, 3 pages, 442 KB)
- CMD 24-H100.8 – Submission from Canadian Light Source (PDF, 2 pages, 366 KB)
- CMD 24-H100.9 – Submission from David Winfield (PDF, pages, 432 KB)
- CMD 24-H100.10 – Submission from the Canadian Nuclear Laboratories (PDF, 3 pages, 261 KB)
- CMD 24-H100.11 – Submission from CANDU Owners Group Inc. (PDF, 3 pages, 355 KB)
- CMD 24-H100.12 – Submission from Bruce Power (PDF, 3 pages, 320 KB)
- CMD 24-H100.13 – Submission from Neutrons Canada (PDF, 3 pages, 616 KB)
- CMD 24-H100.14 – Submission from the Canadian Nuclear Isotope Council (PDF, 3 pages, 246 KB)
- CMD 24-H100.15 – Submission from Paul Sedran, RESD Inc. (PDF, 10 pages, 585 KB)
- CMD 24-H100.16 – Submission from Ontario Power Generation (PDF, 3 pages, 341 KB)
- CMD 24-H100.17 – Submission from Michael LaFontaine (PDF, 2 pages, 767 KB)
- CMD 24-H100.18 – Submission from TRIUMF (PDF, 3 pages, 292 KB)
-
Published on February 19, 2024
- CMD 24-H100.A – Submission from CNSC Staff on the application from McMaster University to renew the McMaster Nuclear Reactor Class IA non-power reactor operating licence (PDF, 72 pages, 3.06 MB)
- CMD 24-H100.1 – Submission from McMaster University for the application to renew its McMaster Nuclear Reactor Class IA non-power reactor operating licence (PDF, 112 pages, 4.65 MB)
March 21, 2024 - Designation of 2 Additional Designated Officers by Title of Office for the Transport Licensing and Strategic Support Division
March 21, 2024 - Designation of 2 Additional Designated Officers by Title of Office for the Transport Licensing and Strategic Support Division
February 2024 Hearing in writing – BWXT Nuclear Energy Canada Inc. Toronto and Peterborough Facilities
Request from BWXT Nuclear Energy Canada Inc. for the acceptance of the revised financial guarantees for its facilities in Toronto and Peterborough, Ontario
February 2024 Hearing in writing – BWXT Nuclear Energy Canada Inc. Toronto and Peterborough Facilities
-
Published on August 30, 2024
- Record of Decision – BWXT NEC Inc. – Commission Ruling on Request to Protect Confidential Information (PDF, 2 pages, 335 KB)
- Record of Decision - BWXT Nuclear Energy Canada Inc. – Application for Acceptance of the Revised Financial Guarantees Proposed by BWXT Nuclear Energy Canada Inc. for its Toronto and Peterborough Facilities (PDF, 11 pages, 459 KB)
- Notice of Request for Confidentiality - BWXT Nuclear Energy Canada Inc. - Financial Guarantees for Toronto and Peterborough Installations (PDF, 1 pages, 177 KB)
- Notice of hearing in writing - BWXT Nuclear Energy Canada Inc. - Request for acceptance of the revised financial guarantees for its facilities in Toronto and Peterborough (PDF, 2 pages, 196 KB)
- BWXT Nuclear Energy Canada Inc. – Request to protect confidential information (PDF, 2 pages, 180 KB)
- Revised Notice of Request for Confidentiality - BWXT Nuclear Energy Canada Inc. - Financial Guarantees for Toronto and Peterborough Installations - Revision 1 (PDF, 1 page, 184 KB)
- Revised Notice of hearing in writing - BWXT Nuclear Energy Canada Inc. - Request for acceptance of the revised financial guarantees for its facilities in Toronto and Peterborough - Revision 1 (PDF, 2 pages, 199 KB)
- Published on March 6, 2024
- Published on February 26, 2024
- Published on February 23, 2024
- Published on February 16, 2024
- Published on December 18, 2023
- Published on December 8, 2023
January 23-25, 2024 Public Hearing – OPG Darlington New Nuclear Project
Applicability of the OPG Darlington New Nuclear Project environmental assessment and plant parameter envelope to selected reactor technology
- Download all documents for the January 23-25, 2024 public hearing - Part 1 (ZIP, 51.4 MB)
- Download all documents for the January 23-25, 2024 public hearing - Part 2 (ZIP, 38.9 MB)
January 23-25, 2024 public hearing
-
Published on August 30, 2024
- Agenda for the January 23 to 25, 2024 Public Hearing (PDF, 6 pages, 308 KB)
- Revised Agenda for the January 23 to 25, 2024 Public Hearing (PDF, 6 pages, 309 KB)
- Notice of Public Hearing and Participant Funding - OPG - Applicability of the Darlington New Nuclear Project environmental assessment and plant parameter envelope to selected reactor technology (PDF, 4 pages, 130 KB)
- Revised Notice of Public Hearing - OPG - Applicability of the Darlington New Nuclear Project environmental assessment and plant parameter envelope to selected reactor technology - Revision 1 (PDF, 3 pages, 210 KB)
- Published on March 5, 2024
- Published on March 5, 2024
-
Published on December 21, 2023
- CMD 24-H2.A – Presentation from CNSC staff (PDF, 37 pages, 2.27 MB)
- CMD 24-H2.1A – Presentation from OPG (PDF, 42 pages, 10.87 MB)
- CMD 24-H2.8A – Presentation from Durham Nuclear Awareness, Slovenian Home Association and the Canadian Environmental Law Association (PDF, 30 pages, 944 KB)
- CMD 24-H2.23A, CMD 24-H2.25A and CMD 24-H2.26A – Joint presentation from the Hiawatha First Nation, the Curve Lake First Nation and the Mississaugas of Scugog Island First Nation (PDF, 19 pages, 3.49 MB)
- CMD 24-H2.28A – Presentation from Bill Noll (PDF, 6 pages, 315 KB)
- CMD 24-H2.32A – Presentation from Northwatch (PDF, 12 pages, 382 KB)
- CMD 24-H2.39A – Presentation from the Radiation Safety Institute of Canada (PDF, 14 pages, 671 KB)
- CMD 24-H2.41A – Presentation from the Regional Municipality of Durham (PDF, 7 pages, 1.77 MB)
-
Published on November 22, 2023
- CMD 24-H2.2 – Written submission from the Waterfront Regeneration Trust (PDF, 11 pages, 6.1 MB)
- CMD 24-H2.3 – Written submission from E.S. Fox Limited (PDF, 6 pages, 289 KB)
- CMD 24-H2.4 – Written submission from the Darlington Nuclear Community Advisory Council (PDF, 14 pages, 462 KB)
- CMD 24-H2.5 – Written submission from AtkinsRéalis (PDF, 5 pages, 331 KB)
- CMD 24-H2.6 – Written submission from The Society of United Professionals (PDF, 9 pages, 707 KB)
- CMD 24-H2.7 – Written submission from the Durham College (PDF, 3 pages, 304 KB)
- CMD 24-H2.8 – Written submission from Durham Nuclear Awareness, Slovenian Home Association and the Canadian Environmental Law Association (PDF, 25 pages, 506 KB)
- CMD 24-H2.9 – Written submission from Susan O’Donnell (PDF, 2 pages, 615 KB)
- CMD 24-H2.10 – Written submission from Sarah Gabrielle Baron (PDF, 6 pages, 202 KB)
- CMD 24-H2.11 – Written submission from Dale Dewar (PDF, 2 pages, 585 KB)
- CMD 24-H2.12 – Written submission from the Municipality of Clarington (PDF, 3 pages, 254 KB)
- CMD 24-H2.13 – Written submission from the Organization of Canadian Nuclear Industries (PDF, 3 pages, 467 KB)
- CMD 24-H2.14 – Written submission from the North American Young Generation in Nuclear, Durham Chapter (PDF, 3 pages, 388 KB)
- CMD 24-H2.15 – Written submission from the North American Young Generation in Nuclear (PDF, 6 pages, 296 KB)
- CMD 24-H2.16 – Written submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 610 KB)
- CMD 24-H2.17 – Written submission from Kinectrics Inc. (PDF, 4 pages, 329 KB)
- CMD 24-H2.18 – Written submission from Bruce Power (PDF, 4 pages, 215 KB)
- CMD 24-H2.19 – Written submission from Ann McAllister (PDF, 5 pages, 232 KB)
- CMD 24-H2.20 – Written submission from John D. Jacobs (PDF, 2 pages, 646 KB)
- CMD 24-H2.21 – Written submission from the GEH SMR Technologies Canada, Ltd. (GEH SMR Canada) and GEHitachi Nuclear Energy America, LLC (GEH-A) (PDF, 9 pages, 374 KB)
- CMD 24-H2.22 – Written submission from the Saugeen Ojibway Nation (PDF, 15 pages, 366 KB)
- CMD 24-H2.23 – Written submission from the Hiawatha First Nation (PDF, 85 pages, 1.04 MB)
- CMD 24-H2.24 – Written submission from the Canadian Nuclear Association (PDF, 3 pages, 823 KB)
- CMD 24-H2.25 – Written submission from the Curve Lake First Nation (PDF, 86 pages, 713 KB)
- CMD 24-H2.26 – Written submission from the Mississaugas of Scugog Island First Nation (PDF, 29 pages, 590 KB)
- CMD 24-H2.27 – Written submission from the Clarington Board of Trade (PDF, 4 pages, 497 KB)
- CMD 24-H2.28 – Written submission from Bill Noll (PDF, 3 pages, 656 KB)
- CMD 24-H2.29 – Written submission from Cathy Vakil (PDF, 6 pages, 732 KB)
- CMD 24-H2.30 – Written submission from the Concerned Citizens of Renfrew County and Area (PDF, 3 pages, 568 KB)
- CMD 24-H2.31 – Written submission from the Nuclear Waste Management Organization (PDF, 3 pages, 347 KB)
- CMD 24-H2.32 – Written submission from Northwatch (PDF, 41 pages, 1.69 MB)
- CMD 24-H2.33 – Written submission from Gordon Edwards (PDF, 10 pages, 804 KB)
- CMD 24-H2.34 – Written submission from the Métis Nation of Ontario (PDF, 5 pages, 265 KB)
- CMD 24-H2.35 – Written submission from the Nuclear Transparency Project (PDF, 124 pages, 1.69 MB)
- CMD 24-H2.36 – Written submission from Evelyn Gigantes (PDF, 3 pages, 588 KB)
- CMD 24-H2.37 – Written submission from Simon J. Daigle (PDF, 9 pages, 392 KB)
- CMD 24-H2.38 – Written submission from Dennis LeNeveu (PDF, 4 pages, 204 KB)
- CMD 24-H2.39 – Written submission from the Radiation Safety Institute of Canada (PDF, 11 pages, 537 KB)
- CMD 24-H2.40 – Written submission from BWXT Canada Ltd. (PDF, 4 pages, 377 KB)
- CMD 24-H2.41 – Written submission from the Regional Municipality of Durham (PDF, 10 pages, 313 KB)
- Published on September 19, 2023
December 2023 hearing in writing – Cameco Corporation – Port Hope Conversion Facility
Revised preliminary decommissioning plan and financial guarantee for Cameco Corporation’s Port Hope Conversion Facility
December 2023 hearing in writing – Cameco Corporation – Port Hope Conversion Facility
- Published on June 17, 2024
- Published on March 22, 2024
- Published on March 11, 2024
- Published on March 7, 2024
- Published on February 21, 2024
- Published on January 11, 2024
-
Published on December 22, 2023
- CMD 23-H107.2 – Written submission from Evelyn Gigantes (PDF, 3 pages, 205 KB)
- CMD 23-H107.3 – Written submission from Sarah Gabrielle Baron (PDF, 9 pages, 256 KB)
- CMD 23-H107.4 – Written submission from Gilles Provost (PDF, 6 pages, 281 KB)
- CMD 23-H107.5 – Written submission from Susan O’Donnell (PDF, 3 pages, 222 KB)
- CMD 23-H107.6 – Written submission from the Council of Canadians KitchissippiOttawa Valley (PDF, 5 pages, 885 KB)
- CMD 23-H107.7 – Written submission from Northwatch (PDF, 28 pages, 1.02 MB)
- CMD 23-H107.8 – Written submission from Alexandra Franche (PDF, 2 pages, 239 KB)
- CMD 23-H107.9 – Written submission from the Nuclear Transparency Project (PDF, 4 pages, 265 KB)
- Published on December 5, 2023
-
Published on October 13, 2023
- CMD 23-H107 – Submission from CNSC Staff on Cameco Corporation’s for the revised preliminary decommissioning plan and financial guarantee for Port Hope Conversion Facility (PDF, 19 pages, 1.24 MB)
- CMD 23-H107.1 – Submission from Cameco Corporation on the revised preliminary decommissioning plan and financial guarantee for Port Hope Conversion Facility (PDF, 3 pages, 979 KB)
August 2023 hearing in writing – Collège d'enseignement général et professionnel (Cégep) de Trois-Rivières
Application by the Collège d'enseignement général et professionnel de Trois-Rivières for a change to the dosimetry period
August 2023 hearing in writing – Collège d'enseignement général et professionnel (Cégep) de Trois-Rivières
- Published on August 9, 2023
- Published on July 26, 2023
August 10, 2023 Public Hearing
Application from the Canadian Nuclear Laboratories to amend its Chalk River Laboratories site licence to authorize the construction of a near surface disposal facility
August 10, 2023 Public Hearing
- Published on July 31, 2023
- Published on July 13, 2023
-
Published on June 30, 2023
- CMD 22-H7.139B – Final submission from the Mitchikanibikok Inik, Algonquins of Barriere Lake (PDF, 15 pages, 372 KB)
- CMD 22-H7.109D – Final submission from the Algonquins of Pikwàkanagàn First Nation (PDF, 14 pages, 463 KB)
- CMD 22-H7.111D & CMD 22-H7.113C – Final submission from the Kebaowek First Nation and the Kitigan Zibi Anishinabeg First Nation (PDF, 25 pages, 460 KB)
- Published on June 26, 2023
- Published on June 19, 2023
-
Published on June 15, 2023
- CMD 22-H7.E – Supplementary submission from CNSC staff (PDF, 17 pages, 267 KB)
- CMD 22-H7.10A – Final submission from the Organization of Canadian Nuclear Industries (PDF, 3 pages, 195 KB)
- CMD 22-H7.9A – Final submission from the North American Young Generation in Nuclear (PDF, 2 pages, 195 KB)
- CMD 22-H7.101A – Final submission from the County of Renfrew (PDF, 5 pages, 1.68 MB)
- CMD 22-H7.39A – Final submission from the Corporation of the Town of Deep River (PDF, 7 pages, 10.59 MB)
- CMD 22-H7.129A – Final submission from the Ottawa River Institute (PDF, 5 pages, 261 KB)
- CMD 22-H7.105A – Final submission from the Ralliement contre la pollution radioactive (PDF, 11 pages, 480 KB)
- CMD 22-H7.81B – Final submission from the Nuclear Waste Management Organization (PDF, 2 pages, 233 KB)
- CMD 22-H7.117B – Final submission from the Ottawa Chapter of the Council of Canadians (PDF, 6 pages, 344 KB)
- CMD 22-H7.144A – Final submission from the Canadian Coalition for Nuclear Responsibility (PDF, 12 pages, 1.19 MB)
- CMD 22-H7.136B – Final submission from Lynn Jones (PDF, 9 pages, 1.95 MB)
- CMD 22-H7.99C – Final submission from Atomic Energy of Canada Limited (PDF, 5 pages, 368 KB)
- CMD 22-H7.45A – Final submission from Kitchissippi–Ottawa Valley Chapter, Council of Canadians (PDF, 14 pages, 734 KB)
- CMD 22-H7.41B – Final submission from the Sierra Club Canada Foundation (PDF, 8 pages, 417 KB)
- CMD 22-H7.74B – Final submission from the Concerned Citizens of Renfrew County and Area (PDF, 14 pages, 319 KB)
- CMD 22-H7.143A – Final submission from the Greenspace Alliance of Canada's Capital (PDF, 6 pages, 247 KB)
- CMD 22-H7.124A – Final submission from Kathryn Lindsay (PDF, 6 pages, 528 KB)
- CMD 22-H7.64B – Final submission from William Turner (PDF, 14 pages, 563 KB)
- CMD 22-H7.108A – Final submission from Bruce Power (PDF, 2 pages, 209 KB)
- CMD 22-H7.79A – Final submission from Ipsos Custodes (PDF, 3 pages, 139 KB)
- CMD 22-H7.96A – Final submission from the CANDU Owners Group Inc. (PDF, 3 pages, 558 KB)
- CMD 22-H7.40A – Final submission from the City of Pembroke (PDF, 3 pages, 793 KB)
- CMD 22-H7.19B – Final submission from Evelyn Gigantes (PDF, 8 pages, 255 KB)
- CMD 22-H7.104B – Final submission from the Canadian Environmental Law Association (PDF, 10 pages, 338 KB)
- CMD 22-H7.84A – Final submission from Georgina Bartos (PDF, 2 pages, 118 KB)
- CMD 22-H7.88A – Final submission from the Canadian Nuclear Association (PDF, 4 pages, 1006 KB)
- CMD 22-H7.36B – Final submission from the Old Fort William Cottagers' Association (OFWCA) (PDF, 4 pages, 251 KB)
- CMD 22-H7.69A – Final submission from Pontiac Environment Protection (PDF, 5 pages, 272 KB)
- CMD 22-H7.63B – Final submission from James R. Walker (PDF, 14 pages, 261 KB)
-
Published on May 16, 2023
- CMD 22-H7.1E – Supplementary submission from the Canadian Nuclear Laboratories (PDF, 225 pages, 4.32 MB)
- CMD 22-H7.99B – Supplementary submission from Atomic Energy of Canada Limited (PDF, 6 pages, 614 KB)
- CMD 22-H7.D – Supplementary submission from CNSC staff (PDF, 173 pages, 2.01 MB)
- CMD 22-H7.111C – Supplementary submission from the Kebaowek First Nation (PDF, 86 pages, 3.54 MB)
- CMD 22-H7.113B – Submission from the Kitigan Zibi Anishinabeg First Nation (PDF, 1025 pages, 271 MB)
June 7-8, 2023 Public Hearings
Application by Cameco Corporation for the renewal of the licences for Key Lake and McArthur River Operations
- Download all documents for the June 7-8, 2023 public hearings - Part 1 (ZIP, 68 MB)
- Download all documents for the June 7-8, 2023 public hearings - Part 2 (ZIP, 41 MB)
June 7-8, 2023 public hearings
- Published on July 26, 2023
-
Published on May 26, 2023
- CMD 23-H6.A – Supplementary submission from CNSC Staff (PDF, 98 pages, 2.62 MB)
- CMD 23-H6.B – Supplementary submission from CNSC Staff (PDF, 104 pages, 2.94 MB)
- CMD 23-H6.C & CMD 23-H7.C – Presentation from CNSC Staff (PDF, 39 pages, 1.57 MB)
- CMD 23-H6.1B & CMD 23-H7.1B – Presentation from Cameco Corporation (PDF, 60 pages, 7.70 MB)
- CMD 23-H6.7A & CMD 23-H7.7A – Presentation from the Saskatchewan Mining Association (PDF, 18 pages, 1.41 MB)
- CMD 23-H6.10A & CMD 23-H7.10A – Presentation from Orano Canada Inc. (PDF, 6 pages, 547 KB)
- CMD 23-H6.17A & CMD 23-H7.17A – Presentation from the Kineepik Metis Local #9 (PDF, 10 pages, 5.34 MB)
- CMD 23-H6.18A & CMD 23-H7.18A – Presentation from Canada North Environmental Services (CanNorth) (PDF, 14 pages, 1.16 MB)
- CMD 23-H6.22A & CMD 23-H7.22A – Presentation from Rick Robillard (PDF, 9 pages, 1.76 MB)
- CMD 23-H6.26A & CMD 23-H7.26A – Presentation from Victor Fern Sr, Victor Fern Jr and Marty Fern (PDF, 14 pages, 3.43 MB)
- CMD 23-H6.28A & CMD 23-H7.28A – Presentation from Chelsea Iron, Darlene Gazandlare and Brenda McDonald (PDF, 6 pages, 472 KB)
- CMD 23-H6.29A & CMD 23-H7.29A – Presentation from the Birch Narrows Dene Nation (PDF, 8 pages, 2.82 MB)
- CMD 23-H6.30A & CMD 23-H7.30A – Presentation from the Ya’thi Néné Lands and Resources Office (PDF, 13 pages, 2.56 MB)
- CMD 23-H6.31A & CMD 23-H7.31A – Presentation from the Canadian Environmental Law Association (PDF, 33 pages, 15.3 MB)
- CMD 23-H6.32A & CMD 23-H7.32A – Presentation from the Métis Nation-Saskatchewan (PDF, 10 pages, 817 KB)
-
Published on May 2, 2023
- CMD 23-H6.29 – Submission from the Birch Narrows First Nation (PDF, 23 pages, 801 KB)
- CMD 23-H6.30 – Submission from the Ya’thi Néné Land and Resource Office (PDF, 13 pages, 463 KB)
- CMD 23-H6.31 – Submission from the Canadian Environmental Law Association (PDF, 65 pages, 1.18 MB)
- CMD 23-H6.32 – Submission from the Métis Nation-Saskatchewan (PDF, 22 pages, 369 KB)
- CMD 23-H6.36 – Submission from Karen Weingeist (PDF, 4 pages, 6.64 MB)
-
Published on April 27, 2023
- CMD 23-H6.2 – Submission from the Canada-India Business Council (PDF, 3 pages, 288 KB)
- CMD 23-H6.3 – Submission from the Greater Saskatoon Chamber of Commerce (PDF, 3 pages, 280 KB)
- CMD 23-H6.4 – Submission from the Northern Village of Beauval (PDF, 3 pages, 274 KB)
- CMD 23-H6.5 – Submission from the Northern Village of Ile-a-la-Crosse (PDF, 2 pages, 102 KB)
- CMD 23-H6.6 – Submission from the Saskatoon Regional Economic Development Authority (SREDA) (PDF, 2 pages, 374 KB)
- CMD 23-H6.7 – Submission from the Saskatchewan Mining Association (PDF, 3 pages, 306 KB)
- CMD 23-H6.8 – Submission from Ken Coates (PDF, 3 pages, 303 KB)
- CMD 23-H6.9 – Submission from Athabasca Basin Development (PDF, 3 pages, 618 KB)
- CMD 23-H6.10 – Submission from Orano Canada Inc. (PDF, 5 pages, 222 KB)
- CMD 23-H6.11 – Submission from the Saskatchewan Chamber of Commerce (PDF, 3 pages, 218 KB)
- CMD 23-H6.12 – Submission from the NSBA – Saskatoon’s Business Association (PDF, 2 pages, 337 KB)
- CMD 23-H6.13 – Submission from the Lac La Ronge Indian Band (PDF, 2 pages, 255 KB)
- CMD 23-H6.14 – Submission from the Kitsaki Management Limited Partnership (PDF, 3 pages, 251 KB)
- CMD 23-H6.15 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 312 KB)
- CMD 23-H6.16 – Submission from the Athabasca Joint Engagement and Environmental Subcommittee (AJES) (PDF, 4 pages, 1.46 MB)
- CMD 23-H6.17 – Submission from the Kineepik Metis Local #9 (PDF, 12 pages, 622 KB)
- CMD 23-H6.18 – Submission from Canada North Environmental Services (CanNorth) (PDF, 4 pages, 389 KB)
- CMD 23-H6.19 – Submission from PBN Construction (PDF, 2 pages, 343 KB)
- CMD 23-H6.20 – Submission from Candyce Paul (PDF, 4 pages, 145 KB)
- CMD 23-H6.21 – Submission from the English River First Nation (PDF, 6 pages, 259 KB)
- CMD 23-H6.22 – Submission from Rick Robillard (PDF, 3 pages, 143 KB)
- CMD 23-H6.23 – Submission from the Men of the North Inc. (PDF, 4 pages, 963 KB)
- CMD 23-H6.24 – Submission from the Nuclear Transparency Project (PDF, 6 pages, 218 KB)
- CMD 23-H6.25 – Submission from Harry Lariviere (PDF, 4 pages, 326 KB)
- CMD 23-H6.26 – Submission from Victor Fern Sr (PDF, 4 pages, 1.32 MB)
- CMD 23-H6.27 – Submission from Jennifer Parada (PDF, 3 pages, 117 KB)
- CMD 23-H6.28 – Submission from Chelsea Iron, Darlene Gazandlare and Brenda McDonald (PDF, 4 pages, 162 KB)
- CMD 23-H6.33 – Submission from Maria Santos (PDF, 4 pages, 226 KB)
- CMD 23-H6.34 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 520 KB)
- CMD 23-H6.35 – Submission from the Des Nedhe Group (PDF, 2 pages, 264 KB)
- Published on February 24, 2023
Application by Cameco Corporation for the renewal of the licence for Rabbit Lake Operation
June 7-8, 2023 public hearings
- Published on July 26, 2023
-
Published on May 26, 2023
- CMD 23-H7.B – Supplementary submission from CNSC Staff (PDF, 93 pages, 1.95 MB)
- CMD 23-H6.C & CMD 23-H7.C – Presentation from CNSC Staff (PDF, 39 pages, 1.57 MB)
- CMD 23-H6.1B & CMD 23-H7.1B – Presentation from Cameco Corporation (PDF, 60 pages, 7.70 MB)
- CMD 23-H6.7A & CMD 23-H7.7A – Presentation from the Saskatchewan Mining Association (PDF, 18 pages, 1.41 MB)
- CMD 23-H6.10A & CMD 23-H7.10A – Presentation from Orano Canada Inc. (PDF, 6 pages, 547 KB)
- CMD 23-H6.17A & CMD 23-H7.17A – Presentation from the Kineepik Metis Local #9 (PDF, 10 pages, 5.34 MB)
- CMD 23-H6.18A & CMD 23-H7.18A – Presentation from Canada North Environmental Services (CanNorth) (PDF, 14 pages, 1.16 MB)
- CMD 23-H6.22A & CMD 23-H7.22A – Presentation from Rick Robillard (PDF, 9 pages, 1.76 MB)
- CMD 23-H6.26A & CMD 23-H7.26A – Presentation from Victor Fern Sr, Victor Fern Jr and Marty Fern (PDF, 14 pages, 3.43 MB)
- CMD 23-H6.28A & CMD 23-H7.28A – Presentation from Chelsea Iron, Darlene Gazandlare and Brenda McDonald (PDF, 6 pages, 472 KB)
- CMD 23-H6.29A & CMD 23-H7.29A – Presentation from the Birch Narrows Dene Nation (PDF, 8 pages, 2.82 MB)
- CMD 23-H6.30A & CMD 23-H7.30A – Presentation from the Ya’thi Néné Lands and Resources Office (PDF, 13 pages, 2.56 MB)
- CMD 23-H6.31A & CMD 23-H7.31A – Presentation from the Canadian Environmental Law Association (PDF, 33 pages, 15.3 MB)
- CMD 23-H6.32A & CMD 23-H7.32A – Presentation from the Métis Nation-Saskatchewan (PDF, 10 pages, 817 KB)
-
Published on May 2, 2023
- CMD 23-H7.29 – Submission from the Birch Narrows (PDF, 18 pages, 818 KB)
- CMD 23-H7.30 – Submission from the Ya’thi Néné Land and Resource Office (PDF, 13 pages, 461 KB)
- CMD 23-H7.31 – Submission from the Canadian Environmental Law Association (PDF, 59 pages, 1.15 MB)
- CMD 23-H7.32 – Submission from the Métis Nation-Saskatchewan (PDF, 22 pages, 503 KB)
- CMD 23-H7.34 – Submission from Karen Weingeist (PDF, 4 pages, 6.64 MB)
-
Published on April 27, 2023
- CMD 23-H7.2 – Submission from the Canada-India Business Council (PDF, 3 pages, 287 KB)
- CMD 23-H7.3 – Submission from the Greater Saskatoon Chamber of Commerce (PDF, 3 pages, 279 KB)
- CMD 23-H7.4 – Submission from the Northern Village of Beauval (PDF, 3 pages, 273 KB)
- CMD 23-H7.5 – Submission from the Northern Village of Ile-a-la-Crosse (PDF, 2 pages, 100 KB)
- CMD 23-H7.6 – Submission from the Saskatoon Regional Economic Development Authority (SREDA) (PDF, 2 pages, 373 KB)
- CMD 23-H7.7 – Submission from the Saskatchewan Mining Association (PDF, 3 pages, 391 KB)
- CMD 23-H7.8 – Submission from Ken Coates (PDF, 3 pages, 302 KB)
- CMD 23-H7.9 – Submission from Athabasca Basin Development (PDF, 3 pages, 617 KB)
- CMD 23-H7.10 – Submission from Orano Canada Inc. (PDF, 5 pages, 219 KB)
- CMD 23-H7.11 – Submission from the Saskatchewan Chamber of Commerce (PDF, 3 pages, 216 KB)
- CMD 23-H7.12 – Submission from the NSBA – Saskatoon’s Business Association (PDF, 2 pages, 334 KB)
- CMD 23-H7.13 – Submission from the Lac La Ronge Indian Band (PDF, 2 pages, 254 KB)
- CMD 23-H7.14 – Submission from the Kitsaki Management Limited Partnership (PDF, 3 pages, 249 KB)
- CMD 23-H7.15 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 307 KB)
- CMD 23-H7.16 – Submission from the Athabasca Joint Engagement and Environmental Subcommittee (AJES) (PDF, 4 pages, 1.46 MB)
- CMD 23-H7.17 – Submission from the Kineepik Metis Local #9 (PDF, 12 pages, 621 KB)
- CMD 23-H7.18 – Submission from Canada North Environmental Services (CanNorth) (PDF, 4 pages, 387 KB)
- CMD 23-H7.19 – Submission from PBN Construction (PDF, 2 pages, 342 KB)
- CMD 23-H7.20 – Submission from Candyce Paul (PDF, 4 pages, 143 KB)
- CMD 23-H7.21 – Submission from the English River First Nation (PDF, 6 pages, 258 KB)
- CMD 23-H7.22 – Submission from Rick Robillard (PDF, 3 pages, 142 KB)
- CMD 23-H7.23 – Submission from the Men of the North Inc. (PDF, 4 pages, 961 KB)
- CMD 23-H7.24 – Submission from the Nuclear Transparency Project (PDF, 6 pages, 216 KB)
- CMD 23-H7.25 – Submission from Harry Lariviere (PDF, 4 pages, 324 KB)
- CMD 23-H7.26 – Submission from Victor Fern Sr (PDF, 4 pages, 1.32 MB)
- CMD 23-H7.27 – Submission from Jennifer Parada (PDF, 3 pages, 116 KB)
- CMD 23-H7.28 – Submission from Chelsea Iron, Darlene Gazandlare and Brenda McDonald (PDF, 4 pages, 161 KB)
- CMD 23-H7.33 – Submission from Maria Santos (PDF, 4 pages, 225 KB)
- Published on April 5, 2023
- Published on February 24, 2023
April 2023 hearing in writing – Royal Military College of Canada
Application by the Royal Military College of Canada to renew its non-power reactor operating licence for its SLOWPOKE-2 facility
April 2023 hearing in writing – Royal Military College of Canada
- Published on May 8, 2023
- Published on April 24, 2023
- Published on April 13, 2023
- Published on March 16, 2023
- Published on March 7, 2023
- Published on February 28, 2023
- Published on January 16, 2023
April 2023 hearing in writing – École Polytechnique de Montréal
Application by the École Polytechnique de Montréal to renew its non-power reactor operating licence for its SLOWPOKE-2 facility
April 2023 hearing in writing – École Polytechnique de Montréal
- Published on May 8, 2023
- Published on April 24, 2023
- Published on April 13, 2023
- Published on March 16, 2023
- Published on March 7, 2023
- Published on January 17, 2023
- Published on January 16, 2023
April 2023 hearing in writing – Bruce Power Inc. – Bruce A and B
Application to amend the power reactor operating licence for the Bruce Nuclear Generating Stations (NGS) A and B
April 2023 hearing in writing – Bruce Power Inc. – Bruce A and B
- Published on September 7, 2023
- Published on August 15, 2023
- Published on July 24, 2023
- Published on July 20, 2023
- Published on June 22, 2023
- Published on June 5, 2023
- Published on May 2, 2023
-
Published on April 25, 2023
- CMD 23-H103.2 – Submission from the Canadian Nuclear Laboratories (PDF, 3 pages, 581 KB)
- CMD 23-H103.3 – Submission from the Saugeen Ojibway Nation (PDF, 6 pages, 332 KB)
- CMD 23-H103.4 – Submission from Frank Greening (PDF, 33 pages, 1.2 MB)
- CMD 23-H103.5 – Submission from the Canadian Nuclear Association (PDF, 3 pages, 330 KB)
- CMD 23-H103.6 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 655 KB)
- CMD 23-H103.7 – Submission from Ontario Power Generation Inc. (PDF, 3 pages, 394 KB)
- CMD 23-H103.8 – Submission from CANDU Owners Group Inc. (PDF, 3 pages, 225 KB)
- CMD 23-H103.9 – Submission from Kinectrics Inc. (PDF, 5 pages, 343 KB)
- Published on March 16, 2023
March 2023 hearing in writing – Ontario Power Generation – Darlington
Application from Ontario Power Generation requesting acceptance of 3 proposed changes to the Darlington Nuclear Generating Station
March 2023 hearing in writing – Ontario Power Generation – Darlington
March 2023 hearing in writing – Cameco Corporation – Beaverlodge
Application to renew its waste facility operating licence for the decommissioned Beaverlodge mine and mill site
March 2023 hearing in writing – Cameco Corporation – Beaverlodge
-
Published on February 13, 2023
- CMD 23-H101.2 – Submission from the Saskatchewan Mining Association (PDF, 2 pages, 278 KB)
- CMD 23-H101.3 – Submission from Orano Canada Inc. (PDF, 4 pages, 213 KB)
- CMD 23-H101.4 – Submission from the Northern Saskatchewan Environmental Quality Committee (PDF, 2 pages, 221 KB)
- CMD 23-H101.5 – Submission from Victor Fern (PDF, 5 pages, 248 KB)
- CMD 23-H101.6 – Submission from the Athabasca Joint Engagement and Environmental Subcommittee (PDF, 4 pages, 205 KB)
- CMD 23-H101.7 – submission from the Canadian Nuclear Association (PDF, 3 pages, 322 KB)
- CMD 23-H101.8 – Submission from the Ya’thi Néné Lands and Resources Office (PDF, 13 pages, 467 KB)
- Published on December 19, 2022
- Published on December 7, 2022
-
Published on December 1, 2022
- CMD 23-H101 – Submission from CNSC staff on the application from Cameco Corporation to renew, for a period of 2 years, Â its waste facility operating licence for the decommissioned Beaverlodge mine and mill site (PDF, 122 pages, 2.02 MB)
- CMD 23-H101.1 – Submission from Cameco Corporation on the application to renew, for a period of 2 years, its waste facility operating licence for the decommissioned Beaverlodge mine and mill site (PDF, 3 pages, 180 KB)
March 1, 2023 Public Hearing
Application by Orano Canada Inc. to revoke the current licence and release the Cluff Lake Project to the Institutional Control Program
- Download all documents for the March 1, 2023 public hearing - Part 1 (ZIP, 63 MB)
- Download all documents for the March 1, 2023 public hearing - Part 2 (ZIP, 19 MB)
March 1, 2023 public hearing
-
Published on February 23, 2023
- CMD 23-H8.A – Presentation from CNSC staff (PDF, 32 pages, 962 KB)
- CMD 23-H8.1A – Supplementary submission from Orano Canada Inc. (PDF, 48 pages, 8.59 MB)
- CMD 23-H8.1B – Presentation from Orano Canada Inc. (PDF, 24 pages, 3.28 MB)
- CMD 23-H8.8A – Presentation from the Birch Narrows Dene Nation (PDF, 8 pages, 1.74 MB)
- CMD 23-H8.9A – Presentation from the Clearwater River Dene Nation (PDF, 7 pages, 449 KB)
- CMD 23-H8.11A – Presentation from the Métis Nation-Saskatchewan (PDF, 19 pages, 5.27 MB)
- CMD 23-H8.13A – Presentation from the Ya’thi Nene Land and Resource Office (PDF, 13 pages, 4.56 MB)
- Published on February 2, 2023
- Published on January 27, 2023
-
Published on January 24, 2023
- CMD 23-H8.2 – Submission from the Saskatchewan Mining Association (PDF, 4 pages, 247 KB)
- CMD 23-H8.3 – Submission from Cameco Corporation (PDF, 3 pages, 142 KB)
- CMD 23-H8.4 – Submission from the Canadian Nuclear Association (PDF, 3 pages, 344 KB)
- CMD 23-H8.5 – Submission from Denison Mines Corp. (PDF, 2 pages, 652 KB)
- CMD 23-H8.6 – Submission from the Saskatchewan Ministry of Energy and Resources (PDF, 21 pages, 3.53 MB)
- CMD 23-H8.7 – Submission from the Saskatchewan Environmental Society (PDF, 72 pages, 1.57 MB)
- CMD 23-H8.8 – Submission from the Birch Narrows Dene Nation (PDF, 26 pages, 1.31 MB)
- CMD 23-H8.9 – Submission from the Clearwater River Dene Nation (PDF, 302 pages, 70.56 MB)
- CMD 23-H8.10 – Submission from the Athabasca Chipewyan First Nation (PDF, 63 pages, 1.68 MB)
- CMD 23-H8.10A – Presentation from the Athabasca Chipewyan First Nation (PDF, 14 pages, 1.58 MB)
- CMD 23-H8.11 – Submission from the Métis Nation-Saskatchewan (PDF, 77 pages, 20.96 MB)
- Published on November 18, 2022
January 26, 2023 Public Hearing
Application from Ontario Power Generation for the renewal of the licence for the Darlington Waste Management Facility
January 26, 2023 public hearing
-
Published on January 19, 2023
- CMD 23-H9.1A – Presentation from Ontario Power Generation (PDF, 18 pages, 4.49 MB)
- CMD 23-H9.A – Supplementary submission from CNSC Staff (PDF, 15 pages, 278 KB)
- CMD 23-H9.B – Presentation from CNSC Staff (PDF, 42 pages, 1.35 MB)
- CMD 23-H9.18A – Presentation from the Mississaugas of Scugog Island First Nation (PDF, 9 pages, 645 KB)
- CMD 23-H9.19A – Presentation from the Curve Lake First Nation (PDF, 10 pages, 1.74 MB)
- CMD 23-H9.24A – Presentation from Northwatch (PDF, 22 pages, 821 KB)
- CMD 23-H9.25A – Supplementary submission from the Nuclear Transparency Project (PDF, 22 pages, 361 KB)
- CMD 23-H9.25B – Presentation from the Nuclear Transparency Project (PDF, 10 pages, 261 KB)
-
Published on December 7, 2022
- CMD 23-H9.2 – Submission from the Ontario Clean Air Alliance (PDF, 3 pages, 1.72 MB)
- CMD 23-H9.3 – Submission from the North American Young Generation in Nuclear (NAYGN) Durham (PDF, 4 pages, 422 KB)
- CMD 23-H9.4 – Submission from Kinectrics Inc. (PDF, 4 pages, 295 KB)
- CMD 23-H9.5 – Submission from Dave Taylor (PDF, 2 pages, 598 KB)
- CMD 23-H9.6 – Submission from George Bartlett (PDF, 2 pages, 505 KB)
- CMD 23-H9.7 – Submission from Jo Hayward-Haines (PDF, 2 pages, 495 KB)
- CMD 23-H9.8 – Submission from Sarah Gabrielle Baron (PDF, 6 pages, 139 KB)
- CMD 23-H9.9 – Submission from Kate Chung (PDF, 2 pages, 788 KB)
- CMD 23-H9.10 – Submission from Douglas Buck (PDF, 2 pages, 505 KB)
- CMD 23-H9.11 – Submission from the Concerned Citizens of Renfrew County and Area (PDF, 2 pages, 110 KB)
- CMD 23-H9.12 – Submission from Denise Giroux (PDF, 2 pages, 518 KB)
- CMD 23-H9.13 – Submission from Phillip Penna (PDF, 2 pages, 688 KB)
- CMD 23-H9.14 – Submission from Georgina Bartos (PDF, 2 pages, 503 KB)
- CMD 23-H9.15 – Submission from Rural Action and Voices for the ENvironment (RAVEN) (PDF, 2 pages, 269 KB)
- CMD 23-H9.16 – Submission from Judith Fox Lee (PDF, 5 pages, 246 KB)
- CMD 23-H9.17 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 788 KB)
- CMD 23-H9.18 – Submission from the Mississaugas of Scugog Island First Nation (PDF, 16 pages, 474 KB)
- CMD 23-H9.19 – Submission from the Curve Lake First Nation (PDF, 47 pages, 1.48 MB)
- CMD 23-H9.20 – Submission from Ruth MacLean (PDF, 2 pages, 495 KB)
- CMD 23-H9.21 – Submission from the Regional Municipality of Durham (PDF, 4 pages, 250 KB)
- CMD 23-H9.22 – Submission from Ingrid Barron (PDF, 2 pages, 493 KB)
- CMD 23-H9.23 – Submission from the Canadian Nuclear Workers’Â Council (PDF, 3 pages, 594 KB)
- CMD 23-H9.24 – Submission from Northwatch (PDF, 85 pages, 3.91 MB)
- CMD 23-H9.25 – Submission from the Nuclear Transparency Project (PDF, 11 pages, 203 KB)
- CMD 23-H9.26 – Submission from Kelly Clune (PDF, 3 pages, 676 KB)
- CMD 23-H9.27 – Submission from We the Nuclear Free North (PDF, 2 pages, 184 KB)
- CMD 23-H9.28 – Submission from Christine Drimmie (PDF, 3 pages, 962 KB)
- CMD 23-H9.29 – Submission from Brad Blaney (PDF, 2 pages, 503 KB)
- CMD 23-H9.30 – Submission from Evelyn Gigantes (PDF, 6 pages, 289 KB)
- CMD 23-H9.31 – Submission from the Greater Oshawa Chamber of Commerce (PDF, 2 pages, 337 KB)
-
Published on October 28, 2022
- CMD 23-H9 – Submission from CNSC staff on the Application to Renew the Class IB Waste Facility Operating licence for Ontario Power Generation in Darlington, Ontario (PDF, 210 pages, 2.95 MB)
- CMD 23-H9.1 – Submission from Ontario Power Generation Inc. on the Application to Renew the Class IB Waste Facility Operating licence for Ontario Power Generation in Darlington, Ontario (PDF, 122 pages, 5.35 MB)
December 2022 hearing in writing – Nordion (Canada) Inc. – Financial Guarantee
Revised preliminary decommissioning plan and financial guarantee proposed by Nordion (Canada) Inc.
December 2022 hearing in writing – Nordion (Canada) Inc. – Financial Guarantee
- Published on January 18, 2023
- Published on January 13, 2023
-
Published on October 26, 2022
- CMD 22-H106 – Submission from CNSC staff on the revised preliminary decommissioning plan and financial guarantee proposed by Nordion (Canada) Inc. (PDF, 25 pages, 1.5 MB)
- CMD 22-H106.1 – Submission from Nordion (Canada) Inc. on the revised preliminary decommissioning plan and financial guarantee (PDF, 4 pages, 173 KB)
November 2022 hearing in writing – Ontario Power Generation Inc. – Pickering NGS
Request to extend filing deadline for documents related to the end of commercial operation for the Pickering Nuclear Generating Station
November 2022 hearing in writing – Ontario Power Generation Inc. – Pickering NGS
- Published on November 4, 2022
- Published on November 3, 2022
November 2022 hearing in writing – Ontario Power Generation – Consolidated Financial Guarantee
Request for the revised consolidated financial guarantee proposed by Ontario Power Generation for its nuclear facilities
-
Download a particular PDF document for the November 2022 hearing in writing
November 2022 hearing in writing – Ontario Power Generation – Consolidated Financial Guarantee
- Published on September 21, 2022
-
Published on August 16, 2022
- CMD 22-H104 – Submission from CNSC staff on the request for the revised consolidated financial guarantee proposed by Ontario Power Generation for its nuclear facilities (PDF, 29 pages, 784 KB)
- CMD 22-H104.1 – Submission from Ontario Power Generation on the request for the revised consolidated financial guarantee for its nuclear facilities (PDF, 29 pages, 699 KB)
November 23, 2022 Public Hearing
Application by Cameco Fuel Manufacturing for the renewal of the Class IB Nuclear Fuel Facility Licence for the installation in Port Hope, Ontario
November 23, 2022 public hearing
-
Published on October 12, 2022
- CMD 22-H12.2 – Submission from the Northumberland Manufacturers’ Association (PDF, 3 pages, 257 KB)
- CMD 22-H12.3 – Submission from the Rebound Child & Youth Services Northumberland (PDF, 2 pages, 128 KB)
- CMD 22-H12.4 – Submission from the Canadian Nuclear Isotope Council (PDF, 3 pages, 211 KB)
- CMD 22-H12.5 – Submission from the Northumberland Hills Hospital Foundation (PDF, 3 pages, 183 KB)
- CMD 22-H12.6 – Submission from the Nuclear Innovation Institute (PDF, 3 pages, 181 KB)
- CMD 22-H12.7 – Submission from Christa Ingalls (PDF, 2 pages, 497 KB)
- CMD 22-H12.8 – Submission from the Canadian Association of Nuclear Host Communities (PDF, 2 pages, 155 KB)
- CMD 22-H12.9 – Submission from the Municipality of Port Hope (PDF, 2 pages, 747 KB)
- CMD 22-H12.10 – Submission from the Energy and Nuclear Engineering Department, Ontario Tech University (PDF, 3 pages, 203 KB)
- CMD 22-H12.11 – Submission from the YMCA Northumberland (PDF, 2 pages, 174 KB)
- CMD 22-H12.12 – Submission from the Town of Cobourg (PDF, 2 pages, 213 KB)
- CMD 22-H12.13 – Submission from United Way Northumberland (PDF, 2 pages, 446 KB)
- CMD 22-H12.14 – Submission from Philip Lawrence, Member of Parliament, Northumberland-Peterborough South (PDF, 2 pages, 185 KB)
- CMD 22-H12.15 – Submission from Habitat for Humanity Northumberland (PDF, 3 pages, 254 KB)
- CMD 22-H12.16 – Submission from the Green Wood Coalition (PDF, 4 pages, 257 KB)
- CMD 22-H12.17 – Submission from NB Power (PDF, 3 pages, 275 KB)
- CMD 22-H12.18 – Submission from Bruce Power (PDF, 3 pages, 222 KB)
- CMD 22-H12.19 – Submission from Catherine Jarvis (PDF, 2 pages, 516 KB)
- CMD 22-H12.20 – Submission from Brian Riess (PDF, 2 pages, 291 KB)
- CMD 22-H12.21 – Submission from Vincent Larose (PDF, 2 pages, 297 KB)
- CMD 22-H12.22 – Submission from David Piccini, Member of Provincial Parliament, Northumberland-Peterborough South (PDF, 3 pages, 611 KB)
- CMD 22-H12.23 – Submission from United Steelworkers, Local 14193 (PDF, 3 pages, 183 KB)
- CMD 22-H12.24 – Submission from Victor Allan Glover (PDF, 3 pages, 181 KB)
- CMD 22-H12.25 – Submission from Colleen Polley (PDF, 2 pages, 169 KB)
- CMD 22-H12.26 – Submission from Donald Slade (PDF, 2 pages, 374 KB)
- CMD 22-H12.27 – Submission from John Studzinski (PDF, 3 pages, 177 KB)
- CMD 22-H12.28 – Submission from the Port Hope Police Service (PDF, 2 pages, 119 KB)
- CMD 22-H12.29 – Submission from the Canadian Nuclear Association (PDF, 5 pages, 1.71 MB)
- CMD 22-H12.30 – Submission from Women in Nuclear (WiN) Canada (PDF, 3 pages, 256 KB)
- CMD 22-H12.31 – Submission from Crystal Roddy (PDF, 2 pages, 140 KB)
- CMD 22-H12.32 – Submission from the Power Workers' Union (PDF, 3 pages, 310 KB)
- CMD 22-H12.33 – Submission from the North American Young Generation in Nuclear (NAYGN) Durham (PDF, 3 pages, 268 KB)
- CMD 22-H12.34 – Submission from Andrew Chatwood (PDF, 2 pages, 138 KB)
- CMD 22-H12.35 – Submission from the Fire and Emergency Services, Municipality of Port Hope (PDF, 2 pages, 243 KB)
- CMD 22-H12.36 – Submission from the Canadian Nuclear Laboratories (PDF, 3 pages, 697 KB)
- CMD 22-H12.37 – Submission from Robert Neville (PDF, 2 pages, 133 KB)
- CMD 22-H12.38 – Submission from the Port Hope and District Chamber of Commerce (PDF, 2 pages, 195 KB)
- CMD 22-H12.39 – Submission from the Canadian Nuclear Workers’ Council (PDF, 5 pages, 661 KB)
- CMD 22-H12.40 – Submission from the Curve Lake First Nation (PDF, 67 pages, 1.86 MB)
- CMD 22-H12.41 – Submission from the Port Hope Community Health Concerns Committee (PDF, 43 pages, 1.35 MB)
- CMD 22-H12.42 – Submission from Northwatch (PDF, 9 pages, 401 KB)
- CMD 22-H12.43 – Submission from the Mississaugas of Scugog Island First Nation (PDF, 8 pages, 391 KB)
-
Published on August 10, 2022
- CMD 22-H12 – Submission from CNSC Staff on the application to renew the Class IB Nuclear Fuel Facility Licence for the installation in Port Hope, Ontario (PDF, 223 pages, 3.59 MB)
- CMD 22-H12.1 – Submission from Cameco Manufacturing on the application to renew the Class IB Nuclear Fuel Facility Licence (PDF, 66 pages, 1.88 MB)
November 22, 2022 Public Hearing
Application by the Canadian Nuclear Laboratories for the renewal of its waste nuclear substance licence for the Port Hope Project
November 22, 2022 public hearing
- Published on October 21, 2022
- Published on October 20, 2022
-
Published on October 18, 2022
- CMD 22-H13.2 – Submission from Sandra Holmes (PDF, 4 pages, 144 KB)
- CMD 22-H13.3 – Submission from Anna Tilman (PDF, 18 pages, 435 KB)
- CMD 22-H13.4 – Submission from the Port Hope High School (PDF, 2 pages, 173 KB)
- CMD 22-H13.5 – Submission from the Regional Municipality of Durham (PDF, 2 pages, 236 KB)
- CMD 22-H13.6 – Submission from Heather Kenny (PDF, 2 pages, 197 KB)
- CMD 22-H13.7 – Submission from the Rotary Club of Port Hope (PDF, 2 pages, 599 KB)
- CMD 22-H13.8 – Submission from the Durham Region Association of REALTORS® (PDF, 2 pages, 232 KB)
- CMD 22-H13.9 – Submission from the Fleming College, Environmental Technician/Technology Program (PDF, 5 pages, 459 KB)
- CMD 22-H13.10 – Submission from the Port Hope and District Chamber of Commerce (PDF, 2 pages, 196 KB)
- CMD 22-H13.11 – Submission from the Municipality of Clarington (PDF, 4 pages, 1.19 MB)
- CMD 22-H13.12 – Submission from the Northumberland Hills Association of REALTORS® (PDF, 2 pages, 181 KB)
- CMD 22-H13.13 – Submission from Henry Kowalski and Michael Stone (PDF, 2 pages, 139 KB)
- CMD 22-H13.14 – Submission from John Sypher (PDF, 4 pages, 156 KB)
- CMD 22-H13.15 – Submission from Kinectrics lnc. (PDF, 4 pages, 576 KB)
- CMD 22-H13.16 – Submission from the Municipality of Port Hope (PDF, 9 pages, 354 KB)
- CMD 22-H13.17 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 373 KB)
- CMD 22-H13.18 – Submission from David Piccini, Member of Provincial Parliament, Northumberland-Peterborough South (PDF, 2 pages, 382 KB)
- CMD 22-H13.19 – Submission from Cameco Corporation (PDF, 3 pages, 270 KB)
- CMD 22-H13.20 – Submission from Women in Nuclear (WiN) Canada (PDF, 3 pages, 253 KB)
- CMD 22-H13.21 – Submission from Donna Snowden (PDF, 2 pages, 159 KB)
- CMD 22-H13.22 – Submission from Atomic Energy of Canada Limited (PDF, 3 pages, 293 KB)
- CMD 22-H13.23 – Submission from Brian M. Ikeda (PDF, 3 pages, 121 KB)
- CMD 22-H13.24 – Submission from Robin Dines (PDF, 2 pages, 166 KB)
- CMD 22-H13.25 – Submission from Adrian Szamreta (PDF, 2 pages, 108 KB)
- CMD 22-H13.26 – Submission from the Mississaugas of Scugog Island First Nation (PDF, 9 pages, 246 KB)
- CMD 22-H13.27 – Submission from the Port Hope Community Health Concerns Committee (PDF, 41 pages, 12.3 MB)
-
Published on August 16, 2022
- CMD 22-H13 – Submission from CNSC staff on the application from the Canadian Nuclear Laboratories to renew its waste nuclear substance licence for the Port Hope Project (PDF, 310 pages, 8.42 MB)
- CMD 22-H13.1 – Submission from the Canadian Nuclear Laboratories on the application to renew its waste nuclear substance licence for the Port Hope Project (PDF, 186 pages, 7.71 MB)
June 2022 hearing in writing – Cameco Corporation – Cigar Lake - Financial Guarantee
Financial guarantee for Cameco Corporation’s Cigar Lake Operation
June 2022 hearing in writing – Cameco Corporation – Cigar Lake - Financial Guarantee
- Published on June 1, 2022
- Published on May 20, 2022
May 30 to June 3, 2022 Public Hearing
Application from the Canadian Nuclear Laboratories to amend its Chalk River Laboratories site licence to authorize the construction of a near surface disposal facility
- Download all documents for the May 30 to June 3, 2022 public hearing - Part 1 (ZIP, 67 MB)
- Download all documents for the May 30 to June 3, 2022 public hearing - Part 2 (ZIP, 55 MB)
- Download all documents for the May 30 to June 3, 2022 public hearing - Part 3 (ZIP, 67 MB)
- Download all documents for the May 30 to June 3, 2022 public hearing - Part 4 (ZIP, 62 MB)
- Download all documents for the May 30 to June 3, 2022 public hearing - Part 5 (ZIP, 12 MB)
May 30 to June 3, 2022 public hearing
- Published on May 25, 2022
-
Published on May 20, 2022
- CMD 22-H7.C – Presentation from CNSC staff (PDF, 45 pages, 904 KB)
- CMD 22-H7.109A – Supplementary submission from the Algonquins of Pikwàkanagàn First Nation (PDF, 20 pages, 2.17 MB)
- CMD 22-H7.109B – Presentation from the Algonquins of Pikwàkanagàn First Nation (PDF, 26 pages, 2.25 MB)
- CMD 22-H7.B – Supplementary submission from CNSC staff (PDF, 58 pages, 638 KB)
- Published on May 19, 2022
-
Published on May 18, 2022
- CMD 22-H7.60A – Presentation from Kerry Rowe (PDF, 42 pages, 2.7 MB)
- CMD 22-H7.104A – Presentation from the Canadian Environmental Law Association (PDF, 26 pages, 1.62 MB)
- CMD 22-H7.63A – Presentation from James R. Walker (PDF, 15 pages, 758 KB)
- CMD 22-H7.64A – Presentation from William Turner (PDF, 19 pages, 862 KB)
- CMD 22-H7.21A – Presentation from Erwin Dreessen (PDF, 8 pages, 318 KB)
- CMD 22-H7.62A – Presentation from Ken Chaplin (PDF, 26 pages, 907 KB)
- CMD 22-H7.36A – Presentation from the Old Fort William Cottagers’ Association (PDF, 8 pages, 2.21 MB)
- CMD 22-H7.46A – Presentation from Martin Flood (PDF, 20 pages, 181 KB)
- CMD 22-H7.19A – Presentation from Evelyn Gigantes (PDF, 2 pages, 181 KB)
- CMD 22-H7.55A – Presentation from Kinectrics Inc. (PDF, 11 pages, 1.03 MB)
- CMD 22-H7.103A – Presentation from Nuclear Waste Watch (PDF, 8 pages, 310 KB)
- CMD 22-H7.102A – Presentation from the Radiation Safety Institute of Canada (PDF, 16 pages, 788 KB)
- CMD 22-H7.122A – Presentation from the MRC Pontiac (PDF, 8 pages, 3.01 MB)
- CMD 22-H7.141A – Revised submission from the Provincial Council of Women of Ontario (PDF, 5 pages, 243 KB)
- CMD 22-H7.80A – Presentation from Gabrielle Psotka (PDF, 12 pages, 689 KB)
- CMD 22-H7.89A – Presentation from Gursimer Sandhu (PDF, 10 pages, 2.9 MB)
- CMD 22-H7.99A – Presentation from Atomic Energy of Canada Limited (PDF, 8 pages, 993 KB)
- CMD 22-H7.94A – Presentation from the Canadian Nuclear Workers’ Council (PDF, 15 pages, 572 KB)
- CMD 22-H7.74A – Presentation from the Concerned Citizens of Renfrew County and Area (PDF, 36 pages, 2.06 MB)
- CMD 22-H7.117A – Presentation from the Ottawa Chapter of the Council of Canadians (PDF, 15 pages, 331 KB)
- CMD 22-H7.132A – Presentation from Gillian Walker (PDF, 11 pages, 178 KB)
- CMD 22-H7.41A – Presentation from the Sierra Club Canada Foundation (PDF, 14 pages, 1.89 MB)
- CMD 22-H7.136A – Presentation from Lynn Jones (PDF, 18 pages, 702 KB)
- CMD 22-H7.119A – Presentation from Duncan Noble (PDF, 11 pages, 399 KB)
- CMD 22-H7.125A – Presentation from Ottawa Riverkeeper (PDF, 8 pages, 674 KB)
- CMD 22-H7.16A – Presentation from the City of Ottawa (PDF, 17 pages, 473 KB)
- CMD 22-H7.147A – Presentation from Christian Renault (PDF, 12 pages, 1017 KB)
- CMD 22-H7.106A – Presentation from Michael B. Benson (PDF, 29 pages, 1.7 MB)
-
Published on May 5, 2022
- CMD 22-H7.153 – Submission from Gregory Csullog (PDF, 69 pages, 1.1 MB)
- CMD 22-H7.120A – Supplementary submission from the Wolf Lake First Nation (PDF, 16 pages, 443 KB)
- CMD 22-H7.139A – Supplementary submission from the Mitchikanibikok Inik, Algonquins of Barriere Lake (PDF, 21 pages, 516 KB)
- CMD 22-H7.130A – Supplementary submission from the Communauté métropolitaine de Montréal (PDF, 5 pages, 191 KB)
- Published on April 29, 2022
-
Published on April 25, 2022
- CMD 22-H7.1C – Supplementary submission from CNL (PDF, 935 pages, 16.34 MB)
- CMD 22-H7.95A – Supplementary submission from Action Environnement Basses-Laurentides (PDF, 4 pages, 194 KB)
- CMD 22-H7.103 – Submission from Nuclear Waste Watch (PDF, 29 pages, 1.14 MB)
- CMD 22-H7.104 – Submission from the Canadian Environmental Law Association (PDF, 64 pages, 3.56 MB)
- CMD 22-H7.166 – Submission from Cheryl Gallant, MP, Renfrew-Nipissing-Pembroke (PDF, 3 pages, 270 KB)
- CMD 22-H7.167 – Submission from Isabelle Sawyer (PDF, 9 pages, 447 KB)
-
Published on April 19, 2022
- CMD 22-H7.1B – Supplementary submission from CNL (PDF, 25 pages, 900 KB)
- CMD 22-H7.3 – Submission from Woo-Jae Cheong (PDF, 2 pages, 143 KB)
- CMD 22-H7.4 – Submission from Colin Robb (PDF, 2 pages, 76 KB)
- CMD 22-H7.5 – Submission from the Canadian Nuclear Society (PDF, 5 pages, 171 KB)
- CMD 22-H7.6 – Submission from Donna Snowden (PDF, 2 pages, 591 KB)
- CMD 22-H7.7 – Submission from Diana Gillam (PDF, 2 pages, 528 KB)
- CMD 22-H7.8 – Submission from the Municipalité de l’Île-du-Grand-Calumet (PDF, 2 pages, 135 KB)
- CMD 22-H7.9 – Submission from the North American Young Generation in Nuclear (PDF, 8 pages, 453 KB)
- CMD 22-H7.10 – Submission from the Organization of Canadian Nuclear Industries (PDF, 3 pages, 182 KB)
- CMD 22-H7.11 – Submission from William J. Holtslander (PDF, 2 pages, 175 KB)
- CMD 22-H7.12 – Submission from Bob French (PDF, 2 pages, 404 KB)
- CMD 22-H7.13 – Submission from Brian Colby (PDF, 2 pages, 354 KB)
- CMD 22-H7.14 – Submission from John and Diane Almstedt (PDF, 2 pages, 349 KB)
- CMD 22-H7.15 – Submission from the Sylvia Fedoruk Canadian Centre for Nuclear Innovation Inc. (PDF, 2 pages, 257 KB)
- CMD 22-H7.16 – Submission from the City of Ottawa (PDF, 6 pages, 309 KB)
- CMD 22-H7.17 – Submission from Benjamin Rouben (PDF, 2 pages, 165 KB)
- CMD 22-H7.18 – Submission from Victor Golovko (PDF, 18 pages, 123 KB)
- CMD 22-H7.19 – Submission from Evelyn Gigantes (PDF, 20 pages, 1.15 MB)
- CMD 22-H7.20 – Submission from Margit Dehnicke-Templeton (PDF, 2 pages, 121 KB)
- CMD 22-H7.21 – Submission from Erwin Dreessen (PDF, 3 pages, 119 KB)
- CMD 22-H7.22 – Submission from the Training and Development Team at CNL (PDF, 2 pages, 498 KB)
- CMD 22-H7.23 – Submission from Morgan Brown (PDF, 2 pages, 169 KB)
- CMD 22-H7.24 – Submission from the Nuclear Innovation Institute (PDF, 2 pages, 154 KB)
- CMD 22-H7.25 – Submission from Tetra Tech Canada Inc. and ES-Fox Limited (PDF, 3 pages, 195 KB)
- CMD 22-H7.26 – Submission from Mohammad Madani (PDF, 2 pages, 141 KB)
- CMD 22-H7.27 – Submission from Lawrence Johnson (PDF, 2 pages, 177 KB)
- CMD 22-H7.28 – Submission from Alan Soucie (PDF, 2 pages, 327 KB)
- CMD 22-H7.29 – Submission from Brendon Walsh (PDF, 2 pages, 276 KB)
- CMD 22-H7.30 – Submission from AECOM Canada Ltd (PDF, 3 pages, 143 KB)
- CMD 22-H7.31 – Submission from Christina and Robbie Anderman (PDF, 4 pages, 506 KB)
- CMD 22-H7.32 – Submission from David Caron (PDF, 2 pages, 708 KB)
- CMD 22-H7.33 – Submission from Ish Theilheimer (PDF, 2 pages, 157 KB)
- CMD 22-H7.34 – Submission from Nathan Benkhe (PDF, 2 pages, 442 KB)
- CMD 22-H7.35 – Submission from the Council of the Town of Laurentian Hills (PDF, 3 pages, 122 KB)
- CMD 22-H7.36 – Submission from the Old Fort William Cottagers’ Association (PDF, 73 pages, 6.97 MB)
- CMD 22-H7.37 – Submission from Dylan Verburg (PDF, 2 pages, 169 KB)
- CMD 22-H7.38 – Submission from Renate Manthei (PDF, 2 pages, 507 KB)
- CMD 22-H7.39 – Submission from the Corporation of the Town of Deep River (PDF, 5 pages, 198 KB)
- CMD 22-H7.40 – Submission from the City of Pembroke (PDF, 3 pages, 740 KB)
- CMD 22-H7.41 – Submission from the Sierra Club Canada Foundation (PDF, 12 pages, 574 KB)
- CMD 22-H7.42 – Submission from the Municipality of Bristol (PDF, 2 pages, 151 KB)
- CMD 22-H7.43 – Submission from Jane Higgison (PDF, 2 pages, 353 KB)
- CMD 22-H7.44 – Submission from Mark McLoughlin, Deputy Minister, Saskatchewan Ministry of Environment (PDF, 3 pages, 194 KB)
- CMD 22-H7.45 – Submission from the Kitchissippi–Ottawa Valley Chapter, Council of Canadians (PDF, 7 pages, 332 KB)
- CMD 22-H7.46 – Submission from Martin Flood (PDF, 10 pages, 237 KB)
- CMD 22-H7.47 – Submission from BWXT Canada Ltd. (PDF, 3 pages, 271 KB)
- CMD 22-H7.48 – Submission from the Decommissioning and Environmental Remediation Program Integration at CNL (PDF, 4 pages, 1.12 MB)
- CMD 22-H7.49 – Submission from David V. Thompson (PDF, 3 pages, 176 KB)
- CMD 22-H7.50 – Submission from the Ottawa Raging Grannies (PDF, 2 pages, 123 KB)
- CMD 22-H7.51 – Submission from Stephanie Clement (PDF, 2 pages, 143 KB)
- CMD 22-H7.52 – Submission from Philip Kompass (PDF, 4 pages, 153 KB)
- CMD 22-H7.53 – Submission from Ontario Power Generation (PDF, 3 pages, 238 KB)
- CMD 22-H7.54 – Submission from the Port Hope and District Chamber of Commerce (PDF, 2 pages, 199 KB)
- CMD 22-H7.55 – Submission from Kinectrics Inc. (PDF, 4 pages, 336 KB)
- CMD 22-H7.56 – Submission from Moltex Energy (PDF, 3 pages, 195 KB)
- CMD 22-H7.57 – Submission from Women in Nuclear Canada (PDF, 3 pages, 276 KB)
- CMD 22-H7.58 – Submission from Chris Cavan (PDF, 7 pages, 264 KB)
- CMD 22-H7.59 – Submission from TRIUMF, Inc. (PDF, 2 pages, 294 KB)
- CMD 22-H7.60 – Submission from Kerry Rowe (PDF, 27 pages, 1.08 MB)
- CMD 22-H7.61 – Submission from Ian Clark (PDF, 3 pages, 453 KB)
- CMD 22-H7.62 – Submission from Ken Chaplin (PDF, 4 pages, 158 KB)
- CMD 22-H7.63 – Submission from James R. Walker (PDF, 20 pages, 418 KB)
- CMD 22-H7.64 – Submission from William Turner (PDF, 41 pages, 1.43 MB)
- CMD 22-H7.65 – Submission from the Society of United Professionals (PDF, 4 pages, 589 KB)
- CMD 22-H7.66 – Submission from Jacques Plourde (PDF, 3 pages, 594 KB)
- CMD 22-H7.67 – Submission from NB Power (PDF, 4 pages, 227 KB)
- CMD 22-H7.68 – Submission from Anita Sawyer, William Sawyer and Maureen Maloney (PDF, 2 pages, 649 KB)
- CMD 22-H7.69 – Submission from the Pontiac Environment Protection (PDF, 11 pages, 301 KB)
- CMD 22-H7.70 – Submission from Zackary Krowchuk (PDF, 3 pages, 309 KB)
- CMD 22-H7.71 – Submission from Cathy Vakil (PDF, 3 pages, 168 KB)
- CMD 22-H7.72 – Submission from David McNicoll (PDF, 4 pages, 139 KB)
- CMD 22-H7.73 – Submission from Luc Bégin (PDF, 3 pages, 636 KB)
- CMD 22-H7.74 – Submission from the Concerned Citizens of Renfrew County and Area (PDF, 23 pages, 949 KB)
- CMD 22-H7.75 – Submission from Prevent Cancer Now (PDF, 2 pages, 701 KB)
- CMD 22-H7.76 – Submission from Shaughn McArthur (PDF, 7 pages, 250 KB)
- CMD 22-H7.77 – Submission from Sohan Chouhan (PDF, 3 pages, 286 KB)
- CMD 22-H7.78 – Submission from Tracy Sanderson (PDF, 2 pages, 286 KB)
- CMD 22-H7.79 – Submission from Ipsos Custodes (PDF, 4 pages, 306 KB)
- CMD 22-H7.80 – Submission from Gabrielle Psotka (PDF, 2 pages, 466 KB)
- CMD 22-H7.81 – Submission from the Nuclear Waste Management Organization (PDF, 3 pages, 364 KB)
- CMD 22-H7.82 – Submission from the Fuel Program and Projects Division at CNL (PDF, 5 pages, 1.44 MB)
- CMD 22-H7.83 – Submission from Kathy Eisner (PDF, 2 pages, 162 KB)
- CMD 22-H7.84 – Submission from Georgina Bartos (PDF, 3 pages, 110 KB)
- CMD 22-H7.85 – Submission from Aecon (PDF, 3 pages, 808 KB)
- CMD 22-H7.86 – Submission from the Municipality of Port Hope (PDF, 4 pages, 234 KB)
- CMD 22-H7.87 – Submission from Westinghouse Electric Canada Inc. (PDF, 3 pages, 242 KB)
- CMD 22-H7.88 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 944 KB)
- CMD 22-H7.89 – Submission from Gursimer Sandhu (PDF, 2 pages, 470 KB)
- CMD 22-H7.90 – Submission from Philip Sweetnam (PDF, 4 pages, 236 KB)
- CMD 22-H7.91 – Submission from the Facilities Decommissioning and Environmental Remediation at CNL (PDF, 3 pages, 1.03 MB)
- CMD 22-H7.92 – Submission from M. Sullivan & Son Ltd. (PDF, 2 pages, 524 KB)
- CMD 22-H7.93 – Submission from Cameco Corporation (PDF, 2 pages, 253 KB)
- CMD 22-H7.94 – Submission from the Canadian Nuclear Workers’ Council (PDF, 17 pages, 1.23 MB)
- CMD 22-H7.95 – Submission from Action Environnement Basses-Laurentides (PDF, 22 pages, 9.26 MB)
- CMD 22-H7.96 – Submission from the CANDU Owners Group Inc. (PDF, 4 pages, 214 KB)
- CMD 22-H7.97 – Submission from Bailey Waite (PDF, 2 pages, 119 KB)
- CMD 22-H7.98 – Submission from the Algonquins of Ontario (PDF, 18 pages, 356 KB)
- CMD 22-H7.99 – Submission from Atomic Energy of Canada Limited (PDF, 3 pages, 266 KB)
- CMD 22-H7.100 – Submission from John Yakabuski, M.P.P., Renfrew-Nipissing-Pembroke (PDF, 3 pages, 490 KB)
- CMD 22-H7.101 – Submission from the County of Renfrew (PDF, 6 pages, 221 KB)
- CMD 22-H7.102 – Submission from the Radiation Safety Institute of Canada (PDF, 2 pages, 122 KB)
- CMD 22-H7.105 – Submission from the Ralliement contre la pollution radioactive (PDF, 9 pages, 559 KB)
- CMD 22-H7.106 – Submission from Benjamin Benson (PDF, 2 pages, 155 KB)
- CMD 22-H7.107 – Submission from Gordon MacMillan (PDF, 2 pages, 593 KB)
- CMD 22-H7.108 – Submission from Bruce Power (PDF, 4 pages, 115 KB)
- CMD 22-H7.109 – Submission from the Algonquins of Pikwàkanagàn First Nation (PDF, 92 pages, 1.33 MB)
- CMD 22-H7.110 – Submission from Dewar Industrial Services Inc. (PDF, 2 pages, 181 KB)
- CMD 22-H7.111 – Submission from the Kebaowek First Nation (PDF, 4 pages, 348 KB)
- CMD 22-H7.112 – Submission from the Cleanup Function at CNL (PDF, 4 pages, 257 KB)
- CMD 22-H7.113 – Submission from the Kitigan Zibi Anishinabeg First Nation (PDF, 6 pages, 1.86 MB)
- CMD 22-H7.114 – Submission from James Harrington (PDF, 3 pages, 713 KB)
- CMD 22-H7.115 – Submission from the Waste Services at CNL (PDF, 8 pages, 1.19 MB)
- CMD 22-H7.116 – Submission from Edward Waller (PDF, 3 pages, 203 KB)
- CMD 22-H7.117 – Submission from the Ottawa Chapter of the Council of Canadians (PDF, 15 pages, 932 KB)
- CMD 22-H7.118 – Submission from Antony G. Morris (PDF, 2 pages, 608 KB)
- CMD 22-H7.119 – Submission from Duncan Noble (PDF, 3 pages, 339 KB)
- CMD 22-H7.120 – Submission from the Wolf Lake First Nation (PDF, 3 pages, 231 KB)
- CMD 22-H7.121 – Submission from Annette Chaplin (PDF, 3 pages, 201 KB)
- CMD 22-H7.122 – Submission from the MRC Pontiac (PDF, 4 pages, 217 KB)
- CMD 22-H7.123 – Submission from the Division of Decommissioning and Environmental Remediation at CNL (PDF, 3 pages, 1.57 MB)
- CMD 22-H7.124 – Submission from Kathryn Lindsay (PDF, 5 pages, 724 KB)
- CMD 22-H7.125 – Submission from Ottawa Riverkeeper (PDF, 46 pages, 1.25 MB)
- CMD 22-H7.126 – Submission from Action Climat Outaouais (PDF, 16 pages, 329 KB)
- CMD 22-H7.127 – Submission from Sophie Chatel, MP of Pontiac (PDF, 29 pages, 536 KB)
- CMD 22-H7.128 – Submission from Erica Coulombe (PDF, 2 pages, 174 KB)
- CMD 22-H7.129 – Submission from the Ottawa River Institute (PDF, 7 pages, 1.56 MB)
- CMD 22-H7.130 – Submission from the Communauté métropolitaine de Montréal (PDF, 63 pages, 2.24 MB)
- CMD 22-H7.131 – Submission from the Brilliant Energy Institute at Ontario Tech University (PDF, 4 pages, 182 KB)
- CMD 22-H7.132 – Submission from Gillian Walker (PDF, 6 pages, 901 KB)
- CMD 22-H7.133 – Submission from Janet Graham (PDF, 3 pages, 667 KB)
- CMD 22-H7.134 – Submission from Richard Snider (PDF, 3 pages, 756 KB)
- CMD 22-H7.135 – Submission from Richard Sexton (PDF, 3 pages, 842 KB)
- CMD 22-H7.136 – Submission from Lynn Jones (PDF, 3 pages, 141 KB)
- CMD 22-H7.137 – Submission from the Responsable national et Co-autorité réglementaire de la radioprotection du Québec (PDF, 11 pages, 690 KB)
- CMD 22-H7.138 – Submission from Northwatch (PDF, 73 pages, 2.6 MB)
- CMD 22-H7.139 – Submission from the Mitchikanibikok Inik, Algonquins of Barriere Lake (PDF, 3 pages, 411 KB)
- CMD 22-H7.140 – Submission from the Curve Lake First Nation (PDF, 12 pages, 507 KB)
- CMD 22-H7.141 – Submission from the Provincial Council of Women of Ontario (PDF, 4 pages, 199 KB)
- CMD 22-H7.142 – Submission from Judith Fox Lee (PDF, 11 pages, 370 KB)
- CMD 22-H7.143 – Submission from the Greenspace Alliance of Canada's Capital (PDF, 5 pages, 190 KB)
- CMD 22-H7.144 – Submission from the Canadian Coalition for Nuclear Responsibility (PDF, 14 pages, 482 KB)
- CMD 22-H7.145 – Submission from Rena Ginsberg and Boyd Reimer (PDF, 3 pages, 144 KB)
- CMD 22-H7.146 – Submission from Nira Dookeran (PDF, 4 pages, 187 KB)
- CMD 22-H7.147 – Submission from Christian Renault (PDF, 2 pages, 128 KB)
- CMD 22-H7.148 – Submission from Pamela Schreiner (PDF, 2 pages, 128 KB)
- CMD 22-H7.149 – Submission from Christine Graham (PDF, 2 pages, 115 KB)
- CMD 22-H7.150 – Submission from Simon J. Daigle (PDF, 7 pages, 561 KB)
- CMD 22-H7.151 – Submission from the Métis Nation of Ontario (PDF, 3 pages, 297 KB)
- CMD 22-H7.152 – Submission from the Waste Strategy Program at CNL (PDF, 3 pages, 618 KB)
- CMD 22-H7.154 – Submission from Daniel Hoornweg (PDF, 2 pages, 177 KB)
- CMD 22-H7.155 – Submission from Johanna Echlin (PDF, 3 pages, 120 KB)
- CMD 22-H7.156 – Submission from Joanne Mantha (PDF, 2 pages, 346 KB)
- CMD 22-H7.157 – Submission from Lisa Shaw-Verhoek (PDF, 3 pages, 168 KB)
- CMD 22-H7.158 – Submission from David K. Raman (PDF, 10 pages, 553 KB)
- CMD 22-H7.159 – Submission from the Agence de bassin versant des 7 (PDF, 3 pages, 236 KB)
- CMD 22-H7.160 – Submission from the Municipality of Clarington (PDF, 3 pages, 969 KB)
- CMD 22-H7.161 – Submission from the Canadian Association of Nuclear Host Communities (PDF, 3 pages, 836 KB)
- CMD 22-H7.162 – Submission from the Rotary Club of Port Hope (PDF, 2 pages, 2.88 MB)
- CMD 22-H7.163 – Submission from the Power Workers' Union (PDF, 4 pages, 333 KB)
- CMD 22-H7.164 – Submission from Greg Stack (PDF, 2 pages, 506 KB)
- CMD 22-H7.165 – Submission from Pierre Lemay (PDF, 2 pages, 126 KB)
- Published on April 6, 2022
May 2022 hearing in writing – Wright Instruments Limited – Revocation of the licence
Revocation of the licence for Wright Instruments Limited
May 2022 hearing in writing – Wright Instruments Limited – Revocation of the licence
May 2022 hearing in writing – Ontario Power Generation – Financial Guarantee
Financial guarantee proposed by Ontario Power Generation (OPG) for its Darlington New Nuclear Project
May 2022 hearing in writing – Ontario Power Generation – Financial Guarantee
-
Published on May 6, 2022
- CMD 22-H103.2 – Submission from the on the Financial guarantee proposed by Ontario Power Generation (OPG) for its Darlington New Nuclear Project (PDF, 5 pages, 163 KB)
- CMD 22-H103.3 – Submission from the North American Young Generation in Nuclear (NAYGN) – Durham Chapter on the Financial guarantee proposed by Ontario Power Generation (OPG) for its Darlington New Nuclear Project (PDF, 4 pages, 237 KB)
-
Published on April 5, 2022
- CMD 22-H103 – Submission from CNSC staff on the Financial guarantee proposed by Ontario Power Generation (OPG) for its Darlington New Nuclear Project (PDF, 21 pages, 551 KB)
- CMD 22-H103.1 – Submission from Ontario Power Generation (OPG) on the Financial guarantee proposed by OPG for its Darlington New Nuclear Project (PDF, 11 pages, 455 KB)
May 10 to 12, 2022 Public Hearings
Application from NB Power for the renewal of the licence for the Point Lepreau Nuclear Generating Station
- Download all documents for the May 10 to 12, 2022 public hearing - Part 1 (ZIP, 66 MB)
- Download all documents for the May 10 to 12, 2022 public hearing - Part 2 (ZIP, 69 MB)
- Download all documents for the May 10 to 12, 2022 public hearing - Part 3 (ZIP, 35 MB)
May 10 to 12, 2022 public hearing
- Published on June 3, 2022
- Published on May 12, 2022
-
Published on April 28, 2022
- CMD 22-H2.177A – Presentation from Helmy Ragheb (PDF, 15 pages, 898 KB)
- CMD 22-H2.B – Supplementary written submission from CNSC staff (PDF, 60 pages, 971 KB)
- CMD 22-H2.C – Presentation from CNSC staff (PDF, 18 pages, 1.1 MB)
- CMD 22-H2.1B – Presentation from NB Power (PDF, pages, 2.87 MB)
- CMD 22-H2.230A – Supplementary written submission from the New Brunswick Emergency Measures Organization (PDF, 12 pages, 366 KB)
- CMD 22-H2.230B – Presentation from the New Brunswick Emergency Measures Organization (PDF, 16 pages, 361 KB)
- CMD 22-H2.139A – Presentation from PEACE-NB (PDF, 27 pages, 1.38 MB)
- CMD 22-H2.171A – Presentation from Jennifer Hannigan (PDF, 11 pages, 243 KB)
- CMD 22-H2.142A – Presentation from Narrative Research (PDF, 10 pages, 1.24 MB)
- CMD 22-H2.194A – Presentation from the Coalition for Responsible Energy Development in New Brunswick (CRED-NB) and the Canadian Environmental Law Association (CELA) (PDF, 30 pages, 1.33 MB)
- CMD 22-H2.161A – Presentation from Paul Thompson (PDF, 11 pages, 1.04 MB)
- CMD 22-H2.220A – Presentation from Northwatch (PDF, 12 pages, 340 KB)
- CMD 22-H2.121A – Presentation from the Town of St. George (PDF, 11 pages, 636 KB)
- CMD 22-H2.112A – Presentation from the Saint John Naturalists’ Club Inc. (PDF, 15 pages, 5.28 MB)
- CMD 22-H2.151A – Presentation from the Fundy North Fishermen’s Association and Fundy Weir Fisherman’s Association Inc (PDF, 17 pages, 2.74 MB)
- CMD 22-H2.198A – Presentation from Ann McAllister (PDF, 9 pages, 288 KB)
- CMD 22-H2.228A – Supplementary written submission from the Canadian Coalition for Nuclear Responsibility (PDF, 6 pages, 385 KB)
- CMD 22-H2.244A – Supplementary written submission from Passamaquoddy Recognition Group Inc. (PDF, 58 pages, 1.5 MB)
- CMD 22-H2.217A – Presentation from the NB Health Emergency Operations Center, New Brunswick Department of Health (PDF, 17 pages, 399 KB)
- Published on April 5, 2022
-
Published on April 4, 2022
- CMD 22-H2.2 – Written submission from Westinghouse Electric Canada (PDF, 3 pages, 444 KB)
- CMD 22-H2.3 – Written submission from Margaret R. MacDonald (PDF, 3 pages, 156 KB)
- CMD 22-H2.4 – Written submission from Alantra Leasing (PDF, 2 pages, 653 KB)
- CMD 22-H2.5 – Written submission from Leap4wards (PDF, 3 pages, 125 KB)
- CMD 22-H2.6 – Written submission from Mark Wilson (PDF, 2 pages, 212 KB)
- CMD 22-H2.7 – Written submission from the Town of Saint Andrews (PDF, 3 pages, 226 KB)
- CMD 22-H2.8 – Written submission from Jean Desrosiers (PDF, 2 pages, 159 KB)
- CMD 22-H2.9 – Written submission from Kathleen Henderson (PDF, 2 pages, 161 KB)
- CMD 22-H2.10 – Written submission from Michael Greene (PDF, 2 pages, 165 KB)
- CMD 22-H2.11 – Written submission from Auréa Cormier (PDF, 2 pages, 180 KB)
- CMD 22-H2.12 – Written submission from Ryan Hillier (PDF, 2 pages, 541 KB)
- CMD 22-H2.13 – Written submission from Elaine Hughes (PDF, 2 pages, 561 KB)
- CMD 22-H2.14 – Written submission from MaryAnne MacKeigan (PDF, 2 pages, 543 KB)
- CMD 22-H2.15 – Written submission from Amy Floyd (PDF, 2 pages, 439 KB)
- CMD 22-H2.16 – Written submission from Heather Reed (PDF, 2 pages, 537 KB)
- CMD 22-H2.17 – Written submission from Sandi McKessock (PDF, 2 pages, 546 KB)
- CMD 22-H2.18 – Written submission from Dawn Mockler (PDF, 2 pages, 550 KB)
- CMD 22-H2.19 – Written submission from Thomas G. McAlister (PDF, 2 pages, 330 KB)
- CMD 22-H2.20 – Written submission from Celina King (PDF, 2 pages, 549 KB)
- CMD 22-H2.21 – Written submission from Heather Cronk (PDF, 2 pages, 628 KB)
- CMD 22-H2.22 – Written submission from Raven Cameron (PDF, 2 pages, 561 KB)
- CMD 22-H2.23 – Written submission from EOS Eco-Energy Inc. (PDF, 6 pages, 365 KB)
- CMD 22-H2.24 – Written submission from Jason Robichaud (PDF, 2 pages, 552 KB)
- CMD 22-H2.25 – Written submission from Marion Taylor (PDF, 2 pages, 587 KB)
- CMD 22-H2.26 – Written submission from Rita Crosbie (PDF, 5 pages, 193 KB)
- CMD 22-H2.27 – Written submission from Victoria Marcott (PDF, 2 pages, 570 KB)
- CMD 22-H2.28 – Written submission from Mary Hatt (PDF, 2 pages, 547 KB)
- CMD 22-H2.29 – Written submission from Kelly Fitzpatrick (PDF, 2 pages, 544 KB)
- CMD 22-H2.30 – Written submission from Charlon Dorey (PDF, 2 pages, 361 KB)
- CMD 22-H2.31 – Written submission from Allison MacKenzie (PDF, 2 pages, 510 KB)
- CMD 22-H2.32 – Written submission from Evelyn Gigantes (PDF, 3 pages, 168 KB)
- CMD 22-H2.33 – Written submission from Lauren Brady (PDF, 6 pages, 199 KB)
- CMD 22-H2.34 – Written submission from Crysta-Lea Lane (PDF, 2 pages, 506 KB)
- CMD 22-H2.35 – Written submission from Steven Dennis (PDF, 2 pages, 517 KB)
- CMD 22-H2.36 – Written submission from Cathie McElman (PDF, 2 pages, 504 KB)
- CMD 22-H2.37 – Written submission from Paige Wilson (PDF, 2 pages, 136 KB)
- CMD 22-H2.38 – Written submission from Julia Hansen (PDF, 3 pages, 821 KB)
- CMD 22-H2.39 – Written submission from Maritime Electric (PDF, 2 pages, 236 KB)
- CMD 22-H2.40 – Written submission from Noelle Mitton (PDF, 2 pages, 500 KB)
- CMD 22-H2.41 – Written submission from Stephen Mahler (PDF, 3 pages, 380 KB)
- CMD 22-H2.42 – Written submission from Alexandra DeCarlo-Graves (PDF, 2 pages, 511 KB)
- CMD 22-H2.43 – Written submission from David Cannon (PDF, 2 pages, 406 KB)
- CMD 22-H2.44 – Written submission from Lauren Clark (PDF, 2 pages, 279 KB)
- CMD 22-H2.45 – Written submission from Page Murphy (PDF, 3 pages, 397 KB)
- CMD 22-H2.46 – Written submission from Mindy Swinemar (PDF, 2 pages, 332 KB)
- CMD 22-H2.47 – Written submission from Karen Heinemann (PDF, 3 pages, 598 KB)
- CMD 22-H2.48 – Written submission from Melissa Estrada (PDF, 2 pages, 399 KB)
- CMD 22-H2.49 – Written submission from Anne-Marie Séguin (PDF, 2 pages, 591 KB)
- CMD 22-H2.50 – Written submission from Sarah Boyer and the Boyer family (PDF, 2 pages, 513 KB)
- CMD 22-H2.51 – Written submission from Helen Chenell (PDF, 2 pages, 512 KB)
- CMD 22-H2.52 – Written submission from Valerie Sherrard (PDF, 2 pages, 531 KB)
- CMD 22-H2.53 – Written submission from Roma De Robertis (PDF, 2 pages, 517 KB)
- CMD 22-H2.54 – Written submission from LED Roadway Lighting Ltd (PDF, 3 pages, 1.28 MB)
- CMD 22-H2.55 – Written submission from Emma Donovan (PDF, 2 pages, 509 KB)
- CMD 22-H2.56 – Written submission from Hayley Clarke (PDF, 2 pages, 510 KB)
- CMD 22-H2.57 – Written submission from Sandra Fowler (PDF, 2 pages, 526 KB)
- CMD 22-H2.58 – Written submission from Brittany Carmichael (PDF, 2 pages, 589 KB)
- CMD 22-H2.59 – Written submission from Vaughn Barnett (PDF, 2 pages, 767 KB)
- CMD 22-H2.60 – Written submission from Benjamin Fortier (PDF, 7 pages, 147 KB)
- CMD 22-H2.61 – Written submission from Jena Hudson (PDF, 2 pages, 327 KB)
- CMD 22-H2.62 – Written submission from Annika Nicholson (PDF, 2 pages, 396 KB)
- CMD 22-H2.63 – Written submission from Paul Bragdon (PDF, 2 pages, 280 KB)
- CMD 22-H2.64 – Written submission from Alex Good (PDF, 2 pages, 526 KB)
- CMD 22-H2.65 – Written submission from Maïna Béland-Rahm (PDF, 2 pages, 167 KB)
- CMD 22-H2.66 – Written submission from Terry Forsyth (PDF, 2 pages, 169 KB)
- CMD 22-H2.67 – Written submission from Marley Nickerson (PDF, 2 pages, 504 KB)
- CMD 22-H2.68 – Written submission from Annabelle Fournier (PDF, 3 pages, 525 KB)
- CMD 22-H2.69 – Written submission from The Rural Community of Campobello Island (PDF, 2 pages, 489 KB)
- CMD 22-H2.70 – Written submission from René Legacy, Member of the Legislative Assembly, Bathurst West-Beresford (PDF, 2 pages, 305 KB)
- CMD 22-H2.71 – Written submission from Dennis Eickmeier (PDF, 2 pages, 578 KB)
- CMD 22-H2.72 – Written submission from Maureen Fowler (PDF, 2 pages, 515 KB)
- CMD 22-H2.73 – Written submission from Julie Cormier (PDF, 2 pages, 326 KB)
- CMD 22-H2.74 – Written submission from the Council of Canadians Fredericton Chapter (PDF, 3 pages, 507 KB)
- CMD 22-H2.75 – Written submission from Vivian Unger (PDF, 2 pages, 599 KB)
- CMD 22-H2.76 – Written submission from theTown of Grand Bay-Westfield (PDF, 2 pages, 345 KB)
- CMD 22-H2.77 – Written submission from Misti Campbell (PDF, 2 pages, 692 KB)
- CMD 22-H2.78 – Written submission from Helen Forsey (PDF, 3 pages, 730 KB)
- CMD 22-H2.79 – Written submission from Linda Dornan (PDF, 2 pages, 516 KB)
- CMD 22-H2.80 – Written submission from Ross McKean (PDF, 5 pages, 16.58 MB)
- CMD 22-H2.81 – Written submission from Olivia Chisholm (PDF, 2 pages, 519 KB)
- CMD 22-H2.82 – Written submission from Josh Shaddick (PDF, 2 pages, 521 KB)
- CMD 22-H2.83 – Written submission from Ed MacAulay (PDF, 2 pages, 514 KB)
- CMD 22-H2.84 – Written submission from William A. MacCallum (PDF, 3 pages, 723 KB)
- CMD 22-H2.85 – Written submission from Pat Poole (PDF, 2 pages, 516 KB)
- CMD 22-H2.86 – Written submission from Danielle Saulnier (PDF, 2 pages, 511 KB)
- CMD 22-H2.87 – Written submission from Craig Robinson (PDF, 2 pages, 510 KB)
- CMD 22-H2.88 – Written submission from the Town of Riverview (PDF, 2 pages, 317 KB)
- CMD 22-H2.89 – Written submission from Elizabeth Lee (PDF, 3 pages, 782 KB)
- CMD 22-H2.90 – Written submission from Geraldine Vautour (PDF, 2 pages, 515 KB)
- CMD 22-H2.91 – Written submission from Daniel Becker (PDF, 7 pages, 209 KB)
- CMD 22-H2.92 – Written submission from Becky Johnson (PDF, 2 pages, 520 KB)
- CMD 22-H2.93 – Written submission from Gail Delano (PDF, 3 pages, 515 KB)
- CMD 22-H2.94 – Written submission from Krista M. Bietz-Bielecki (PDF, 7 pages, 178 KB)
- CMD 22-H2.95 – Written submission from Robyn Guptill (PDF, 2 pages, 501 KB)
- CMD 22-H2.96 – Written submission from Joan Green (PDF, 2 pages, 613 KB)
- CMD 22-H2.97 – Written submission from Karen Daley (PDF, 2 pages, 513 KB)
- CMD 22-H2.98 – Written submission from Faye Arbou (PDF, 2 pages, 402 KB)
- CMD 22-H2.99 – Written submission from John Williamson, MP, New Brunswick Southwest (PDF, 2 pages, 390 KB)
- CMD 22-H2.100 – Written submission from the Village of Belledune (PDF, 2 pages, 940 KB)
- CMD 22-H2.101 – Written submission from Penny Kollar (PDF, 2 pages, 506 KB)
- CMD 22-H2.102 – Written submission from Mike Farrell (PDF, 2 pages, 504 KB)
- CMD 22-H2.103 – Written submission from Christian Boudreau (PDF, 2 pages, 512 KB)
- CMD 22-H2.104 – Written submission from the Council of Canadians, Avalon Chapter (PDF, 2 pages, 205 KB)
- CMD 22-H2.105 – Written submission from David J. Beaudin (PDF, 2 pages, 182 KB)
- CMD 22-H2.106 – Written submission from Catherine Gillespie (PDF, 3 pages, 524 KB)
- CMD 22-H2.107 – Written submission from Paula Tippett (PDF, 8 pages, 710 KB)
- CMD 22-H2.108 – Written submission from Mark Collrin (PDF, 3 pages, 539 KB)
- CMD 22-H2.109 – Written submission from the Canadians for Nuclear Energy (PDF, 3 pages, 113 KB)
- CMD 22-H2.110 – Written submission from Mark LeBlanc (PDF, 4 pages, 943 KB)
- CMD 22-H2.111 – Written submission from Lanaye Dempsey (PDF, 2 pages, 539 KB)
- CMD 22-H2.112 – Written submission from the Saint John Naturalists’ Club Inc. (PDF, 3 pages, 990 KB)
- CMD 22-H2.113 – Written submission from Donald Arseneault (PDF, 3 pages, 585 KB)
- CMD 22-H2.114 – Written submission from Helen Ward-Wakelin (PDF, 2 pages, 162 KB)
- CMD 22-H2.115 – Written submission from Karla D. Robinson (PDF, 3 pages, 534 KB)
- CMD 22-H2.116 – Written submission from Daniel Serre (PDF, 3 pages, 532 KB)
- CMD 22-H2.117 – Written submission from Lawrence Furlotte (PDF, 1 pages, 506 KB)
- CMD 22-H2.118 – Written submission from Justin Legacy (PDF, 2 pages, 501 KB)
- CMD 22-H2.119 – Written submission from Helen Carter (PDF, 2 pages, 513 KB)
- CMD 22-H2.120 – Written submission from the Town of Quispamsis (PDF, 3 pages, 147 KB)
- CMD 22-H2.121 – Written submission from the Town of St. George (PDF, 5 pages, 1.42 MB)
- CMD 22-H2.122 – Written submission from Roberto Montebelli (PDF, 2 pages, 517 KB)
- CMD 22-H2.123 – Written submission from Christopher Corey (PDF, 7 pages, 246 KB)
- CMD 22-H2.124 – Written submission from Robert Thompson (PDF, 3 pages, 116 KB)
- CMD 22-H2.125 – Written submission from the Atlantica Centre for Energy (PDF, 3 pages, 754 KB)
- CMD 22-H2.126 – Written submission from Denise Maillet (PDF, 2 pages, 532 KB)
- CMD 22-H2.127 – Written submission from Priscilla Trecartin (PDF, 2 pages, 521 KB)
- CMD 22-H2.128 – Written submission from Deborah E. Velux (PDF, 5 pages, 208 KB)
- CMD 22-H2.129 – Written submission from the Sustainable Energy Group Carleton County (PDF, 3 pages, 198 KB)
- CMD 22-H2.130 – Written submission from Aline Michaud (PDF, 2 pages, 329 KB)
- CMD 22-H2.131 – Written submission from Tatiana Dedam (PDF, 2 pages, 115 KB)
- CMD 22-H2.132 – Written submission from Lorneville Mechanical Ltd (PDF, 3 pages, 576 KB)
- CMD 22-H2.133 – Written submission from Aarika Allen (PDF, 2 pages, 722 KB)
- CMD 22-H2.134 – Written submission from Tanya MacBean (PDF, 2 pages, 514 KB)
- CMD 22-H2.135 – Written submission from Robyn Connell (PDF, 2 pages, 519 KB)
- CMD 22-H2.136 – Written submission from ARC Clean Energy Canada Inc. (PDF, 3 pages, 245 KB)
- CMD 22-H2.137 – Written submission from Kinectrics Inc. (PDF, 4 pages, 422 KB)
- CMD 22-H2.138 – Written submission from Global First Power (PDF, 3 pages, 217 KB)
- CMD 22-H2.139 – Written submission from PEACE-NB (PDF, 9 pages, 171 KB)
- CMD 22-H2.140 – Written submission from Kelly M. Piers (PDF, 2 pages, 503 KB)
- CMD 22-H2.141 – Written submission from Kayla McGarity (PDF, 2 pages, 506 KB)
- CMD 22-H2.142 – Written submission from Narrative Research (PDF, 3 pages, 849 KB)
- CMD 22-H2.143 – Written submission from Heather Chase (PDF, 3 pages, 269 KB)
- CMD 22-H2.144 – Written submission from Joseph M. Valardo (PDF, 5 pages, 143 KB)
- CMD 22-H2.145 – Written submission from the Kopit Lodge & Elsipogtog First Nation (PDF, 40 pages, 1.2 MB)
- CMD 22-H2.146 – Written submission from Ontario Power Generation (PDF, 3 pages, 294 KB)
- CMD 22-H2.147 – Written submission from Keith A. Miller (PDF, 3 pages, 472 KB)
- CMD 22-H2.148 – Written submission from the Canadian Nuclear Association (PDF, 5 pages, 1.26 MB)
- CMD 22-H2.149 – Written submission from Bruce Power (PDF, 5 pages, 188 KB)
- CMD 22-H2.150 – Written submission from the Organization of Canadian Nuclear Industries (PDF, 3 pages, 184 KB)
- CMD 22-H2.151 – Written submission from the Fundy North Fishermen’s Association and Fundy Weir Fisherman’s Association Inc (PDF, 2 pages, 296 KB)
- CMD 22-H2.152 – Written submission from the Construction Association of New Brunswick (PDF, 2 pages, 291 KB)
- CMD 22-H2.153 – Written submission from Rose Doucet (PDF, 2 pages, 523 KB)
- CMD 22-H2.154 – Written submission from Moltex Energy (PDF, 3 pages, 187 KB)
- CMD 22-H2.155 – Written submission from Cathy Leonard (PDF, 5 pages, 436 KB)
- CMD 22-H2.156 – Written submission from Leah Belding (PDF, 3 pages, 646 KB)
- CMD 22-H2.157 – Written submission from Phillip Belanger (PDF, 2 pages, 505 KB)
- CMD 22-H2.158 – Written submission from the Conseil économique du Nouveau-Brunswick (PDF, 4 pages, 220 KB)
- CMD 22-H2.159 – Written submission from the Comité des 12 (PDF, 2 pages, 532 KB)
- CMD 22-H2.160 – Written submission from Mary Milander (PDF, 3 pages, 831 KB)
- CMD 22-H2.161 – Written submission from Paul Thompson (PDF, 5 pages, 253 KB)
- CMD 22-H2.162 – Written submission from Nancy Strabac and Fred Hudson (PDF, 2 pages, 507 KB)
- CMD 22-H2.163 – Written submission from Lutz E. Becker (PDF, 3 pages, 814 KB)
- CMD 22-H2.164 – Written submission from Kathryn Opyc (PDF, 2 pages, 510 KB)
- CMD 22-H2.165 – Written submission from Helen Soucoup (PDF, 2 pages, 511 KB)
- CMD 22-H2.166 – Written submission from Megan Kellestine (PDF, 2 pages, 515 KB)
- CMD 22-H2.167 – Written submission from Lynne Kennett-Read (PDF, 2 pages, 588 KB)
- CMD 22-H2.168 – Written submission from Tony Reddin and Marion Copleston (PDF, 2 pages, 373 KB)
- CMD 22-H2.169 – Written submission from Jessica Buckley (PDF, 3 pages, 509 KB)
- CMD 22-H2.170 – Written submission from Tom McLean (PDF, 3 pages, 613 KB)
- CMD 22-H2.171 – Written submission from Jennifer Hannigan (PDF, 4 pages, 748 KB)
- CMD 22-H2.172 – Written submission from Linda Melanson (PDF, 2 pages, 521 KB)
- CMD 22-H2.173 – Written submission from Lise Ethier (PDF, 3 pages, 537 KB)
- CMD 22-H2.174 – Written submission from the Association of Professional Engineers and Geoscientists of New Brunswick (PDF, 2 pages, 202 KB)
- CMD 22-H2.175 – Written submission from the Canadian Nuclear Society (PDF, 6 pages, 176 KB)
- CMD 22-H2.176 – Written submission from Imaginons la péninsule acadienne autrement (PDF, 3 pages, 639 KB)
- CMD 22-H2.177 – Written submission from Helmy Ragheb (PDF, 11 pages, 365 KB)
- CMD 22-H2.178 – Written submission from Mary Ellen Stevenson (PDF, 1 pages, 524 KB)
- CMD 22-H2.179 – Written submission from the Canadian Nuclear Workers’ Council (PDF, 5 pages, 587 KB)
- CMD 22-H2.180 – Written submission from the Women in Nuclear Canada (PDF, 3 pages, 274 KB)
- CMD 22-H2.181 – Written submission from Carol A. Ring (PDF, 2 pages, 433 KB)
- CMD 22-H2.182 – Written submission from Dave Shannon (PDF, 2 pages, 165 KB)
- CMD 22-H2.183 – Written submission from Generation Atomic (PDF, 4 pages, 379 KB)
- CMD 22-H2.184 – Written submission from Jess H. Brewer (PDF, 2 pages, 121 KB)
- CMD 22-H2.185 – Written submission from Beth McCann (PDF, 2 pages, 623 KB)
- CMD 22-H2.186 – Written submission from Kelly Newman (PDF, 2 pages, 433 KB)
- CMD 22-H2.187 – Written submission from Nancy Covington (PDF, 2 pages, 1.05 MB)
- CMD 22-H2.188 – Written submission from CANDU Owners Group (PDF, 5 pages, 237 KB)
- CMD 22-H2.189 – Written submission from the North American Young Generation in Nuclear, Durham (PDF, 3 pages, 213 KB)
- CMD 22-H2.190 – Written submission from Cooke Aquaculture Inc. (PDF, 3 pages, 320 KB)
- CMD 22-H2.191 – Written submission from Anne Lindsey (PDF, 3 pages, 640 KB)
- CMD 22-H2.192 – Written submission from Erik LeBrun (PDF, 2 pages, 516 KB)
- CMD 22-H2.193 – Written submission from Gordon McDowell (PDF, 5 pages, 325 KB)
- CMD 22-H2.194 – Written submission from the Coalition for Responsible Energy Development in New Brunswick (CRED-NB) and the Canadian Environmental Law Association (CELA) (PDF, 60 pages, 922 KB)
- CMD 22-H2.195 – Written submission from BWXT Canada Ltd. (PDF, 3 pages, 278 KB)
- CMD 22-H2.196 – Written submission from Mike Holland, Minister of Natural Resources and Energy Development New Brunswick (PDF, 3 pages, 148 KB)
- CMD 22-H2.197 – Written submission from the Rural Action and Voices for the Environment (RAVEN) (PDF, 50 pages, 8.99 MB)
- CMD 22-H2.198 – Written submission from Ann McAllister (PDF, 5 pages, 218 KB)
- CMD 22-H2.199 – Written submission from the Canadian Manufacturers & Exporters (PDF, 4 pages, 356 KB)
- CMD 22-H2.200 – Written submission from Andrea Anderson-Mason, Member of the Legislative Assembly, Fundy-The Isles-Saint John West (PDF, 3 pages, 708 KB)
- CMD 22-H2.201 – Written submission from Susan Curtis (PDF, 2 pages, 124 KB)
- CMD 22-H2.202 – Written submission from Larry Lack and Lee Ann Ward (PDF, 2 pages, 413 KB)
- CMD 22-H2.203 – Written submission from Daniel Beaudry (PDF, 2 pages, 582 KB)
- CMD 22-H2.204 – Written submission from Ron Mawhinney (PDF, 4 pages, 221 KB)
- CMD 22-H2.205 – Written submission from Zachary Simo (PDF, 3 pages, 151 KB)
- CMD 22-H2.206 – Written submission from Renée Turcotte (PDF, 2 pages, 534 KB)
- CMD 22-H2.207 – Written submission from Kim Leffley (PDF, 2 pages, 516 KB)
- CMD 22-H2.208 – Written submission from the Town of Dalhousie (PDF, 2 pages, 101 KB)
- CMD 22-H2.209 – Written submission from the International Brotherhood of Electrical Workers (IBEW), Local 37 (PDF, 8 pages, 810 KB)
- CMD 22-H2.210 – Written submission from Steven Myers, Minister of Environment, Energy and Climate Action, Prince Edward Island (PDF, 2 pages, 145 KB)
- CMD 22-H2.211 – Written submission from Douglas Carmody (PDF, 2 pages, 530 KB)
- CMD 22-H2.212 – Written submission from the Musquash Volunteer Fire-Rescue Department (PDF, 6 pages, 313 KB)
- CMD 22-H2.213 – Written submission from Saint John Region Chamber of Commerce (PDF, 2 pages, 170 KB)
- CMD 22-H2.214 – Written submission from Sunny Corner Enterprises Inc (PDF, 3 pages, 393 KB)
- CMD 22-H2.215 – Written submission from Fundy Bay Senior Citizen’s Club Inc. (PDF, 3 pages, 159 KB)
- CMD 22-H2.216 – Written submission from HAWK Marketing Service (PDF, 2 pages, 193 KB)
- CMD 22-H2.217 – Written submission from the NB Health Emergency Operations Center, New Brunswick Department of Health (PDF, 3 pages, 141 KB)
- CMD 22-H2.218 – Written submission from Center for Nuclear Energy Research on the University of New Brunswick’s Fredericton campus (PDF, 4 pages, 244 KB)
- CMD 22-H2.219 – Written submission from the Nuclear Transparency Project (PDF, 4 pages, 150 KB)
- CMD 22-H2.220 – Written submission from Northwatch (PDF, 12 pages, 421 KB)
- CMD 22-H2.221 – Written submission from Lyman Crawford (PDF, 2 pages, 123 KB)
- CMD 22-H2.222 – Written submission from Gordon W. Dalzell (PDF, 63 pages, 1.17 MB)
- CMD 22-H2.223 – Written submission from Geoff McCabe (PDF, 2 pages, 139 KB)
- CMD 22-H2.224 – Written submission from Kathy Bockus, Member of the Legislative Assembly, Saint Croix (PDF, 2 pages, 160 KB)
- CMD 22-H2.225 – Written submission from Stéphane Boucher (PDF, 3 pages, 137 KB)
- CMD 22-H2.226 – Written submission from Fundy Shores School (PDF, 3 pages, 209 KB)
- CMD 22-H2.227 – Written submission from J.D. Irving, Limited (PDF, 2 pages, 532 KB)
- CMD 22-H2.228 – Written submission from the Canadian Coalition for Nuclear Responsibility (PDF, 12 pages, 538 KB)
- CMD 22-H2.229 – Written submission from South Ridge Maple Co. Ltd. (PDF, 3 pages, 580 KB)
- CMD 22-H2.230 – Written submission from the New Brunswick Emergency Measures Organization (PDF, 3 pages, 207 KB)
- CMD 22-H2.231 – Written submission from the North Shore Micmac District Council (PDF, 3 pages, 1.31 MB)
- CMD 22-H2.232 – Written submission from the Local Service District (PDF, 2 pages, 164 KB)
- CMD 22-H2.233 – Written submission from Richard Bradgon, MP, Tobique-Mactaquac (PDF, 2 pages, 108 KB)
- CMD 22-H2.234 – Written submission from Mi’gmawe’l Tplu’taqnn Incorporated (PDF, 95 pages, 2.89 MB)
- CMD 22-H2.235 – Written submission from Dave Wilson (PDF, 3 pages, 162 KB)
- CMD 22-H2.236 – Written submission from Mawiw Council Inc (PDF, 3 pages, 155 KB)
- CMD 22-H2.237 – Written submission from the City of Saint John (PDF, 3 pages, 196 KB)
- CMD 22-H2.238 – Written submission from the Canadian Nuclear Laboratories (PDF, 3 pages, 1.9 MB)
- CMD 22-H2.239 – Written submission from the Town of Shediac (PDF, 3 pages, 182 KB)
- CMD 22-H2.240 – Written submission from the Brilliant Energy Institute, Ontario Tech University (PDF, 4 pages, 190 KB)
- CMD 22-H2.241 – Written submission from Lester and Helen Hyslop (PDF, 2 pages, 150 KB)
- CMD 22-H2.242 – Written submission from Holly Breau (PDF, 3 pages, 137 KB)
- CMD 22-H2.243 – Written submission from the University Network of Excellence in Nuclear Engineering (UNENE) (PDF, 3 pages, 330 KB)
April 27, 2022 Public Hearings
Application from SRB Technologies Canada Inc. for the renewal of the licence for the SRBT Facility
April 27, 2022 public hearing
-
Published on April 7, 2022
- CMD 22-H8.1A – Supplementary Information from SRBT on the application for licence renewal (PDF, 15 pages, 429 KB)
- CMD 22-H8.1B – Presentation from SRBT on the application for licence renewal (PDF, 52 pages, 8.23 MB)
- CMD 22-H8.A – Presentation from CNSC staff on the application from SRBT for licence renewal (PDF, 50 pages, 1.34 MB)
- CMD 22-H8.3A – Presentation from Anna Tilman (PDF, 17 pages, 530 KB)
-
Published on March 16, 2022
- CMD 22-H8.2 – Written submission from the Renfrew County Regional Science Fair (PDF, 2 pages, 146 KB)
- CMD 22-H8.3 – Written submission from Anna Tilman (PDF, 28 pages, 645 KB)
- CMD 22-H8.4 – Written submission from Steel Fire Equipment Ltd. (PDF, 2 pages, 173 KB)
- CMD 22-H8.5 – Written submission from the City of Pembroke (PDF, 5 pages, 417 KB)
- CMD 22-H8.6 – Written submission from Seiler Instrument & Mfg Co., Inc. (PDF, 2 pages, 146 KB)
- CMD 22-H8.7 – Written submission from Main Street Community Services (PDF, 3 pages, 390 KB)
- CMD 22-H8.8 – Written submission from the Algonquins of Pikawakanagan First Nation (PDF, 29 pages, 1.21 MB)
- CMD 22-H8.9 – Written submission from the Canadian Nuclear Association (PDF, 4 pages, 831 KB)
- CMD 22-H8.10 – Written submission from the Concerned Citizens of Renfrew County Area (PDF, 25 pages, 568 KB)
- CMD 22-H8.11 – Written submission from Isolite (PDF, 2 pages, 160 KB)
- CMD 22-H8.12 – Written submission from Cheryl Gallant, MP, Renfrew-Nipissing-Pembroke (PDF, 2 pages, 484 KB)
- CMD 22-H8.13 – Written submission from Betalight b.v. (PDF, 2 pages, 175 KB)
- CMD 22-H8.14 – Written submission from David J. Winfield (PDF, 10 pages, 254 KB)
- CMD 22-H8.15 – Written submission from the Algonquins of Ontario (PDF, 15 pages, 528 KB)
- CMD 22-H8.16 – Written submission from the Pembroke Fire Department (PDF, 3 pages, 300 KB)
- CMD 22-H8.17 – Written submission from John Yakabuski, MPP, Renfrew-Nipissing-Pembroke (PDF, 2 pages, 319 KB)
- Published on January 14, 2022
March 23-24, 2022 Public Hearings
Application from Cameco Corporation to amend its licence to allow release of 18 Beaverlodge Project properties from licensing
March 24, 2022 public hearing on Cameco Corporation's application
- Published on November 29, 2024
-
Published on March 17, 2022
- CMD 22-H5.1B – Supplementary submission from Cameco Corporation (PDF, 16 pages, 199 KB)
- CMD 22-H5.1C – Presentation from Cameco Corporation (PDF, 31 pages, 4.79 MB)
- CMD 22-H5.B – Presentation from CNSC Staff (PDF, 46 pages, 3.22 MB)
- CMD 22-H5.15B – Presentation from the Ya’thi Néné Land and Resource Office (PDF, 19 pages, 7.47 MB)
- CMD 22-H5.10A – Presentation from Victor Fern (PDF, 11 pages, 2.44 MB)
- CMD 22-H5.11A – Presentation from the Métis Nation of Saskatchewan (PDF, 10 pages, 2.18 MB)
-
Published on March 15, 2022
- CMD 22-H5.7A – Written submission from the Saskatchewan Environmental Society on the Request for Ruling (PDF, 2 pages, 129 KB)
- CMD 22-H5.A – Written submission from CNSC staff on the Request for Ruling (PDF, 8 pages, 572 KB)
- CMD 22-H5.1A – Written submission from Cameco Corporation on the Request for Ruling (PDF, 17 pages, 444 KB)
- CMD 22-H5.5A – Written submission from Orano Canada Inc. on the Request for Ruling (PDF, 4 pages, 258 KB)
- CMD 22-H5.6A – Written submission from Woman in Nuclear (WiN) Canada on the Request for Ruling (PDF, 2 pages, 379 KB)
- CMD 22-H5.12A – Written submission from the Northern Saskatchewan Environmental Quality Committee on the Request for Ruling (PDF, 3 pages, 191 KB)
- CMD 22-H5.13A – Written submission from the Athabasca Chipewyan First Nation on the Request for Ruling (PDF, 3 pages, 436 KB)
- Published on February 28, 2022
- Published on February 23, 2022
- Published on February 10, 2022
-
Published on February 9, 2022
- CMD 22-H5.2 – Written submission from the Canadian Nuclear Association (PDF, 4 pages, 696 KB)
- CMD 22-H5.3 – Written submission from the Saskatchewan Mining Association (PDF, 3 pages, 239 KB)
- CMD 22-H5.4 – Written submission from Kevin Lewandoski (PDF, 2 pages, 494 KB)
- CMD 22-H5.5 – Written submission from Orano Canada Inc. (PDF, 5 pages, 188 KB)
- CMD 22-H5.6 – Written submission from Women in Nuclear (WiN) Canada (PDF, 3 pages, 320 KB)
- CMD 22-H5.7 – Written submission from the Saskatchewan Environmental Society (PDF, 12 pages, 642 KB)
- CMD 22-H5.8 – Written submission from Canada Eldor Inc. (PDF, 4 pages, 231 KB)
- CMD 22-H5.9 – Written submission from Rebekah Wiebe (PDF, 2 pages, 84 KB)
- CMD 22-H5.10 – Written submission from Victor Fern (PDF, 5 pages, 425 KB)
- CMD 22-H5.11 – Written submission from the Métis Nation of Saskatchewan (PDF, 17 pages, 784 KB)
- CMD 22-H5.12 – Written submission from the Northern Saskatchewan Environmental Quality Committee (PDF, 3 pages, 137 KB)
- CMD 22-H5.13 – Written submission from the Athabasca Chipewyan First Nation (PDF, 3 pages, 272 KB)
- Published on December 9, 2021
- Published on December 3, 2021
Application from Canadian Light Source Inc. (CLSI) to renew the Class IB Particle Accelerator Operating Licencee
March 23, 2022 public hearing on CLSI's application
- Published on March 17, 2022
- Published on February 9, 2022
- Published on December 7, 2021
- Published on July 30, 2021
Application from TRIUMF Accelerators Inc. for renewal of operating licence for its particle accelerator facilities
- Download all documents for the March 23, 2022 public hearing on TRIUMF's application (ZIP, 14.50 MB)
March 23, 2022 public hearing on TRIUMF's application
- Published on March 17, 2022
- Published on March 15, 2022
- Published on February 16, 2022
-
Published on February 9, 2022
- CMD 22-H6.2 – Written submission from Sylvia Fedoruk Canadian Centre for Nuclear Innovation Inc. (PDF, 3 pages, 263 KB)
- CMD 22-H6.3 – Written submission from the North American Young Generation in Nuclear (PDF, 6 pages, 290 KB)
- CMD 22-H6.4 – Written submission from the University of British Columbia (PDF, 3 pages, 169 KB)
- CMD 22-H6.5 – Written submission from BWXT Medical Ltd. (PDF, 3 pages, 209 KB)
- CMD 22-H6.6 – Written submission from McMaster University (PDF, 3 pages, 240 KB)
- CMD 22-H6.7 – Written submission from the Canadian Nuclear Association (PDF, 4 pages, 669 KB)
- CMD 22-H6.8 – Written submission from the BC Cancer Research Institute (PDF, 3 pages, 267 KB)
- Published on December 20, 2021
- Published on Aug 3, 2021
February 2022 hearing in writing – Bruce Power – Restart of Bruce A Unit 3
Request to authorize Bruce Power Inc. to restart Bruce Nuclear Generating Station NGS A Unit 3 to service, following any future outages
February 2022 hearing in writing – Bruce Power – Restart of Bruce A Unit 3
- Published on February 18, 2022
- Published on February 17, 2022
- Published on February 14, 2022
- Published on January 31, 2022
- Published on January 20, 2022
February 22, 2022 Public Hearing
Application from the Canadian Nuclear Laboratories to amend its Chalk River Laboratories site licence to authorize the construction of a near surface disposal facility
February 22, 2022 Public Hearing
-
Published on February 16, 2022
- CMD 22-H7.A – Presentation from CNSC Staff to consider the application from the CNL to amend its Chalk River Laboratories site licence to authorize the construction of a near surface disposal facility (PDF, 41 pages, 1.34 MB)
- CMD 22-H7.1A – Presentation from the CNL to consider the application to amend its Chalk River Laboratories site licence to authorize the construction of a near surface disposal facility (PDF, 42 pages, 11.18 MB)
-
Published on January 25, 2022
- CMD 22-H7 – Submission from CNSC Staff to consider the application from the CNL to amend its Chalk River Laboratories site licence to authorize the construction of a near surface disposal facility (PDF, 590 pages, 13.15 MB)
- CMD 22-H7.1 – Submission from the CNL to consider the application to amend its Chalk River Laboratories site licence to authorize the construction of a near surface disposal facility (PDF, 171 pages, 5.93 MB)
January 26, 2022 Public Hearing
Application from NB Power for the renewal of the licence for the Point Lepreau Nuclear Generating Station
January 26, 2022 Public Hearing
- Published on January 19, 2022
- Published on January 18, 2022
-
Published on December 23, 2021
- CMD 22-H2 – Submission from CNSC staff on the application by NB Power for the renewal of the licence for the Point Lepreau Nuclear Generating Station (PDF, 332 pages, 3.77 MB)
- CMD 22-H2.1 – Submission from NB Power on their application for the renewal of the licence for the Point Lepreau Nuclear Generating Station (PDF, 159 pages, 9.13 MB)
December 2021 hearing in writing – Cameco Corporation – Fuel Manufacturing Inc.
Application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility.
December 2021 hearing in writing – Cameco Corporation – Fuel Manufacturing Inc.
- Published on February 1, 2022
- Published on December 9, 2021
-
Published on November 17, 2021
- CMD 21-H105.3 – Submission from the Canadian Nuclear Association to consider an application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 3 pages, 712 KB)
- CMD 21-H105.4 – Submission from the Canadian Nuclear Workers’Council to consider an application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 3 pages, 708 KB)
- CMD 21-H105.5 – Submission from the Curve Lake First Nation to consider an application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 25 pages, 569 KB)
- CMD 21-H105.6 – Submission from the Citizen's Against Radioactive Neighbourhood to consider an application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 8 pages, 318 KB)
- CMD 21-H105.7 – Submission from the Port Hope Community Health Concerns Committee to consider an application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 16 pages, 804 KB)
- CMD 21-H105.8 – Submission from Peter Harris to consider an application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 9 pages, 329 KB)
- Published on October 8, 2021
- Published on September 14, 2021
-
Published on May 18, 2021
- CMD 21-H105.1 – Submission from Cameco Corporation to consider an application for a 1-year licence renewal for its Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 70 pages, 1.05 MB)
- CMD 21-H105.2 – Submission from the Municipality of Port Hope concerning the application from Cameco Corporation (Cameco) for a 1-year licence renewal for the Cameco Fuel Manufacturing Inc. (CFM) facility (PDF, 2 pages, 314 KB)
November 24, 2021 Public Hearing
Application from Cameco Corporation for the renewal of the licence for the Blind River Refinery
- Download all documents for the November 24, 2021 Public Hearing on Cameco Blind River - Part 1(ZIP, 42 MB) Download all documents for the November 24, 2021 Public Hearing on Cameco Blind River - Part 2(ZIP, 38.6 MB)
November 24, 2021 Public Hearing
-
Published on November 12, 2021
- CMD 21-H9.43A – Presentation from Sarah Gabrielle Baron and Joan Morningstar (PDF, 13 pages, 1.86 MB)
- CMD 21-H9.50A – Supplementary written submission from the Mississauga First Nation (PDF, 44 pages, 9.43 MB)
- CMD 21-H9.50B – Presentation from the Mississauga First Nation (PDF, 14 pages, 2.56 MB)
- CMD 21-H9.51A – Presentation from Northwatch (PDF, 11 pages, 593 KB)
- Published on November 10, 2021
- Published on October 27, 2021
- Published on October 22, 2021
-
Published on October 20, 2021
- CMD 21-H9.27 – Submission from Margaret (Marnie) Morin (PDF, 3 pages, 298 KB)
- CMD 21-H9.28 – Submission from Jordan Coventry (PDF, 2 pages, 707 KB)
- CMD 21-H9.29 – Submission from Robert Penner (PDF, 2 pages, 413 KB)
- CMD 21-H9.30 – Submission from William Park (PDF, 2 pages, 610 KB)
- CMD 21-H9.31 – Submission from Ontario Tech University (PDF, 3 pages, 210 KB)
- CMD 21-H9.32 – Submission from Dale Parviainen (PDF, 2 pages, 279 KB)
- CMD 21-H9.33 – Submission from Stephanie Smith (PDF, 2 pages, 392 KB)
- CMD 21-H9.34 – Submission from the École secondaire catholique Jeunesse-Nord (PDF, 2 pages, 359 KB)
- CMD 21-H9.35 – Submission from Laurene Machinski (PDF, 3 pages, 831 KB)
- CMD 21-H9.36 – Submission from Jeffrey Bissaillion (PDF, 2 pages, 291 KB)
- CMD 21-H9.37 – Submission from Ryan Hagger (PDF, 3 pages, 286 KB)
- CMD 21-H9.38 – Submission from Ryne Boyer-Denis (PDF, 3 pages, 248 KB)
- CMD 21-H9.39 – Submission from Collette and Crystal Piche (PDF, 2 pages, 131 KB)
- CMD 21-H9.40 – Submission from the Huron Pines Golf and Country Club (PDF, 2 pages, 467 KB)
- CMD 21-H9.41 – Submission from Bruce Power (PDF, 5 pages, 202 KB)
- CMD 21-H9.42 – Submission from Benoit Belanger (PDF, 2 pages, 158 KB)
- CMD 21-H9.43 – Submission from Sarah Gabrielle Baron and Joan Morningstar (PDF, 41 pages, 3.04 MB)
- CMD 21-H9.44 – Submission from Shawna Mathieu (PDF, 2 pages, 144 KB)
- CMD 21-H9.45 – Submission from Chris Astles (PDF, 2 pages, 98 KB)
- CMD 21-H9.46 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 1001 KB)
- CMD 21-H9.47 – Submission from Janice Brown, Karin Pilon and Cindy MacDonald (PDF, 2 pages, 117 KB)
- CMD 21-H9.48 – Submission from the St. Joseph's Foundation of Elliot Lake (PDF, 3 pages, 160 KB)
-
Published on September 20, 2021
- CMD21-H9.13 – Submission from Trevor Funk (PDF, 2 pages, 230 KB)
- CMD21-H9.14 – Submission from Eric Richer (PDF, 2 pages, 302 KB)
- CMD21-H9.15 – Submission from Jamie McLean (PDF, 2 pages, 245 KB)
- CMD21-H9.16 – Submission from Mark Blondin (PDF, 2 pages, 516 KB)
- CMD21-H9.17 – Submission from Andrew Ludgate (PDF, 2 pages, 246 KB)
- CMD21-H9.18 – Submission from Kelly James (PDF, 3 pages, 882 KB)
- CMD21-H9.19 – Submission from Mike Stortini (PDF, 2 pages, 278 KB)
- CMD21-H9.20 – Submission from Danny Bacon (PDF, 2 pages, 451 KB)
- CMD21-H9.21 – Submission from Claude Grimard (PDF, 2 pages, 496 KB)
- CMD21-H9.22 – Submission from Lee Hannon (PDF, 2 pages, 288 KB)
- CMD21-H9.23 – Submission from Curt King (PDF, 2 pages, 277 KB)
- CMD21-H9.24 – Submission from Dawson Kluding (PDF, 2 pages, 276 KB)
- CMD21-H9.25 – Submission from Chris Zagar (PDF, 2 pages, 294 KB)
- CMD21-H9.26 – Submission from Lisa Roy-Sidock (PDF, 2 pages, 304 KB)
-
Published on August 20, 2021
- CMD 21-H9 – Submission from CNSC Staff on application from Cameco Corporation for renewal of Blind River Refinery Licence (PDF, 212 pages, 2.68 MB)
- CMD 21-H9.1 – Submission from Cameco Corporation on their application for renewal of Blind River Refinery Licence (PDF, 59 pages, 714 KB)
- CMD 21-H9.2 – Submission from Blind River Curling Club (PDF, 2 pages, 395 KB)
- CMD 21-H9.3 – Submission from the Rotary Club of Blind River (PDF, 2 pages, 308 KB)
- CMD 21-H9.4 – Submission from the Township of North Shore (PDF, 2 pages, 261 KB)
- CMD 21-H9.5 – Submission from the Town of Blind River (PDF, 2 pages, 268 KB)
- CMD 21-H9.6 – Submission from Stephane Lemieux (PDF, 2 pages, 248 KB)
- CMD 21-H9.7 – Submission from Pauline Roy (PDF, 2 pages, 432 KB)
- CMD 21-H9.8 – Submission from Milltown Motors Ltd. (PDF, 3 pages, 880 KB)
- CMD 21-H9.9 – Submission from Leroy Construction (PDF, 2 pages, 556 KB)
- CMD 21-H9.10 – Submission from Stephanie MacLeod (PDF, 2 pages, 282 KB)
- CMD 21-H9.11 – Submission from Fraser Copeland (PDF, 2 pages, 505 KB)
- CMD 21-H9.12 – Submission from Kris Olsen (PDF, 2 pages, 275 KB)
November 2021 hearing in writing – Ontario Power Generation – Restart of Pickering Units 6-7-8 and Darlington 1 and 4
Request for authorization to return Pickering Nuclear Generating Station Units 6-7-8 and Darlington Nuclear Generating Station Units 1 and 4 to service
November 2021 hearing in writing – Ontario Power Generation – Restart of Pickering Units 6-7-8 and Darlington 1 and 4
-
Published on November 5, 2021
- Submission from CNSC Staff to consider a request for authorization to return Pickering Nuclear Generating Station Units 6-7-8 and Darlington Nuclear Generating Station Units 1 and 4 to service (PDF, 16 pages, 4.28 MB)
- Supplementary Information from CNSC Staff to consider a request for authorization to return Pickering Nuclear Generating Station Units 6-7-8 and Darlington Nuclear Generating Station Units 1 and 4 to service (PDF, 4 pages, 593 KB)
- Submission from Ontario Power Generation to consider a request for authorization to return Pickering Nuclear Generating Station Units 6-7-8 (PDF, 34 pages, 2.67 MB)
- Submission from Ontario Power Generation to consider a request for authorization to return Darlington Nuclear Generating Station Units 1 and 4 to service (PDF, 35 pages, 2.54 MB)
- Supplementary Information from Ontario Power Generation to consider a request for authorization to return Pickering Nuclear Generating Station Units 6-7-8 and Darlington Nuclear Generating Station Units 1 and 4 to service (PDF, 5 pages, 854 KB)
- Questions from External Advisory Committee concerning the request from Ontario Power Generation for authorization to return Pickering Nuclear Generating Station Units 6-7-8 and Darlington Nuclear Generating Station Units 1 and 4 to service (PDF, 3 pages, 728 KB)
November 2021 hearing in writing – Bruce Power Inc. – Restart Units 4-5-7-8
request for the authorization to restart Bruce Nuclear Generating Station A Unit 4 and Bruce NGS B Units 5, 7, and 8 following future outages
November 2021 hearing in writing – Bruce Power Inc. – Restart Units 4-5-7-8
-
Published on February 9, 2022
- CMD 21-H113.A – Supplementary Information from CNSC Staff to consider a request for authorize Bruce Power Inc. to restart Bruce Nuclear Generating Station A Unit 4 and Bruce NGS B Units 5, 7, and 8 following future outages (PDF, 18 pages, 806 KB)
- CMD 21-H113.1B – Supplementary Information from Bruce Power Inc. to consider a request for authorize Bruce Power Inc. to restart Bruce Nuclear Generating Station A Unit 4 and Bruce NGS B Units 5, 7, and 8 following future outages (PDF, 2 pages, 409 KB)
-
Published on November 12, 2021
- CMD 21-H113.1A – Supplementary Information from Bruce Power Inc. to consider a request for authorize Bruce Power Inc. to restart Bruce Nuclear Generating Station A Unit 4 and Bruce NGS B Units 5, 7, and 8 following future outages (PDF, 5 pages, 448 KB)
- CMD 21-H113.2 – Questions from External Advisory Committee to Bruce Power Inc. and CNSC Staff to consider a request for the authorization to restart Bruce Nuclear Generating Station A Unit 4 and Bruce NGS B Units 5, 7, and 8 following future outages (PDF, 3 pages, 514 KB)
-
Published on November 5, 2021
- CMD 21-H113 – Submission from CNSC Staff to consider a request for authorize Bruce Power Inc. to restart Bruce Nuclear Generating Station A Unit 4 and Bruce NGS B Units 5, 7, and 8 following future outages (PDF, 14 pages, 252 KB)
- CMD 21-H113.1 – Submission from Bruce Power Inc. to consider a request for the authorization to restart Bruce Nuclear Generating Station A Unit 4 and Bruce NGS B Units 5, 7, and 8 following future outages (PDF, 37 pages, 1.34 MB)
November 2021 hearing in writing – Canadian Nuclear Laboratories – Port Granby Project
Application from Canadian Nuclear Laboratories requesting a one-year licence renewal for the Port Granby Project
November 2021 hearing in writing – Canadian Nuclear Laboratories – Port Granby Project
-
Published on October 26, 2021
- CMD 21-H102.4A – Revised Submission from the Curve Lake First Nation to consider an application from Canadian Nuclear Laboratories (CNL) requesting a one-year licence renewal for the Port Granby Project (PDF, 21 pages, 835 KB)
- CMD 21-H102.6 – Submission from the Mohawks of the Bay of Quinte to consider an application from Canadian Nuclear Laboratories (CNL) requesting a one-year licence renewal for the Port Granby Project (PDF, 10 pages, 316 KB)
-
Published on October 19, 2021
- CMD 21-H102.3 – Submission from the Canadian Association of Nuclear Host Communities to consider an application from Canadian Nuclear Laboratories (CNL) requesting a one-year licence renewal for the Port Granby Project (PDF, 4 pages, 221 KB)
- CMD 21-H102.4 – Submission from the Curve Lake First Nation to consider an application from Canadian Nuclear Laboratories (CNL) requesting a one-year licence renewal for the Port Granby Project (PDF, 22 pages, 396 KB)
- CMD 21-H102.5 – Submission from the Canadian Nuclear Association to consider an application from Canadian Nuclear Laboratories (CNL) requesting a one-year licence renewal for the Port Granby Project (PDF, 3 pages, 741 KB)
- Published on September 3, 2021
-
Published on May 17, 2021
- CMD 21-H102.1 – Submission from Canadian Nuclear Laboratories (CNL) requesting a one-year licence renewal for the Port Granby Project (PDF, 22 pages, 881 KB)
- CMD 21-H102.2 – Submission from Labourers' International Union of North America (LiUNA) for the application from Canadian Nuclear Laboratories requesting a one-year licence renewal for the Port Granby Project (PDF, 3 pages, 180 KB)
October 2021 hearing in writing – Ontario Power Generation – Restart of Pickering Unit 5
Request for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage
October 2021 hearing in writing – Ontario Power Generation – Restart of Pickering Unit 5
-
Published on October 15, 2021
- CMD 21-H111.1D – Supplementary Information from Ontario Power Generation to consider a request for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage (PDF, 3 pages, 369 KB)
- CMD 21-H111.2 – Questions from External Advisory Committee to Ontario Power Generation on a request for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage (PDF, 2 pages, 445 KB)
-
Published on October 12, 2021
- CMD 21-H111 – Submission from CNSC Staff to consider a request from Ontario Power Generation for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage (PDF, 16 pages, 708 KB)
- CMD 21-H111.1C – Supplementary Information from Ontario Power Generation to consider a request for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage (PDF, 6 pages, 468 KB)
-
Published on October 8, 2021
- CMD 21-H111.1 – Submission from Ontario Power Generation to consider a Request for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage (PDF, 34 pages, 2.67 MB)
- CMD 21-H111.1A – Supplementary Information from Ontario Power Generation to consider a Request for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage (PDF, 3 pages, 668 KB)
- CMD 21-H111.1B – Supplementary Information from Ontario Power Generation to consider a Request for authorization to return Pickering Nuclear Generating Station Unit 5 to service, following its current forced outage (PDF, 13 pages, 2.37 MB)
October 2021 hearing in writing – Bruce Power – Restart of Bruce A Unit 3
Request from Bruce Power Inc. for authorization to return Bruce Nuclear Generating Station (NGS) A Unit 3 to service, following its current planned outage
October 2021 hearing in writing – Bruce Power – Restart of Bruce A Unit 3
- Published on October 12, 2021
-
Published on October 5, 2021
- CMD 21-H110.1 – Submission from Bruce Power to consider a request for authorization to return Bruce Nuclear Generating Station (NGS) A Unit 3 to service, following its current planned outage (PDF, 211 pages, 3.12 MB)
- CMD 21-H110.1A – Supplementary Information from Bruce Power to consider a request for authorization to return Bruce Nuclear Generating Station (NGS) A Unit 3 to service, following its current planned outage (PDF, 21 pages, 545 KB)
- CMD 21-H110.1B – Supplementary Information from Bruce Power to consider a request for authorization to return Bruce Nuclear Generating Station (NGS) A Unit 3 to service, following its current planned outage (PDF, 10 pages, 502 KB)
- Published on October 1, 2021
October 2021 hearing in writing - Canadian Light Source Inc. (CLSI)
Application to change the licensing basis for its Class 1B particle accelerator facility
October 2021 hearing in writing - Canadian Light Source Inc. (CLSI)
-
Published on September 2, 2021
- CMD 21-H109.1 – Submission from Canadian Light Source Inc. (CLSI) concerning the application to change the licensing basis for its Class 1B particle accelerator facility (PDF, 3 pages, 750 KB)
- CMD 21-H109 – Submission from CNSC Staff concerning the application from Canadian Light Source Inc. (CLSI) to change the licensing basis for its Class 1B particle accelerator facility (PDF, 16 pages, 1.10 MB)
October 4, 2021 Public Hearing
Application from Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation
October 4, 2021 Public Hearing
- Published on October 15, 2021
-
Published on September 16, 2021
- CMD 21-H6.A – Presentation from CNSC Staff (PDF, 41 pages, 3.50 MB)
- CMD 21-H6.1A – Presentation from Orano Canada Inc. (PDF, 27 pages, 2.27 MB)
- CMD 21-H6.3A – Presentation from the Métis Nation-Saskatchewan (PDF, 9 pages, 1.77 MB)
- CMD 21-H6.6A – Presentation from Cameco Corporation (PDF, 11 pages, 2.32 MB)
-
Published on August 20, 2021
- CMD 21-H6.2 – Submission from Unifor Local 48-s on the application by Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 2 pages, 142 KB)
- CMD 21-H6.3 – Submission from the Métis Nation-Saskatchewan on the application by Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 54 pages, 3.70 MB)
- CMD 21-H6.4 – Submission from Denison Mines Corp. on the application by Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 4 pages, 283 KB)
- CMD 21-H6.5 – Submission from the Athabasca Joint Engagement and Environmental Subcommittee on the application by Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 4 pages, 344 KB)
- CMD 21-H6.6 – Submission from Cameco Corporation on the application by Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 6 pages, 144 KB)
- CMD 21-H6.7 – Submission from the English River First Nation on the application by Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 24 pages, 1.04 MB)
-
Published on June 16, 2021
- CMD 21-H6 – Submission from CNSC staff on the application by Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 220 pages, 5.83 MB)
- CMD 21-H6.1 – Submission from Orano Canada Inc. for a licence amendment for the expansion of the JEB Tailings Management Facility at the McClean Lake Operation (PDF, 137 pages, 6 MB)
September 2021 hearing in writing – Bruce Power - Lutetium-177
Application from Bruce Power to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS)
September 2021 hearing in writing – Bruce Power - Lutetium-177
- Published on July 20, 2021
- Published on July 14, 2021
- Published on June 30, 2021
-
Published on June 17, 2021
- CMD 21-H100.A – Supplemental information from CNSC Staff to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 17 pages, 285 KB)
- CMD 21-H100.1A – Supplemental information from Bruce Power to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 8 pages, 186 KB)
-
Published on May 28, 2021
- CMD 21-H100.6 – Submission from Women in Nuclear to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 40 pages pages, 311 KB)
- CMD 21-H100.7 – Submission from BWXT Canada Ltd. to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 43 pages pages, 585 KB)
- CMD 21-H100.8 – Submission from Pediatric Oncology Group of Ontario to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 7 pages pages, 596 KB)
- CMD 21-H100.9 – Submission from Canadian Nuclear Isotope Council to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 23 pages pages, 253 KB)
- CMD 21-H100.10 – Submission from Westinghouse Electric Canada to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 11 pages pages, 274 KB)
- CMD 21-H100.11 – Submission from Toronto Region Board of Trade to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 14 pages pages, 243 KB)
- CMD 21-H100.12 – Submission from the Power Workers’ Union to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 18 pages pages, 482 KB)
- CMD 21-H100.13 – Submission from the Canadian Nuclear Association to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 8 pages pages, 819 KB)
- CMD 21-H100.14 – Submission from the McMaster University to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 12 pages pages, 381 KB)
- CMD 21-H100.15 – Submission from Isotopen Technologien Muenchen AG to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 16 pages pages, 1.8 MB)
- CMD 21-H100.16 – Submission from Kinectrics to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 8 pages pages, 246 KB)
- CMD 21-H100.17 – Submission from Brain Tumor Foundation of Canada to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 11 pages pages, 191 KB)
- CMD 21-H100.18 – Submission from Cameco Corporation to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 44 pages pages, 256 KB)
- CMD 21-H100.19 – Submission from the Canadian Nuclear Workers' Council to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 43 pages pages, 625 KB)
- CMD 21-H100.20 – Submission from Saugeen Ojibway Nation to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 18 pages pages, 696 KB)
- CMD 21-H100.21 – Submission from Boston Scientific to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, pages, 864 KB)
- Published on May 20, 2021
- Published on May 17, 2021
- Published on May 14, 2021
-
Published on April 14, 2021
- CMD 21-H100 – Submission from CNSC Staff to consider an application from Bruce Power to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 262 pages, 41.59 MB)
- CMD 21-H100.1 – Submission from Bruce Power to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 115 pages, 2.93 MB)
- CMD 21-H100.2 – Submission from Métis Nation of Ontario to consider an application to allow the production of lutetium-177 (Lu-177) at the Bruce Nuclear Generating Station (NGS) (PDF, 3 pages, 254 KB)
September 2021 hearing in writing – Ontario Power Generation Inc. - Molybdenum-99 Mo-99
Application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS)
September 2021 hearing in writing – Ontario Power Generation Inc. - Molybdenum-99 Mo-99
-
Published on September 27, 2021
- CMD 21-H107.A – Supplementary Information from CNSC Staff regarding the application from Ontario Power Generation for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 16 pages, 411 KB)
- CMD 21-H107.1B – Supplementary Information from Ontario Power Generation regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 12 pages, 392 KB)
- Published on September 22, 2021
- Published on September 9, 2021
-
Published on August 25, 2021
- CMD 21-H107.1A – Supplementary Information from Ontario Power Generation regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 27 pages, 7.01 MB)
- CMD 21-H107.10 – Submission from Anna Tilman regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 11 pages, 694 KB)
- CMD 21-H107.11 – Submission from NAGYN Durham Chapter regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 3 pages, 639 KB)
-
Published on August 20, 2021
- CMD 21-H107.4 – Submission from the Canadian Nuclear Association regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 4 pages, 466 KB)
- CMD 21-H107.5 – Submission from Helmy Ragheb egarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 10 pages, 1.05 MB)
- CMD 21-H107.6 – Submission from the Curve Lake First Nation regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 7 pages, 786 KB)
- CMD 21-H107.7 – Submission from the Canadian Environmental Law Association regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 34 pages, 1.28 MB)
- CMD 21-H107.8 – Submission from The Society of United Professionals regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 5 pages, 320 KB)
- CMD 21-H107.9 – Submission from the Canadian Nuclear Workers’ Council regarding the application for a licence amendment to authorize activities related to the production and possession of Molybdenum-99 (Mo-99) at the Darlington Nuclear Generating Station (NGS) (PDF, 6 pages, 727 KB)
- Published on August 9, 2021
- Published on July 30, 2021
- Published on June 23, 2021
- Published on May 19, 2021
September 2021 hearing in writing – Saskatchewan Research Council – Licence to Abandon
Application from the Saskatchewan Research Council for a licence to abandon the SLOWPOKE-2 reactor facility
September 2021 hearing in writing – Saskatchewan Research Council – Licence to Abandon
- Published on August 30, 2021
- Published on August 18, 2021
- Published on June 21, 2021
- Published on May 18, 2021
September 10, 2021 Public Hearing
Opportunity to be heard on Orders issued by a Designated Officer to Ontario Power Generation and Bruce Power
September 10, 2021 Public Hearing
- Published on September 9, 2021
-
Published on September 3, 2021
- CMD 21-H11.2A – Presentation from Bruce Power (PDF, 28 pages, 968 KB)
- CMD 21-H11.2 – Submission from Bruce Power (PDF, 32 pages, 978 KB)
- CMD 21-H11.1A – Presentation from Ontario Power Generation (PDF, 40 pages, 1.93 MB)
- CMD 21-H11.1 – Submission from Ontario Power Generation (PDF, 51 pages, 2.28 MB)
- CMD 21-H11 – Submission from CNSC Staff (PDF, 23 pages, 812 KB)
July 2021 hearing in writing – Bruce Power – Temporary Exemption
Request from Bruce Power for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants
July 2021 hearing in writing – Bruce Power – Temporary Exemption
- Published on June 23, 2021
-
Published on June 18, 2021
- CMD 21-H103.B – Supplementary information from CNSC Staff concerning the application for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 13 pages, 292 KB)
- CMD 21-H103.1A – Supplementary information from Bruce Power concerning the application for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 6 pages, 456 KB)
- Published on June 17, 2021
-
Published on June 1, 2021
- CMD 21-H103.4 – Submission from the Canadian Nuclear Association for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 3 pages, 608 KB)
- CMD 21-H103.5 – Submission from Louis-Arthur Langlois for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 3 pages, 410 KB)
-
Published on May 5, 2021
- CMD 21-H103.2 – Submission from the Society of United Professionals for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 3 pages, 304 KB)
- CMD 21-H103.3 – Submission from the Power Workers’ Union for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 2 pages, 354 KB)
-
Published on April 8, 2021
- CMD 21-H103 – Submission from CNSC Staff to consider an application from Bruce Power for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 3 pages, 860 KB)
- CMD 21-H103.1 – Submission from Bruce Power for a temporary exemption from sections 23.1.2(2) and 23.2.1 of REGDOC-2.2.3, Personnel Certification, Volume III: Certification of Persons Working at Nuclear Power Plants (PDF, 20 pages, 303 KB)
June 9-11, 2021 Public Hearings
Application from Ontario Power Generation (OPG) to renew the nuclear power reactor site preparation licence for the Darlington New Nuclear Project
- Download all documents for the June 10-11, 2021 public hearing on OPG's application - Part 1 (ZIP, 68 MB)
- Download all documents for the June 10-11, 2021 public hearing on OPG's application - Part 2 (ZIP, 11 MB)
June 10-11, 2021 Public Hearing on OPG's application
- Published on August 4, 2021
- Published on June 10, 2021
- Published on June 1, 2021
-
Published on May 28, 2021
- CMD 21-H4.A – Presentation from CNSC Staff (PDF, 40 pages, 1.07 MB)
- CMD 21-H4.1A – Presentation from Ontario Power Generation (PDF, 43 pages, 4.97 MB)
- CMD 21-H4.1B – Supplementary submission from Ontario Power Generation (PDF, 7 pages, 6 MB)
- CMD 21-H4.21A – Presentation from the Municipality of Clarington (PDF, 23 pages, 1.81 MB)
- CMD 21-H4.24A – Presentation from Kinectrics (PDF, 11 pages, 764 KB)
- CMD 21-H4.31A – Presentation from the Society of United Professionals (PDF, 14 pages, 193 KB)
- CMD 21-H4.37A – Presentation from Durham Nuclear Awareness and the Canadian Environmental Law Association (PDF, 18 pages, 229 KB)
- CMD 21-H4.41A – Presentation from the Regional Municipality of Durham (PDF, 8 pages, 4.03 MB)
- CMD 21-H4.43A – Presentation from Northwatch (PDF, 12 pages, 1.09 MB)
- CMD 21-H4.47A – Presentation from Louis Bertrand (PDF, 16 pages, 816 KB)
- CMD 21-H4.52A – Presentation from Hatch (PDF, 8 pages, 903 KB)
- CMD 21-H4.59A – Presentation from Darek Kulczynski (PDF, 11 pages, 651 KB)
- Published on May 18, 2021
- Published on May 11, 2021
- Published on May 10, 2021
-
Published on May 6, 2021
- CMD 21-H4.2 – Submission from the Municipality of Port Hope (PDF, 2 pages, 115 KB)
- CMD 21-H4.3 – Submission from the Pickering Nuclear Community Advisory Council (PDF, 19 pages, 4.43 MB)
- CMD 21-H4.4 – Submission from Ontario Clean Air Alliance (PDF, 13 pages, 3.3 MB)
- CMD 21-H4.5 – Submission from Moltex Energy (PDF, 3 pages, 209 KB)
- CMD 21-H4.6 – Submission from Ontario Chamber of Commerce (PDF, 4 pages, 192 KB)
- CMD 21-H4.7 – Submission from Greater Oshawa Chamber of Commerce (PDF, 3 pages, 203 KB)
- CMD 21-H4.8 – Submission from North America Young Generation in Nuclear (PDF, 8 pages, 1.3 MB)
- CMD 21-H4.9 – Submission from Bruce Power (PDF, 5 pages, 190 KB)
- CMD 21-H4.10 – Submission from Clarington Board of Trade and Office of Economic Development (PDF, 3 pages, 281 KB)
- CMD 21-H4.11 – Submission from Énergie NB Power (PDF, 3 pages, 313 KB)
- CMD 21-H4.12 – Submission from E.S. Fox Limited (PDF, 5 pages, 258 KB)
- CMD 21-H4.13 – Submission from the Darlington Nuclear Community Advisory Council (PDF, 11 pages, 292 KB)
- CMD 21-H4.14 – Submission from Terrestrial Energy (PDF, 3 pages, 782 KB)
- CMD 21-H4.15 – Submission from Organization of Canadian Nuclear Industries (PDF, 2 pages, 162 KB)
- CMD 21-H4.16 – Submission from PCL Industrial Constructors Inc. (PDF, 4 pages, 3.37 MB)
- CMD 21-H4.17 – Submission from TerraPower (PDF, 3 pages, 937 KB)
- CMD 21-H4.18 – Submission from SaskPower (PDF, 3 pages, 272 KB)
- CMD 21-H4.19 – Submission from ARC Clean Energy Canada (PDF, 3 pages, 241 KB)
- CMD 21-H4.20 – Submission from CANDU Owners Group Inc. (PDF, 6 pages, 230 KB)
- CMD 21-H4.21 – Submission from the Municipality of Clarington (PDF, 14 pages, 923 KB)
- CMD 21-H4.22 – Submission from Jerry Cuttler (PDF, 35 pages, 3.82 MB)
- CMD 21-H4.23 – Submission from Atomic Energy of Canada Limited (PDF, 3 pages, 208 KB)
- CMD 21-H4.24 – Submission from Kinectrics (PDF, 5 pages, 205 KB)
- CMD 21-H4.25 – Submission from Ajax-Pickering Board of Trade (PDF, 3 pages, 172 KB)
- CMD 21-H4.26 – Submission from Canadian Nuclear Laboratories (PDF, 3 pages, 507 KB)
- CMD 21-H4.27 – Submission from Erwin Dreessen (PDF, 2 pages, 117 KB)
- CMD 21-H4.28 – Submission from Labourers' International Union of North America (LiUNA) (PDF, 4 pages, 158 KB)
- CMD 21-H4.29 – Submission from Power Workers’ Union (PDF, 8 pages, 181 KB)
- CMD 21-H4.30 – Submission from X-energy Canada Inc. (PDF, 3 pages, 541 KB)
- CMD 21-H4.31 – Submission from the Society of United Professionals (PDF, 9 pages, 197 KB)
- CMD 21-H4.32 – Submission from USNC-Power (PDF, 3 pages, 209 KB)
- CMD 21-H4.33 – Submission from Aecon Nuclear (PDF, 3 pages, 277 KB)
- CMD 21-H4.34 – Submission from Canadian Association of Nuclear Host Communities (PDF, 6 pages, 395 KB)
- CMD 21-H4.35 – Submission from the Canadian Nuclear Association (PDF, 5 pages, 987 KB)
- CMD 21-H4.36 – Submission from the Canadian Association of Physicians for the Environment (PDF, 5 pages, 171 KB)
- CMD 21-H4.37 – Submission from Durham Nuclear Awarness and the Canadian Environmental Law Association (PDF, 195 pages, 5.49 MB)
- CMD 21-H4.38 – Submission from Canadian Nuclear Workers’ Council (PDF, 8 pages, 598 KB)
- CMD 21-H4.39 – Submission from AECOM Canada Nuclear Services, Inc. (PDF, 3 pages, 261 KB)
- CMD 21-H4.40 – Submission from GE Hitachi Nuclear Energy (PDF, 5 pages, 295 KB)
- CMD 21-H4.41 – Submission from the Regional Municipality of Durham (PDF, 18 pages, 950 KB)
- CMD 21-H4.42 – Submission from the Ontario Nuclear New Build Council (PDF, 3 pages, 240 KB)
- CMD 21-H4.43 – Submission from Northwatch (PDF, 30 pages, 942 KB)
- CMD 21-H4.44 – Submission from Lindsey Park, Member of the Provincial Parliament, Durham (PDF, 3 pages, 1.06 MB)
- CMD 21-H4.45 – Submission from the Nuclear Waste Management Organization (PDF, 3 pages, 207 KB)
- CMD 21-H4.46 – Submission from NuScale Power (PDF, 8 pages, 1.39 MB)
- CMD 21-H4.47 – Submission from Louis Bertrand (PDF, 13 pages, 265 KB)
- CMD 21-H4.48 – Submission from Kelly Clune (PDF, 3 pages, 139 KB)
- CMD 21-H4.49 – Submission from the Whitby Chamber of Commerce (PDF, 2 pages, 4.55 MB)
- CMD 21-H4.50 – Submission from Robert Farley (PDF, 2 pages, 138 KB)
- CMD 21-H4.51 – Submission from the Canadian Nuclear Society (PDF, 4 pages, 204 KB)
- CMD 21-H4.52 – Submission from Hatch (PDF, 5 pages, 137 KB)
- CMD 21-H4.53 – Submission from Women in Nuclear Canada (PDF, 5 pages, 304 KB)
- CMD 21-H4.54 – Submission from the Canadian Electricity Association (PDF, 3 pages, 180 KB)
- CMD 21-H4.55 – Submission from BWXT Canada Ltd. (PDF, 3 pages, 738 KB)
- CMD 21-H4.56 – Submission from Westinghouse Electric Canada Inc. (PDF, 6 pages, 313 KB)
- CMD 21-H4.57 – Submission from North American Young Generation in Nuclear (NAYGN) - Durham Chapter (PDF, 12 pages, 498 KB)
- CMD 21-H4.58 – Submission from Ontario Tech University (PDF, 5 pages, 441 KB)
- CMD 21-H4.59 – Submission from Darek Kulczynski (PDF, 11 pages, 915 KB)
- Published on March 9, 2021
- Published on February 25, 2021
Application from BWXT Medical Ltd. for a Class IB nuclear substance processing facility operating licence
- Download a particular PDF document for the June 9, 2021 public hearing on BWXT Medical's application
June 9, 2021 Public Hearing on BWXT Medical's application
- Published on June 1, 2021
- Published on May 28, 2021
- Published on May 20, 2021
- Published on May 13, 2021
- Published on May 11, 2021
-
Published on May 6, 2021
- CMD 21-H5.2 – Submission from Juan Carlos Herrera (PDF, 2 pages, 91 KB)
- CMD 21-H5.3 – Submission from Oliver Drerup (PDF, 3 pages, 156 KB)
- CMD 21-H5.4 – Submission from the Canadian Nuclear Isotope Council (PDF, 3 pages, 262 KB)
- CMD 21-H5.5 – Submission from Anna Tilman (PDF, 23 pages, 730 KB)
- CMD 21-H5.6 – Submission from the Organization of Canadian Nuclear Industries (PDF, 2 pages, 325 KB)
- CMD 21-H5.7 – Submission from the Algonquins of Ontario (PDF, 19 pages, 811 KB)
- CMD 21-H5.8 – Submission from Laurentis Energy Partners (PDF, 3 pages, 409 KB)
- CMD 21-H5.9 – Submission from the Algonquins of Pikwakanagan First Nation (PDF, 19 pages, 1.34 MB)
- CMD 21-H5.10 – Submission from Ontario Power Generation (PDF, 3 pages, 211 KB)
- CMD 21-H5.11 – Submission from Kinectrics (PDF, 4 pages, 197 KB)
- CMD 21-H5.12 – Submission from Nordion (PDF, 4 pages, 230 KB)
- CMD 21-H5.13 – Submission from United Pharmacy Partners (PDF, 4 pages, 267 KB)
- CMD 21-H5.14 – Submission from Women in Nuclear (PDF, 52 pages, 671 KB)
- CMD 21-H5.15 – Submission from Ontario’s Nuclear Advantage (PDF, 3 pages, 363 KB)
- CMD 21-H5.16 – Submission from Nuclear Innovation Institute (PDF, 3 pages, 198 KB)
- CMD 21-H5.17 – Submission from TRIUMF Innovations (PDF, 2 pages, 222 KB)
- CMD 21-H5.18 – Submission from Canadian Nuclear Association (PDF, 4 pages, 757 KB)
- CMD 21-H5.19 – Submission from Boston Scientific (PDF, 3 pages, 895 KB)
- CMD 21-H5.21 – Submission from University of Alberta (PDF, 3 pages, 477 KB)
- Published on March 10, 2021
April 28-29, 2021 Public Hearing
Application from Cameco Corporation for the renewal of the uranium mine licence for the Cigar Lake Operation
April 28-29, 2021 Public Hearing
-
Published on April 15, 2021
- CMD 21-H2.A – Presentation from CNSC staff on the application by Cameco Corporation for the renewal of the licence for Cigar Lake Operation (PDF, 51 pages, 2.1 MB)
- CMD 21-H2.1A – Presentation from Cameco Corporation on its application for the renewal of the licence for Cigar Lake Operation (PDF, 29 pages, 3.37 MB)
- CMD 21-H2.2A – Presentation from Rick Robillard (PDF, 14 pages, 2.87 MB)
- CMD 21-H2.6A – Presentation from the Saskatchewan Mining Association (PDF, 13 pages, 2.1 MB)
- CMD 21-H2.10A – Presentation from Orano Canada Inc. (PDF, 7 pages, 980 KB)
- CMD 21-H2.19A – Presentation from the Kineepik Métis Local (PDF, 10 pages, 842 KB)
- CMD 21-H2.23A – Presentation from the Canadian Nuclear Workers’ Council (PDF, 20 pages, 736 KB)
- CMD 21-H2.29A – Supplementary written submission from English River First Nation (revised letter) (PDF, 19 pages, 908 KB)
- CMD 21-H2.31A – Presentation from the Métis Nation-Saskatchewan (PDF, 9 pages, 1.38 MB)
- CMD 21-H2.32A – Supplementary submission from the Ya’thi Néné Land and Resource Office (PDF, 14 pages, 675 KB)
- CMD 21-H2.32B – Presentation from the Ya’thi Néné Land and Resource Office (PDF, 16 pages, 1.85 MB)
- Published on March 30, 2021
-
Published on March 23, 2021
- CMD 21-H2.2 – Submission from Rick Robillard (PDF, 5 pages, 1.6 MB)
- CMD 21-H2.3 – Submission from Fond du Lac First Nations (PDF, 4 pages, 613 KB)
- CMD 21-H2.4 – Submission from the Mining Association of Canada (PDF, 4 pages, 385 KB)
- CMD 21-H2.5 – Submission from the Saskatoon Regional Economic Development Authority (PDF, 4 pages, 645 KB)
- CMD 21-H2.6 – Submission from the Saskatchewan Mining Association (PDF, 4 pages, 252 KB)
- CMD 21-H2.7 – Submission from the Northern Village of Ile a la Crosse (PDF, 4 pages, 130 KB)
- CMD 21-H2.8 – Submission from the Northern Settlement of Uranium City (PDF, 4 pages, 355 KB)
- CMD 21-H2.9 – Submission from Kitsaki Management Limited Partnership (PDF, 5 pages, 292 KB)
- CMD 21-H2.10 – Submission from Orano Canada Inc. (PDF, 5 pages, 205 KB)
- CMD 21-H2.11 – Submission from the Canada-India Business Council (PDF, 4 pages, 304 KB)
- CMD 21-H2.12 – Submission from the Lac La Ronge Indian Band (PDF, 4 pages, 380 KB)
- CMD 21-H2.13 – Submission from Taryn Roske (PDF, 4 pages, 214 KB)
- CMD 21-H2.14 – Submission from Rose Tsannie (PDF, 3 pages, 395 KB)
- CMD 21-H2.15 – Submission from Athabasca Basin Development (PDF, 4 pages, 330 KB)
- CMD 21-H2.16 – Submission from the Saskatchewan Chamber of Commerce (PDF, 4 pages, 157 KB)
- CMD 21-H2.17 – Submission from the Canada China Business Council (PDF, 3 pages, 206 KB)
- CMD 21-H2.18 – Submission from the Athabasca Joint Engagement and Environmental Subcommittee (PDF, 5 pages, 215 KB)
- CMD 21-H2.19 – Submission from the Kineepik Métis Local (PDF, 4 pages, 1.05 MB)
- CMD 21-H2.20 – Submission from the Northern Village of Beauval (PDF, 3 pages, 225 KB)
- CMD 21-H2.21 – Submission from Ken Coates (PDF, 4 pages, 364 KB)
- CMD 21-H2.22 – Submission from the Greater Saskatoon Chamber of Commerce (PDF, 4 pages, 404 KB)
- CMD 21-H2.23 – Submission from the Canadian Nuclear Workers’ Council (PDF, 8 pages, 692 KB)
- CMD 21-H2.24 – Submission from the North Saskatoon Business Association (PDF, 4 pages, 664 KB)
- CMD 21-H2.25 – Submission from PBN Construction (PDF, 3 pages, 195 KB)
- CMD 21-H2.26 – Submission from United Steelworkers, District 3 (PDF, 4 pages, 229 KB)
- CMD 21-H2.27 – Submission from the Canadian Nuclear Association (PDF, 5 pages, 728 KB)
- CMD 21-H2.28 – Submission from the Northern Saskatchewan Environmental Quality Committee (PDF, 4 pages, 453 KB)
- CMD 21-H2.29 – Submission from English River First Nation (PDF, 18 pages, 900 KB)
- CMD 21-H2.30 – Submission from Des Nedhe Group (PDF, 4 pages, 238 KB)
-
Published on February 5, 2021
- CMD 21-H2 – Submission from CNSC staff on the application by Cameco Corporation for the renewal of the licence for Cigar Lake Operation (PDF, 265 pages, 8.01 MB)
- CMD 21-H2.1 – Submission from Cameco Corporation on its application for the renewal of the licence for Cigar Lake Operation (PDF, 54 pages, 576 KB)
March 2021 hearing in writing – Ontario Power Generation Inc – Pickering Nuclear Generation Station
Request from Ontario Power Generation Inc. to modify the Pickering Nuclear Generating Station integrated implementation plan (Revision 1)
March 2021 hearing in writing – Ontario Power Generation Inc – Pickering Nuclear Generation Station
- Published on March 30, 2021
- Published on January 13, 2021
- Published on December 22, 2020
-
Published on December 4, 2020
- CMD 20-H110.2 – Submission from Ontario Power Generation Inc. on proposed changes to OPG’s integrated implementation plan for the Pickering Nuclear Generating Station (PDF, 4 pages, 286 KB)
- CMD 20-H110.3 – Submission from Ontario Power Generation Inc. on proposed changes to OPG’s integrated implementation plan for the Pickering Nuclear Generating Station (PDF, 4 pages, 277 KB)
-
Published on November 27, 2020
- CMD 20-H110 – Submission from CNSC Staff on proposed changes to OPG’s integrated implementation plan for the Pickering Nuclear Generating Station (PDF, 23 pages, 310 KB)
- CMD 20-H110.1 – Submission from Ontario Power Generation Inc. on proposed changes to OPG’s integrated implementation plan for the Pickering Nuclear Generating Station (PDF, 23 pages, 642 KB)
March 2021 hearing in writing – Cameco Corporation – Rabbit Lake
Application from Cameco Corporation to consider an application from Cameco Corporation requesting the Commission’s acceptance of its revised financial guarantee for the Rabbit Lake Operation and amendments to the licence
March 2021 hearing in writing – Cameco Corporation – Rabbit Lake
- Published on December 22, 2020
-
Published on November 23, 2020
- CMD 20-H107 – Submission from CNSC Staff to consider an application from Cameco Corporation requesting the Commission’s acceptance of its revised financial guarantee for the Rabbit Lake Operation and amendments to the licence (PDF, 104 pages, 2.42 MB)
- CMD 20-H107.1 – Submission from Cameco Corporation to consider an application from Cameco Corporation requesting the Commission’s acceptance of its revised financial guarantee for the Rabbit Lake Operation and amendments to the licence (PDF, 2 pages, 336 KB)
November 25-26, 2020 Public hearing
Application from Canadian Nuclear Laboratories Ltd (CNL) to amend its waste facility decommissioning licence for the Douglas Point Waste Facility
- Download all documents for the November 25-26, 2020 public hearing - Part 1 (ZIP, 31 MB)
- Download all documents for the November 25-26, 2020 public hearing - Part 2 (ZIP, 65 MB)
November 25-26, 2020 Public hearing
-
Published on November 19, 2020
- CMD 20-H4.A – Presentation from CNSC staff (PDF, 89 pages, 2.22 MB)
- CMD 20-H4.1B – Presentation from CNL (PDF, 60 pages, 7.09 MB)
- CMD 20-H4.10A – Presentation from the Town of Saugeen Shores (PDF, 7 pages, 533 KB)
- CMD 20-H4.14A – Presentation from the Canadian Nuclear Workers’ Council (PDF, 15 pages, 672 KB)
- CMD 20-H4.17A – Presentation from the Canadian Environmental Law Association, Concerned Citizens of Renfrew County and Area, Nuclear Waste Watch, and Northwatch (PDF, 19 pages, 397 KB)
- CMD 20-H4.19A – Presentation from Sandy Greer (PDF, 12 pages, 799 KB)
- CMD 20-H4.22A – Presentation from Anna Tilman (PDF, 20 pages, 1.36 MB)
- Published on November 2, 2020
-
Published on October 28, 2020
- CMD 20-H4.2 – Submission from the Canadian Nuclear Society (PDF, 4 pages, 1.92 MB)
- CMD 20-H4.3 – Submission from Labourers' International Union of North America (PDF, 5 pages, 329 KB)
- CMD 20-H4.4 – Submission from the Canadian Nuclear Association (PDF, 4 pages, 600 KB)
- CMD 20-H4.5 – Submission from Benoit Robert Poulet (PDF, 9 pages, 473 KB)
- CMD 20-H4.6 – Submission from the Métis Nation of Ontario (PDF, 10 pages, 363 KB)
- CMD 20-H4.7 – Submission from the Organization of Canadian Nuclear Industries (PDF, 4 pages, 318 KB)
- CMD 20-H4.8 – Submission from the Ontario Association of Demolition Contractors (PDF, 4 pages, 461 KB)
- CMD 20-H4.9 – Submission from Ontario Power Generation (PDF, 4 pages, 474 KB)
- CMD 20-H4.10 – Submission from the Town of Saugeen Shores (PDF, 4 pages, 447 KB)
- CMD 20-H4.11 – Submission from the Historic Saugeen Métis (PDF, 30 pages, 657 KB)
- CMD 20-H4.12 – Submission from the Saugeen Ojibway Nation (PDF, 37 pages, 2.56 MB)
- CMD 20-H4.13 – Submission from the Bruce County (PDF, 3 pages, 223 KB)
- CMD 20-H4.14 – Submission from the Canadian Nuclear Workers’ Council (PDF, 5 pages, 732 KB)
- CMD 20-H4.15 – Submission from the Provincial Building and Construction Trades Council of Ontario (PDF, 3 pages, 295 KB)
- CMD 20-H4.16 – Submission from the Municipality of Kincardine (PDF, 10 pages, 543 KB)
- CMD 20-H4.17 – Submission from the Canadian Environmental Law Association, Concerned Citizens of Renfrew County and Area, Nuclear Waste Watch, and Northwatch (PDF, 76 pages, 1.28 MB)
- CMD 20-H4.18 – Submission from the Concerned Citizens of Renfrew County and Area (PDF, 10 pages, 748 KB)
- CMD 20-H4.19 – Submission from Sandy Greer (PDF, 12 pages, 917 KB)
- CMD 20-H4.20 – Submission from Northwatch (PDF, 15 pages, 469 KB)
- CMD 20-H4.21 – Submission from Evelyn Gigantes (PDF, 9 pages, 707 KB)
- Published on October 16, 2020
-
Published on September 11, 2020
- CMD 20-H4 – Submission from CNSC Staff on the application by CNL to amend its waste facility decommissioning licence for the Douglas Point Waste Facility (PDF, 183 pages, 64.95 MB)
- CMD 20-H4.1 – Submission from CNL on their application to amend its waste facility decommissioning licence for the Douglas Point Waste Facility (PDF, 87 pages, 3.17 MB)
October 2020 hearing in writing – SRB Technologies (Canada) Inc.
Application from SRB Technologies (Canada) Inc. requesting acceptance of a revised preliminary decommissioning plan and a revised financial guarantee for the SRBT tritium processing facility in Pembroke, Ontario
October 2020 hearing in writing – SRB Technologies (Canada) Inc.
- Published on October 13, 2020
-
Published on September 9, 2020
- CMD 20-H105 – Submission from CNSC Staff to consider an application from SRB Technologies (Canada) Inc. (SRBT) requesting acceptance of a revised preliminary decommissioning plan and a revised financial guarantee for the SRBT tritium processing facility in Pembroke, Ontario (PDF, 22 pages, 596 KB)
- CMD 20-H105.1 – Submission from SRB Technologies (Canada) Inc. (SRBT) requesting acceptance of a revised preliminary decommissioning plan and a revised financial guarantee for the SRBT tritium processing facility in Pembroke, Ontario (PDF, 5 pages, 4.71 MB)
October 2020 hearing in writing – Cameco Corporation – Cigar Lake
Application from Cameco Corporation to consider an application requesting the Commission’s acceptance of its revised financial guarantee for the Cigar Lake Operation and amendments to the licence.
October 2020 hearing in writing – Cameco Corporation – Cigar Lake
-
Published on August 27, 2020
- CMD 20-H108 – Submission from CNSC Staff (corrected version) to consider an application from Cameco Corporation requesting the Commission’s acceptance of its revised financial guarantee for the Cigar Lake Operation and amendments to the licence (PDF, 167 pages, 3.17 MB)
- CMD 20-H108.1 – Submission from Cameco Corporation to consider an application from Cameco Corporation requesting the Commission’s acceptance of its revised financial guarantee for the Cigar Lake Operation and amendments to the licence (PDF, 2 pages, 120 KB)
June 2020 hearings in writing
Decision on the proposed scope of factors to be considered in the conduct of an environmental assessment (EA) for a project proposed by Global First Power (GFP)
Application from Cameco Corporation requesting Commission acceptance of its revised financial guarantee for the Key Lake Operation
June 2020 hearings in writing
-
Published on June 24, 2020
- CMD 20-H102.40 – Submission from CARN and PHCHCC on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 259 KB)
- CMD 20-H102.6A – Supplementary submission from CELA and Dr. M.V. Ramana on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 311 KB)
- CMD 20-H102.7A – Supplementary submission from Kebaowek First Nation on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 253 KB)
- CMD 20-H106.1 – Submission from Ontario Power Generation Inc. on the request for a temporary exemption from subsection 9(4) of the Class I Nuclear Facilities Regulations (PDF, 3 pages, 209 KB)
-
Published on June 23, 2020
- CMD 20-H106 – Submission from CNSC Staff on the recommendation for a temporary exemption from subsection 9(4) of the Class I Nuclear Facilities Regulation (PDF, 18 pages, 646 KB)
- CMD 20-H106.2 – Submission from New Brunswick Power on the request for a temporary exemption from subsection 9(4) of the Class I Nuclear Facilities Regulations (PDF, 3 pages, 99 KB)
- CMD 20-H106.3 – Submission from Bruce Power on the request for a temporary exemption from subsection 9(4) of the Class I Nuclear Facilities Regulations (PDF, 2 pages, 526 KB)
- Published on June 18, 2020
-
Published on June 3, 2020
- CMD 20-H102.37 – Submission from Gordon Edwards on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 5 pages, 192 KB)
- CMD 20-H102.38 – Submission from Gordon McDowell on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 123 KB)
- CMD 20-H102.39 – Submission from Generation Atomic on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 139 KB)
-
Published on June 2, 2020
- CMD 20-H102.2 – Submission from New Brunswick Power on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 182 KB)
- CMD 20-H102.3 – Submission from Evelyn Gigantes on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 13 pages, 587 KB)
- CMD 20-H102.4 – Submission from David Winfield on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 24 pages, 959 KB)
- CMD 20-H102.5 – Submission from the Algonquins of Ontario on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 165 pages, 2.19 MB)
- CMD 20-H102.6 – Submission from the Canadian Environmental Law Association and Dr. M.V. Ramana on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 32 pages, 472 KB)
- CMD 20-H102.7 – Submission from the Kebaowek First Nation on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 19 pages, 1.1 MB)
- CMD 20-H102.8 – Submission from the Algonquins of Pikwakanagan First Nation on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 13 pages, 673 KB)
- CMD 20-H102.9 – Submission from Organization of Canadian Nuclear Industries on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 167 KB)
- CMD 20-H102.10 – Submission from AECOM Canada Ltd. on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 139 KB)
- CMD 20-H102.11 – Submission from Kaitlan Cavanaugh on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 112 KB)
- CMD 20-H102.12 – Submission from the Canadian Nuclear Association on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 186 KB)
- CMD 20-H102.13 – Submission from the Canadian Nuclear Laboratories on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 178 KB)
- CMD 20-H102.14 – Submission from PCL Industrial Constructors Inc. on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 1.12 MB)
- CMD 20-H102.15 – Submission from the Alberta Nuclear Nucleus Ltd. on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 403 KB)
- CMD 20-H102.16 – Submission from County Sustainability Group on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 186 KB)
- CMD 20-H102.17 – Submission from Donna Mendelsohn on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 192 KB)
- CMD 20-H102.18 – Submission from Todd De Rick on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 88 KB)
- CMD 20-H102.19 – Submission from Atomic Energy of Canada Limited on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 209 KB)
- CMD 20-H102.20 – Submission from Women in Nuclear Canada on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 207 KB)
- CMD 20-H102.21 – Submission from Algonguin Eco Watch on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 188 KB)
- CMD 20-H102.22 – Submission from the Canadian Association of Physicians for the Environment on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 7 pages, 232 KB)
- CMD 20-H102.23 – Submission from the Canadian Nuclear Workers Council on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 197 KB)
- CMD 20-H102.24 – Submission from the Council of Canadians, Saint John Chapter on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 215 KB)
- CMD 20-H102.25 – Submission from the Old Fort William Cottagers’ Association on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 124 KB)
- CMD 20-H102.26 – Submission from Terrestrial Energy Inc. on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 202 KB)
- CMD 20-H102.27 – Submission from the Concerned Citizens of Renfrew County and Area on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 658 KB)
- CMD 20-H102.28 – Submission from the Coalition for Responsible Energy Development in New Brunswick on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 135 KB)
- CMD 20-H102.29 – Submission from North American Young Generation in Nuclear on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 6 pages, 241 KB)
- CMD 20-H102.30 – Submission from Doctors for Nuclear Energy on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 3 pages, 103 KB)
- CMD 20-H102.31 – Submission from Nuclear Waste Watch on behalf of 22 public interest and community groups on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 694 KB)
- CMD 20-H102.32 – Submission from Environment North on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 161 KB)
- CMD 20-H102.33 – Submission from Northwatch on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 15 pages, 986 KB)
- CMD 20-H102.34 – Submission from Molly Lawson Mulloy on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 4 pages, 232 KB)
- CMD 20-H102.35 – Submission from Anna Gent on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 2 pages, 100 KB)
- CMD 20-H102.36 – Submission from National Council of Women Canada on the proposed scope of factors in the EA for the project proposed by Global First Power (PDF, 7 pages, 547 KB)
-
Published on April 29, 2020
- CMD 20-H102 – Submission from CNSC Staff on the proposed scope of factors to be considered in the conduct of an environmental assessment (EA) for a project proposed by Global First Power (GFP) (PDF, 35 pages, 0.99 MB)
- CMD 20-H102.1 – Submission from Ken Chaplin on the proposed scope of factors in the EA for a project proposed by GFP (PDF, 5 pages, 195 KB)
-
Published on April 27, 2020
- CMD 20-H101.1 – Submission from Cameco Corporation on their application for acceptance of the revised financial guarantee for the Key Lake Operation (PDF, 4 pages, 423 KB)
- CMD 20-H101 – Submission from CNSC Staff on the application by Cameco Corporation for acceptance of the revised financial guarantee for the Key Lake Operation (PDF, 105 pages, 2.81 MB)
April 2020 hearing in writing
Applications from Ontario Power Generation, New Brunswick Power Corporation and Bruce Power to amend their nuclear power reactor operating licences – REGDOC-2.3.3
April 2020 hearing in writing
-
Published on April 21, 2020
- CMD 20-H103 – Submission from CNSC Staff to consider the application from NB Power, in respect of an exemption from licensing requirement for the Point Lepreau Generating Station (PDF, 18 pages, 301 KB)
- CMD 20-H103.1 – Submission from NB Power to consider the application for an exemption from licensing requirement for the Point Lepreau Generating Station (PDF, 6 pages, 5.2 MB)
-
Published on April 2, 2020
- CMD 20-H100 – Submission from CNSC Staff on the applications from Ontario Power Generation, New Brunswick Power Corporation and Bruce Power to amend their nuclear power reactor operating licences - REGDOC-2.2.3 (PDF, 55 pages, 2.83 MB)
- CMD 20-H100.1 – Submission from Ontario Power Generation (Darlington) to amend their nuclear power reactor operating licence - REGDOC-2.2.3 (PDF, 9 pages, 488 KB)
- CMD 20-H100.2 – Submission from New Brunswick Power Corporation to amend their nuclear power reactor operating licence - REGDOC-2.2.3 (PDF, 4 pages, 202 KB)
- CMD 20-H100.3 – Submission from Bruce Power to amend their nuclear power reactor operating licence - REGDOC-2.2.3 (PDF, 10 pages, 303 KB)
- CMD 20-H100.4 – Submission from Ontario Power Generation (Pickering) to amend their nuclear power reactor operating licence - REGDOC-2.2.3 (PDF, 8 pages, 628 KB)
March 2-6, 2020 public hearing
Application by BWXT Nuclear Energy Canada Inc. to renew the licence for the Toronto and Peterborough Facilities.
- Download all documents for the March 2-6, 2020 public hearing - Part 1 (ZIP, 69 MB)
- Download all documents for the March 2-6, 2020 public hearing - Part 2 (ZIP, 69 MB)
- Download all documents for the March 2-6, 2020 public hearing - Part 3 (ZIP, 41 MB)
March 2-6, 2020 public hearing
- Published on December 21, 2020
- Published on November 2, 2020
- Published on February 24, 2020
-
Published on February 20, 2020
- CMD 20-H2.75A – Supplementary submission from Steve Daniels (PDF, 3 pages, 116 KB)
- CMD 20-H2.75B – Presentation from Steve Daniels (PDF, 16 pages, 1.64 MB)
- CMD 20-H2.121A – Presentation from Peter Harris (PDF, 19 pages, 1.56 MB)
- CMD 20-H2.247A – Presentation from Catherine Prinsen (PDF, 21 pages, 296 KB)
- CMD 20-H2.133B – Supplementary submission from Philip Kienholz (PDF, 24 pages, 438 KB)
- CMD 20-H2.245B – Supplementary submission from Citizens Against Radioactive Neighbourhoods (PDF, 21 pages, 2.52 MB)
- CMD 20-H2.223B – Presentation from Zahir Topan (PDF, 6 pages, 154 KB)
-
Published on February 19, 2020
- CMD 20-H2.36A – Presentation from Organization of Canadian Nuclear Industries (PDF, 12 pages, 1.35 MB)
- CMD 20-H2.104A – Revised written submission from Canadian Association of Physicians for the Environment (PDF, 8 pages, 157 KB)
- CMD 20-H2.120A – Presentation from Dana Jordan (PDF, 8 pages, 326 KB)
- CMD 20-H2.117A – Presentation from Jennifer Logan (PDF, 23 pages, 1.85 MB)
- CMD 20-H2.223A – Revised written submission from Zahir Topan (PDF, 4 pages, 209 KB)
- CMD 20-H2.33A – Revised presentation from Safety Probe International (PDF, 24 pages, 258 KB)
- CMD 20-H2.42A – Presentation from Canadian Nuclear Workers' Council (PDF, 25 pages, 476 KB)
- CMD 20-H2.134A – Revised presentation from the Port Hope Community Health Concerns Committee (PDF, 28 pages, 2.55 MB)
- CMD 20-H2.61A – Presentation from Corinne Mintz (PDF, 15 pages, 3.27 MB)
- CMD 20-H2.237A – Presentation from Anna Tilman (PDF, 20 pages, 265 KB)
- CMD 20-H2.92A – Supplementary written submission from North American Young Generation in Nuclear, Durham Chapter (PDF, 9 pages, 946 KB)
- CMD 20-H2.122A – Presentation from Justice, Peace and Integrity of Creation Office of the Sisters of St. Vincent de Paul (PDF, 14 pages, 1.41 MB)
- CMD 20-H2.205A – Revised submission from David Berger (PDF, 4 pages, 146 KB)
- CMD 20-H2.105A – Présentation de Julia Tuer (PDF, 18 pages, 3.87 MB)
- CMD 20-H2.244A – Presentation from Julian Aherne (PDF, 8 pages, 556 KB)
- CMD 20-H2.167A – Revised submission from Adam Prinsen, Laura Anderson, Wei Wei Han and Brenna Steels (PDF, 19 pages, 319 KB)
- CMD 20-H2.167B – Presentation from Adam Prinsen, Laura Anderson, Wei Wei Han and Brenna Steels (PDF, 22 pages, 508 KB)
- CMD 20-H2.66A – Presentation from Erica Martin (PDF, 20 pages, 1.14 MB)
- CMD 20-H2.173A – Supplementary submission from Janet McNeill (PDF, 17 pages, 576 KB)
- CMD 20-H2.184A – Revised submission from Trista Gilbert (PDF, 11 pages, 183 KB)
- CMD 20-H2.79A – Revised submission from Eleanor Underwood (PDF, 13 pages, 309 KB)
- CMD 20-H2.109A – Presentation from Kathryn Campbell (PDF, 6 pages, 2.22 MB)
- CMD 20-H2.245A – Presentation from Citizens Against Radioactive Neighbourhoods (PDF, 18 pages, 741 KB)
- CMD 20-H2.144A – Supplementary submission from Janice Keil (PDF, 16 pages, 259 KB)
- CMD 20-H2.138A – Revised submission from Ruth Bishop (PDF, 5 pages, 159 KB)
- CMD 20-H2.138B – Presentation from Ruth Bishop (PDF, 18 pages, 543 KB)
- Published on February 5, 2020
-
Published on February 4, 2020
- CMD 20-H2.245 – Submission from Citizens Against Radioactive Neighbourhoods (CARN) (PDF, 66 pages, 3.52 MB)
- CMD 20-H2.246 – Submission from Jane Scott (PDF, 16 pages, 1.81 MB)
- CMD 20-H2.247 – Submission from Catherine Prinsen (PDF, 24 pages, 508 KB)
- CMD 20-H2.248 – Submission from Catherine Prinsen and 36 other interested persons (PDF, 7 pages, 229 KB)
- CMD 20-H2.133A – Supplementary written submission from Philip Kienholz (PDF, 8 pages, 1.79 MB)
-
Published on February 3, 2020
- CMD 20-H2.2 – Submission from Caroline Tennent (PDF, 4 pages, 159 KB)
- CMD 20-H2.3 – Submission from Don and Heather Ross (PDF, 4 pages, 236 KB)
- CMD 20-H2.4 – Submission from Barbara Russell (PDF, 4 pages, 148 KB)
- CMD 20-H2.5 – Submission from Layne and Gail Lewis (PDF, 3 pages, 147 KB)
- CMD 20-H2.6 – Submission from Devon Code (PDF, 4 pages, 165 KB)
- CMD 20-H2.7 – Submission from the Canadian Nuclear Isotope Council (PDF, 4 pages, 456 KB)
- CMD 20-H2.8 – Submission from C. & T. Tool & Machine Inc. (PDF, 3 pages, 130 KB)
- CMD 20-H2.9 – Submission from Laurie Westaway (PDF, 5 pages, 207 KB)
- CMD 20-H2.10 – Submission from the CANDU Owners Group (PDF, 5 pages, 1.48 MB)
- CMD 20-H2.11 – Submission from Nicolas Martin-Burtart (PDF, 4 pages, 253 KB)
- CMD 20-H2.12 – Submission from Anne Elliott (PDF, 3 pages, 165 KB)
- CMD 20-H2.13 – Submission from George Fogarasi (PDF, 5 pages, 177 KB)
- CMD 20-H2.14 – Submission from Jennifer Kazda (PDF, 4 pages, 176 KB)
- CMD 20-H2.15 – Submission from Robert Paehlke (PDF, 4 pages, 191 KB)
- CMD 20-H2.16 – Submission from Lisa Wood (PDF, 5 pages, 205 KB)
- CMD 20-H2.17 – Submission from Dan Rudka (PDF, 7 pages, 331 KB)
- CMD 20-H2.18 – Submission from Karin DesChamp (PDF, 3 pages, 135 KB)
- CMD 20-H2.19 – Submission from Emily Straka (PDF, 12 pages, 437 KB)
- CMD 20-H2.20 – Submission from Bruce Power (PDF, 4 pages, 798 KB)
- CMD 20-H2.21 – Submission from Adam Vicente (PDF, 3 pages, 148 KB)
- CMD 20-H2.22 – Submission from Aimee Ng (PDF, 3 pages, 184 KB)
- CMD 20-H2.23 – Submission from Hannah Conover-Arthurs (PDF, 4 pages, 193 KB)
- CMD 20-H2.24 – Submission from Helen Burnaby (PDF, 4 pages, 113 KB)
- CMD 20-H2.25 – Submission from Miriam Davidson and Marlowe Bork (PDF, 4 pages, 174 KB)
- CMD 20-H2.26 – Submission from Ashlynn Foster (PDF, 3 pages, 417 KB)
- CMD 20-H2.27 – Submission from Murali Ganapathy (PDF, 8 pages, 671 KB)
- CMD 20-H2.28 – Submission from Gordon and Claudea Usher (PDF, 3 pages, 150 KB)
- CMD 20-H2.29 – Submission from Jenny Carter (PDF, 11 pages, 147 KB)
- CMD 20-H2.30 – Submission from Sheila Collett (PDF, 6 pages, 140 KB)
- CMD 20-H2.31 – Submission from Gavin Winter (PDF, 3 pages, 148 KB)
- CMD 20-H2.32 – Submission from Melanie Buddle (PDF, 5 pages, 525 KB)
- CMD 20-H2.33 – Submission from Safety Probe International (PDF, 22 pages, 517 KB)
- CMD 20-H2.34 – Submission from Jennifer Guerin (PDF, 3 pages, 146 KB)
- CMD 20-H2.35 – Submission from Ontario Power Generation (PDF, 4 pages, 280 KB)
- CMD 20-H2.36 – Submission from Organization of Canadian Nuclear Industries (PDF, 3 pages, 176 KB)
- CMD 20-H2.37 – Submission from Philip McMichael (PDF, 3 pages, 199 KB)
- CMD 20-H2.38 – Submission from Adam Baker (PDF, 4 pages, 162 KB)
- CMD 20-H2.39 – Submission from Ruth Pezzack (PDF, 3 pages, 537 KB)
- CMD 20-H2.40 – Submission from Kate Haines (PDF, 5 pages, 319 KB)
- CMD 20-H2.41 – Submission from Leslie McGrath (PDF, 10 pages, 555 KB)
- CMD 20-H2.42 – Submission from Canadian Nuclear Workers’ Council (PDF, 10 pages, 592 KB)
- CMD 20-H2.43 – Submission from Timothy Holland (PDF, 3 pages, 118 KB)
- CMD 20-H2.44 – Submission from Anna Tennent-Riddell (PDF, 4 pages, 435 KB)
- CMD 20-H2.45 – Submission from Arthur Blomme (PDF, 4 pages, 514 KB)
- CMD 20-H2.46 – Submission from Cynthia Conner (PDF, 3 pages, 162 KB)
- CMD 20-H2.47 – Submission from Kathy Dunne (PDF, 7 pages, 266 KB)
- CMD 20-H2.48 – Submission from Jacqueline Wright (PDF, 3 pages, 163 KB)
- CMD 20-H2.49 – Submission from Joshua Benjamin Marston (PDF, 6 pages, 149 KB)
- CMD 20-H2.50 – Submission from Lara Elizabeth George (PDF, 8 pages, 192 KB)
- CMD 20-H2.51 – Submission from Jim Dufresne (PDF, 7 pages, 542 KB)
- CMD 20-H2.52 – Submission from Gwen Stevens (PDF, 3 pages, 272 KB)
- CMD 20-H2.53 – Submission from Mary Garvey (PDF, 3 pages, 246 KB)
- CMD 20-H2.54 – Submission from Sarah Thomson (PDF, 39 pages, 431 KB)
- CMD 20-H2.55 – Submission from David Fernandes (PDF, 4 pages, 444 KB)
- CMD 20-H2.56 – Submission from Corina McCoy (PDF, 3 pages, 188 KB)
- CMD 20-H2.57 – Submission from Bill Templeman (PDF, 8 pages, 276 KB)
- CMD 20-H2.58 – Submission from Lainey Bates (PDF, 5 pages, 398 KB)
- CMD 20-H2.59 – Submission from Jonathan Campbell (PDF, 3 pages, 192 KB)
- CMD 20-H2.60 – Submission from Anna Eidt (PDF, 4 pages, 124 KB)
- CMD 20-H2.61 – Submission from Corinne Mintz (PDF, 7 pages, 464 KB)
- CMD 20-H2.62 – Submission from Karen Hjort-Jensen (PDF, 4 pages, 129 KB)
- CMD 20-H2.63 – Submission from Stanley Yoo (PDF, 3 pages, 95 KB)
- CMD 20-H2.64 – Submission from Drew Ginter (PDF, 4 pages, 194 KB)
- CMD 20-H2.65 – Submission from Janine Carter (PDF, 3 pages, 95 KB)
- CMD 20-H2.66 – Submission from Erica Martin (PDF, 8 pages, 565 KB)
- CMD 20-H2.67 – Submission from Birthe Jorgensen (PDF, 4 pages, 433 KB)
- CMD 20-H2.68 – Submission from Andres D’Imperio (PDF, 3 pages, 498 KB)
- CMD 20-H2.69 – Submission from Barton Feilders (PDF, 3 pages, 289 KB)
- CMD 20-H2.70 – Submission from Ursula Pflug (PDF, 4 pages, 679 KB)
- CMD 20-H2.71 – Submission from Olivia Kwan and Anthony Murray (PDF, 3 pages, 425 KB)
- CMD 20-H2.72 – Submission from Beverley Peever (PDF, 4 pages, 143 KB)
- CMD 20-H2.73 – Submission from Katrina Behr (PDF, 4 pages, 165 KB)
- CMD 20-H2.74 – Submission from Jessica Rowland (PDF, 4 pages, 112 KB)
- CMD 20-H2.75 – Submission from Steve Daniels (PDF, 4 pages, 504 KB)
- CMD 20-H2.76 – Submission from Matthew and Karlie Holtby (PDF, 4 pages, 1.87 MB)
- CMD 20-H2.77 – Submission from Janet Harris (PDF, 5 pages, 520 KB)
- CMD 20-H2.78 – Submission from Nika M (PDF, 3 pages, 500 KB)
- CMD 20-H2.79 – Submission from Eleanor Underwood (PDF, 7 pages, 393 KB)
- CMD 20-H2.80 – Submission from Kaia Martin (PDF, 5 pages, 598 KB)
- CMD 20-H2.81 – Submission from James Deutsch (PDF, 5 pages, 511 KB)
- CMD 20-H2.82 – Submission from Lara Griffin (PDF, 5 pages, 168 KB)
- CMD 20-H2.83 – Submission from Stacy Smith Barriault (PDF, 4 pages, 205 KB)
- CMD 20-H2.84 – Submission from Erin Parker (PDF, 3 pages, 430 KB)
- CMD 20-H2.85 – Submission from Angel Hamilton (PDF, 5 pages, 118 KB)
- CMD 20-H2.86 – Submission from Carolyn Ross (PDF, 3 pages, 105 KB)
- CMD 20-H2.87 – Submission from Julie Cosgrove (PDF, 8 pages, 315 KB)
- CMD 20-H2.88 – Submission from Andrew Griffin (PDF, 8 pages, 170 KB)
- CMD 20-H2.90 – Submission from Stu Morris (PDF, 5 pages, 223 KB)
- CMD 20-H2.91 – Submission from Sharon Fitzgerald (PDF, 3 pages, 142 KB)
- CMD 20-H2.92 – Submission from North American Young Generation in Nuclear, Durham Chapter (PDF, 5 pages, 686 KB)
- CMD 20-H2.93 – Submission from Erin Howley (PDF, 3 pages, 150 KB)
- CMD 20-H2.94 – Submission from Ava Richardson and Zenryu Owatari (PDF, 5 pages, 530 KB)
- CMD 20-H2.95 – Submission from Leanne Betasmosake Simpson (PDF, 6 pages, 177 KB)
- CMD 20-H2.96 – Submission from Peter Prinsen (PDF, 3 pages, 95 KB)
- CMD 20-H2.97 – Submission from Jonothan Fiddler (PDF, 3 pages, 536 KB)
- CMD 20-H2.98 – Submission from Claire Symington (PDF, 4 pages, 126 KB)
- CMD 20-H2.99 – Submission from Graham and Rachel Petty (PDF, 4 pages, 631 KB)
- CMD 20-H2.100 – Submission from John Climenhage (PDF, 4 pages, 225 KB)
- CMD 20-H2.101 – Submission from Curve First Lake Nation (PDF, 4 pages, 254 KB)
- CMD 20-H2.102 – Submission from Michael Phillips (PDF, 20 pages, 288 KB)
- CMD 20-H2.103 – Submission from Cathy Manias-Fiddler (PDF, 3 pages, 535 KB)
- CMD 20-H2.104 – Submission from the Canadian Association of Physicians for the Environment (PDF, 6 pages, 136 KB)
- CMD 20-H2.105 – Submission from Julia Tuer (PDF, 3 pages, 488 KB)
- CMD 20-H2.106 – Submission from Chris Risley (PDF, 4 pages, 395 KB)
- CMD 20-H2.107 – Submission from Katherine Orgill and Bruce Scott (PDF, 5 pages, 685 KB)
- CMD 20-H2.108 – Submission from Swim Drink Fish Canada/Lake Ontario Waterkeeper (PDF, 85 pages, 11.98 MB)
- CMD 20-H2.109 – Submission from Kathryn Campbell (PDF, 14 pages, 10.87 MB)
- CMD 20-H2.110 – Submission from Joanne O’Donoughue (PDF, 4 pages, 497 KB)
- CMD 20-H2.111 – Submission from Matt Snell (PDF, 3 pages, 204 KB)
- CMD 20-H2.112 – Submission from Adrienne Newman (PDF, 6 pages, 152 KB)
- CMD 20-H2.113 – Submission from Charlotte Kennedy (PDF, 5 pages, 350 KB)
- CMD 20-H2.114 – Submission from Jamie Chadwick (PDF, 5 pages, 323 KB)
- CMD 20-H2.115 – Submission from Roy Brady (PDF, 4 pages, 391 KB)
- CMD 20-H2.116 – Submission from Sue MacKay (PDF, 6 pages, 335 KB)
- CMD 20-H2.117 – Submission from Jennifer Logan (PDF, 5 pages, 185 KB)
- CMD 20-H2.118 – Submission from Canadian Nuclear Association (PDF, 5 pages, 713 KB)
- CMD 20-H2.119 – Submission from Alejandra Gonzalez Jiemenz (PDF, 3 pages, 119 KB)
- CMD 20-H2.120 – Submission from Dana Jordan (PDF, 5 pages, 336 KB)
- CMD 20-H2.121 – Submission from Peter Harris (PDF, 14 pages, 2.5 MB)
- CMD 20-H2.122 – Submission from Justice, Peace and Intergrity of Creation Office of the Sisters of St.Vincent de Paul (PDF, 3 pages, 326 KB)
- CMD 20-H2.123 – Submission from Ralf Pohlak (PDF, 4 pages, 119 KB)
- CMD 20-H2.124 – Submission from John Jared Irwin (PDF, 3 pages, 139 KB)
- CMD 20-H2.125 – Submission from Adrian Currie (PDF, 3 pages, 123 KB)
- CMD 20-H2.126 – Submission from Susan Cooper (PDF, 5 pages, 168 KB)
- CMD 20-H2.127 – Submission from Rosemary MacAdam (PDF, 3 pages, 133 KB)
- CMD 20-H2.128 – Submission from Rebecca Reeves (PDF, 3 pages, 127 KB)
- CMD 20-H2.129 – Submission from Danielle Tassie (PDF, 4 pages, 375 KB)
- CMD 20-H2.130 – Submission from Miriam Lyall (PDF, 3 pages, 154 KB)
- CMD 20-H2.131 – Submission from Timothy Wilson (PDF, 11 pages, 308 KB)
- CMD 20-H2.132 – Submission from the Rockcliffe-Smythe Community Association (PDF, 3 pages, 142 KB)
- CMD 20-H2.133 – Submission from Philip Kienholz (PDF, 21 pages, 3.71 MB)
- CMD 20-H2.134 – Submission from the Port Hope Community Health Concerns Committee (PDF, 26 pages, 7.27 MB)
- CMD 20-H2.135 – Submission from Stephanie Benn (PDF, 4 pages, 138 KB)
- CMD 20-H2.136 – Submission from Ann Jaeger (PDF, 4 pages, 140 KB)
- CMD 20-H2.137 – Submission from Dora Juhasz (PDF, 4 pages, 230 KB)
- CMD 20-H2.138 – Submission from Ruth Bishop (PDF, 4 pages, 150 KB)
- CMD 20-H2.139 – Submission from Peterborough Public Health (PDF, 4 pages, 1.32 MB)
- CMD 20-H2.140 – Submission from Ontario’s Nuclear Advantage (PDF, 4 pages, 175 KB)
- CMD 20-H2.141 – Submission from Robert Gibson (PDF, 5 pages, 322 KB)
- CMD 20-H2.142 – Submission from Margaret Smith (PDF, 6 pages, 456 KB)
- CMD 20-H2.143 – Submission from Women in Nuclear Canada (PDF, 5 pages, 193 KB)
- CMD 20-H2.144 – Submission from Janice Keil (PDF, 4 pages, 532 KB)
- CMD 20-H2.145 – Submission from Claudette Beaudoin (PDF, 3 pages, 514 KB)
- CMD 20-H2.146 – Submission from Jacinta McDonnell (PDF, 3 pages, 530 KB)
- CMD 20-H2.147 – Submission from Motion Canada (PDF, 3 pages, 473 KB)
- CMD 20-H2.148 – Submission from Arndt Kruger (PDF, 3 pages, 529 KB)
- CMD 20-H2.149 – Submission from John Marris (PDF, 4 pages, 142 KB)
- CMD 20-H2.150 – Submission from Andrew Philip Jobes and Sarah Jean Crane (PDF, 4 pages, 228 KB)
- CMD 20-H2.151 – Submission from Rosemary Frei (PDF, 3 pages, 523 KB)
- CMD 20-H2.152 – Submission from Ken Brown (PDF, 5 pages, 120 KB)
- CMD 20-H2.153 – Submission from Anna Petry (PDF, 3 pages, 312 KB)
- CMD 20-H2.154 – Submission from the Ontario Clean Air Alliance (PDF, 6 pages, 224 KB)
- CMD 20-H2.155 – Submission from Robert Steinman (PDF, 5 pages, 159 KB)
- CMD 20-H2.156 – Submission from Sheila Nabigon-Howlett (PDF, 3 pages, 318 KB)
- CMD 20-H2.157 – Submission from Deirdre McGahern (PDF, 17 pages, 730 KB)
- CMD 20-H2.158 – Submission from Rachel Wortis Beda (PDF, 4 pages, 152 KB)
- CMD 20-H2.159 – Submission from Jacquelin Millar (PDF, 6 pages, 543 KB)
- CMD 20-H2.160 – Submission from James Wilkes (PDF, 4 pages, 130 KB)
- CMD 20-H2.161 – Submission from Anne White (PDF, 4 pages, 141 KB)
- CMD 20-H2.162 – Submission from Pete Hewett (PDF, 3 pages, 142 KB)
- CMD 20-H2.163 – Submission from Kendra Couling (PDF, 7 pages, 259 KB)
- CMD 20-H2.164 – Submission from Hiroshima-Nagasaki Day Coalition (PDF, 5 pages, 253 KB)
- CMD 20-H2.165 – Submission from Doug Back (PDF, 3 pages, 131 KB)
- CMD 20-H2.166 – Submission from Zach Ruiter (PDF, 3 pages, 132 KB)
- CMD 20-H2.167 – Submission from Adam Prinsen, Laura Anderson, Wei Wei Han and Brenna Steeles (PDF, 17 pages, 325 KB)
- CMD 20-H2.168 – Submission from Julie Dzerowicz, MP, Davenport (PDF, 3 pages, 307 KB)
- CMD 20-H2.169 – Submission from Chris Muir (PDF, 7 pages, 230 KB)
- CMD 20-H2.170 – Submission from Maggie Robertson (PDF, 3 pages, 141 KB)
- CMD 20-H2.171 – Submission from Cathy Tafler (PDF, 3 pages, 122 KB)
- CMD 20-H2.172 – Submission from Lisa Campbell (PDF, 4 pages, 135 KB)
- CMD 20-H2.173 – Submission from Janet McNeill (PDF, 10 pages, 312 KB)
- CMD 20-H2.174 – Submission from Patricio Martinez (PDF, 3 pages, 145 KB)
- CMD 20-H2.175 – Submission from Jason Rogers (PDF, 3 pages, 139 KB)
- CMD 20-H2.176 – Submission from John D’Orsay (PDF, 6 pages, 157 KB)
- CMD 20-H2.177 – Submission from Angela Bird (PDF, 3 pages, 115 KB)
- CMD 20-H2.178 – Submission from Bree Beveridge (PDF, 4 pages, 146 KB)
- CMD 20-H2.179 – Submission from Colin Purcell (PDF, 3 pages, 202 KB)
- CMD 20-H2.180 – Submission from James Tuer (PDF, 4 pages, 156 KB)
- CMD 20-H2.181 – Submission from Indie Bennett (PDF, 3 pages, 147 KB)
- CMD 20-H2.182 – Submission from Corry Prinsen (PDF, 4 pages, 159 KB)
- CMD 20-H2.183 – Submission from Caroline(Cara) Peterman (PDF, 4 pages, 128 KB)
- CMD 20-H2.184 – Submission from Trista Gilbert (PDF, 9 pages, 256 KB)
- CMD 20-H2.185 – Submission from Steven do Vale (PDF, 3 pages, 117 KB)
- CMD 20-H2.186 – Submission from Jonathan Minkarious (PDF, 3 pages, 130 KB)
- CMD 20-H2.187 – Submission from Nick Lato (PDF, 3 pages, 119 KB)
- CMD 20-H2.188 – Submission from Janice Rosen (PDF, 7 pages, 184 KB)
- CMD 20-H2.189 – Submission from Markus Piro (PDF, 4 pages, 218 KB)
- CMD 20-H2.190 – Submission from Jamie Fligg (PDF, 4 pages, 160 KB)
- CMD 20-H2.191 – Submission from Marit Stiles, MPP, Davenport (PDF, 5 pages, 542 KB)
- CMD 20-H2.192 – Submission from John Gibb (PDF, 3 pages, 140 KB)
- CMD 20-H2.193 – Submission from Sandra Lindgreen (PDF, 3 pages, 127 KB)
- CMD 20-H2.194 – Submission from Barbara Chisholm (PDF, 3 pages, 143 KB)
- CMD 20-H2.195 – Submission from Joyce Hall (PDF, 3 pages, 131 KB)
- CMD 20-H2.196 – Submission from Marjorie Castro (PDF, 3 pages, 177 KB)
- CMD 20-H2.197 – Submission from Trevor Middel and Stephanie Melles (PDF, 6 pages, 522 KB)
- CMD 20-H2.198 – Submission from Tom Smarda (PDF, 4 pages, 138 KB)
- CMD 20-H2.199 – Submission from Julian Aherne, Gary Burness, James Connolly, Peter Lafleur, Erica Nol, Mark Parnis and Rachel Wortis (PDF, 5 pages, 258 KB)
- CMD 20-H2.200 – Submission from Laurie Pezzack (PDF, 4 pages, 136 KB)
- CMD 20-H2.201 – Submission from Sarah Vandenberg, Sabrina Hale, Jennifer Ross and Jessica Arsenault (PDF, 6 pages, 614 KB)
- CMD 20-H2.202 – Submission from Thomas Miller (PDF, 3 pages, 562 KB)
- CMD 20-H2.203 – Submission from Chaitanya Kalevar (PDF, 10 pages, 972 KB)
- CMD 20-H2.204 – Submission from George Campana (PDF, 3 pages, 132 KB)
- CMD 20-H2.205 – Submission from David Berger (PDF, 4 pages, 139 KB)
- CMD 20-H2.206 – Submission from Priscilla Medeiros (PDF, 3 pages, 304 KB)
- CMD 20-H2.207 – Submission from Lana Kouchnir (PDF, 4 pages, 391 KB)
- CMD 20-H2.208 – Submission from Megan Vincett (PDF, 4 pages, 159 KB)
- CMD 20-H2.209 – Submission from Mary Elizabeth Konrad (PDF, 4 pages, 212 KB)
- CMD 20-H2.210 – Submission from Wendy Fischer (PDF, 3 pages, 615 KB)
- CMD 20-H2.211 – Submission from Christiaan Beyers (PDF, 7 pages, 555 KB)
- CMD 20-H2.212 – Submission from Juliette Barriault (PDF, 3 pages, 304 KB)
- CMD 20-H2.213 – Submission from Everett Barriault (PDF, 3 pages, 301 KB)
- CMD 20-H2.214 – Submission from Jennifer Bowe (PDF, 4 pages, 200 KB)
- CMD 20-H2.215 – Submission from Ursula Medeiros (PDF, 3 pages, 265 KB)
- CMD 20-H2.216 – Submission from the Committee for Future Generations (PDF, 5 pages, 147 KB)
- CMD 20-H2.217 – Submission from Gordon and Caroline Langill (PDF, 3 pages, 146 KB)
- CMD 20-H2.218 – Submission from Bruce Harris (PDF, 4 pages, 155 KB)
- CMD 20-H2.219 – Submission from Sarah Mancini (PDF, 3 pages, 360 KB)
- CMD 20-H2.220 – Submission from Pete Woolidge (PDF, 6 pages, 115 KB)
- CMD 20-H2.221 – Submission from Jillian Hansen (PDF, 3 pages, 123 KB)
- CMD 20-H2.222 – Submission from Miles Johnston (PDF, 3 pages, 123 KB)
- CMD 20-H2.223 – Submission from Zahir Topan (PDF, 4 pages, 289 KB)
- CMD 20-H2.224 – Submission from Graeme Marrs (PDF, 3 pages, 412 KB)
- CMD 20-H2.225 – Submission from Kyle and Brad Blaney (PDF, 6 pages, 197 KB)
- CMD 20-H2.226 – Submission from Jennifer Kirkpatrick (PDF, 3 pages, 130 KB)
- CMD 20-H2.227 – Submission from Linda Patterson (PDF, 3 pages, 420 KB)
- CMD 20-H2.228 – Submission from Fred and Maggie Bakker (PDF, 3 pages, 535 KB)
- CMD 20-H2.229 – Submission from Rosanna Zerafa (PDF, 4 pages, 458 KB)
- CMD 20-H2.230 – Submission from Katherine Fee (PDF, 5 pages, 500 KB)
- CMD 20-H2.231 – Submission from Judy Dixon (PDF, 4 pages, 528 KB)
- CMD 20-H2.232 – Submission from Annie Gelfand (PDF, 4 pages, 581 KB)
- CMD 20-H2.233 – Submission from Susan Chiddix (PDF, 3 pages, 845 KB)
- CMD 20-H2.234 – Submission from Craig Niziolek (PDF, 4 pages, 597 KB)
- CMD 20-H2.235 – Submission from Laura Pauk (PDF, 4 pages, 785 KB)
- CMD 20-H2.236 – Submission from Riki Kretschmar (PDF, 4 pages, 707 KB)
- CMD 20-H2.237 – Submission from Anna Tilman (PDF, 23 pages, 756 KB)
- CMD 20-H2.238 – Submission from Christie Nash (PDF, 5 pages, 436 KB)
- CMD 20-H2.239 – Submission from Judy Stewart (PDF, 3 pages, 403 KB)
- CMD 20-H2.240 – Submission from Belinda Cole (PDF, 4 pages, 383 KB)
- CMD 20-H2.241 – Submission from Rob Mound (PDF, 4 pages, 137 KB)
- CMD 20-H2.242 – Submission from Melinda Rees (PDF, 12 pages, 259 KB)
- CMD 20-H2.243 – Submission from Kyoko Sato (PDF, 8 pages, 190 KB)
- CMD 20-H2.244 – Submission from Julian Aherne (PDF, 18 pages, 767 KB)
-
Published on December 20, 2019
- CMD 20-H2 – Submission from CNSC Staff on Application by BWXT Nuclear Energy Canada Inc. to renew the licence for the Toronto and Peterborough Facilities (PDF, 244 pages, 5.92 MB)
- CMD 20-H2.1 – Submission from BWXT Nuclear Energy Canada Inc. on application to renew the licence for the Toronto and Peterborough Facilities (PDF, 61 pages, 1.34 MB)
February 2020 Upcoming Commission Decision
NexGen Energy Ltd. Rook 1 Project – Request for Decision on Scope of an Environmental Assessment
February 2020 Upcoming Commission Decision
- Published on February 18, 2020
December 2019 hearing in writing
Denison Mines’ Wheeler River Project – Request for a Commission Decision on the Scope of an Environmental Assessment
December 2019 hearing in writing
- Published on December 13, 2019
- Published on December 5, 2019
October 2-3, 2019 public hearings
Cameco Corporation's application for the renewal of the licence for the Beaverlodge Project
Canadian Nuclear Laboratories Ltd.’s application for the renewal of the licence for the Whiteshell Laboratories
- Download documents for the October 2-3, 2019 public hearings - Part 1 (ZIP, 24 MB)
- Download documents for the October 2-3, 2019 public hearings - Part 2 (ZIP, 62 MB)
- Download documents for the October 2-3, 2019 public hearings - Part 3 (ZIP, 18 MB)
October 2-3, 2019 public hearings
- Published on November 4, 2019
- Published on October 24, 2019
- Published on October 15, 2019
- Published on October 2, 2019
-
Published on September 27, 2019
- CMD 19-H4.1B – Presentation from CNL on Whiteshell Laboratories (PDF, 51 pages, 5.18 MB)
- CMD 19-H4.12A – Supplementary submission from the Manitoba Métis Federation (PDF, 45 pages, 779 KB)
- CMD 19-H4.12B – Presentation from the Manitoba Métis Federation (PDF, 50 pages, 1.40 MB)
- CMD 19-H4.6A – Presentation from the Concerned Citizens of Renfrew County and Area (PDF, 15 pages, 587 KB)
- CMD 19-H4.4A – Presentation from Sagkeeng First Nation (PDF, 14 pages, 850 KB)
- CMD 19-H4.11A – Presentation from Northwatch (PDF, 13 pages, 1.14 MB)
- CMD 19-H4.5A – Presentation from the Canadian Environmental Law Association (PDF, 18 pages, 500 KB)
- CMD 19-H6.1A – Presentation from Cameco Corporation on Beaverlodge Project (PDF, 29 pages, 4.46 MB)
- CMD 19-H6.8A – Presentation from Ya'thi Néné Land and Resource Office (PDF, 9 pages, 408 KB)
-
Published on September 24, 2019
- CMD 19-H4.B – Supplementary submission from CNSC staff on CNL Whiteshell Laboratories (PDF, 78 pages, 1,422 KB)
- CMD 19-H4.C – Presentation from CNSC staff on CNL Whiteshell Laboratories (PDF, 57 pages, 2,088 KB)
- CMD 19-H6.A – Presentation from CNSC staff on Cameco Corporation's Beaverlodge Project (PDF, 69 pages, 3,296 KB)
-
Published on September 9, 2019
- CMD 19-H4.7 – Submission from Unions (PDF, 3 pages, 383 KB)
- CMD 19-H4.8 – Submission from the Local Government District of Pinawa (PDF, 4 pages, 648 KB)
- CMD 19-H4.9 – Submission from the Canadian Nuclear Society (PDF, 4 pages, 134 KB)
- CMD 19-H4.10 – Submission from North Forge East (PDF, 3 pages, 373 KB)
- CMD 19-H4.11 – Written submission from Northwatch (PDF, 54 pages, 2,828 KB)
- CMD 19-H4.12 – Submission from Manitoba Metis Federation (PDF, 5 pages, 1,610 KB)
- CMD 19-H6.11 – Submission from Métis Nation Saskatchewan (PDF, 3 pages, 744 KB)
-
Published on September 6, 2019
- CMD 19-H4.2 – Written submission from the Rural Municipality of Alexander (PDF, 3 pages, 1,096 KB)
- CMD 19-H4.3 – Written submission from the Whiteshell Laboratories Public Liaison Committee (PDF, 4 pages, 150 KB)
- CMD 19-H4.4 – Written submission from the Sagkeeng First Nation (PDF, 181 pages, 51,222 KB)
- CMD 19-H4.5 – Written submission from the Canadian Environmental Law Association (PDF, 24 pages, 531 KB)
- CMD 19-H4.6 – Written submission from the Concerned Citizens of Renfrew County and Area (PDF, 28 pages, 402 KB)
- CMD 19-H6.2 – Written submission from the Saskatchewan Mining Association (PDF, 4 pages, 270 KB)
- CMD 19-H6.3 – Written submission from Dean Classen (PDF, 3 pages, 134 KB)
- CMD 19-H6.4 – Written submission from Canada Eldor Inc. (PDF, 6 pages, 234 KB)
- CMD 19-H6.5 – Written submission from Orano Canada Inc. (PDF, 3 pages, 207 KB)
- CMD 19-H6.6 – Written submission from the Saskatchewan Environmental Society (PDF, 11 pages, 611 KB)
- CMD 19-H6.7 – Written submission from the Athabasca Joint Engagement and Environmental Subcommittee (PDF, 5 pages, 1,079 KB)
- CMD 19-H6.8 – Written submission from the Ya'thi Néné Land and Resource Office (PDF, 8 pages, 347 KB)
- CMD 19-H6.9 – Written submission from the Athabasca Chipewyan First Nation (PDF, 6 pages, 3,150 KB)
- CMD 19-H6.10 – Written submission from the Northern Saskatchewan Environmental Quality Committee (PDF, 4 pages, 176 KB)
-
Published on August 7, 2019
- CMD 19-H4 – Submission from CNSC staff on CNL's application for renewal of licence for Whiteshell Laboratories (PDF, 261 pages, 6,715 KB)
- CMD 19-H4.1 – Submission from CNL on their application for renewal of licence for Whiteshell Laboratories (PDF, 29 pages, 5,203 KB)
- CMD 19-H6 – Submission from CNSC staff on Cameco Corporation's application for the renewal of the licence for the Beaverlodge Project (PDF, 118 pages, 8,064 KB)
- CMD 19-H6.1 – Submission from Cameco Corporation on their application for renewal of the licence for the Beaverlodge Project (PDF, 62 pages, 1,833 KB)
September 26, 2019 Public Hearing
Application from Saskatchewan Research Council (SRC) to amend its Non-Power Reactor Operating Licence for its SLOWPOKE-2 reactor and associated facilities. The proposed licence amendment would authorize SRC to decommission the facility, located in Saskatoon, Saskatchewan.
September 26, 2019 Public Hearing
- Published on September 20, 2019
-
Published on September 19, 2019
- CMD 19-H100.1A – Presentation from Saskatchewan Research Council (PDF, 9 pages, 930 KB)
- CMD 19-H100.5A – Presentation from Concerned Citizens of Renfrew County and Area (PDF, 8 pages, 144 KB)
- CMD 19-H100.8A – Presentation from Nuclear Waste Watch and Inter-Church Uranium Committee Educational Cooperative (PDF, 33 pages, 429 KB)
- CMD 19-H100.6A – Presentation from Northwatch (PDF, 14 pages, 636 KB)
- Published on August 30, 2019
- Published on August 29, 2019
-
Published on August 28, 2019
- CMD 19-H100.2 – Submission from National Council of Women of Ontario (PDF, 5 pages, 213 KB)
- CMD 19-H100.3 – Submission from Elaine Hughes (PDF, 3 pages, 174 KB)
- CMD 19-H100.4 – Submission from Linda Murphy (PDF, 3 pages, 165 KB)
- CMD 19-H100.5 – Submission from Concerned Citizens of Renfrew County and Area (PDF, 7 pages, 168 KB)
-
Published on May 9, 2019
- CMD 19-H100 – Submission from CNSC Staff on Saskatchewan Research Council (SRC)'s application to amend its licence to authorize the decommissioning of the SLOWPOKE-2 reactor (PDF, 64 pages, 2,826 KB)
- CMD 19-H100.1 – Submission from Saskatchewan Research Council (SRC) on their application to amend their licence to authorize the decommissioning of the SLOWPOKE-2 reactor (PDF, 87 pages, 3,676 KB)
July 2019 Hearings in writing
Application from Ontario Power Generation Inc. (OPG) for an exemption from a licensing requirement for the Pickering Nuclear Generating Station (PNGS). The PNGS is located on the north shore of Lake Ontario in Pickering, Ontario.
OPG has requested a one-time exemption from the requirement of section 26.1 of RD-204, Certification of Persons Working at Nuclear Power Plants, which is part of the PNGS licensing basis. The requested exemption pertains to one specific worker at the Pickering Nuclear Generating Station (PNGS).
July 2019 Hearings in writing
June 2019 Hearings in writing
Application from Ontario Power Generation Inc. (OPG) for approval to revise the Darlington Nuclear Generating Station (DNGS) integrated improvement plan (IIP). The DNGS is located in the Municipality of Clarington, Ontario.
Application by Cameco Corporation for Commission acceptance of its revised financial guarantee for the McArthur River Operation (MRO). The MRO is located in northern Saskatchewan, approximately 620 kilometres north of Saskatoon.
June 2019 Hearings in writing
-
Published on May 9, 2019
- CMD 19-H104 – Submission from CNSC on request by OPG for approval to revise the Darlington NGS Integrated Improvement Plan (IIP) (PDF, 127 pages, 3,486 KB)
- CMD 19-H104.1 – Submission from Ontario Power Generation on their request for approval to revise the Darlington NGS Integrated Improvement Plan (IIP) (PDF, 16 pages, 345 KB)
- Published on May 22, 2019
May 15-16, 2019 public hearings
Orano Canada Inc.'s application for the renewal of the Uranium Mine Decommissioning Licence for the Cluff Lake Project
Best Theratronics Limited’s application for the renewal of the Class IB Nuclear Substance Processing Facility Operating Licence
May 15-16, 2019 public hearings
-
Published on May 9, 2019
- CMD 19-H2.1A – Supplementary submission from Best Theratronics Limited (PDF, 8 pages, 256 KB)
- CMD 19-H2.1B – Presentation from Best Theratronics Limited (PDF, 38 pages, 4,109 KB)
- CMD 19-H2.1C – Supplementary submission from Best Theratronics Limited (PDF, 103 pages, 21,149 KB)
- CMD 19-H2.A – Supplementary submission from CNSC staff – Best Theratronics Licence Renewal (PDF, 24 pages, 362 KB)
- CMD 19-H2.B – Presentation from CNSC staff – Best Theratronics Licence Renewal (PDF, 30 pages, 838 KB)
- CMD 19-H3.1A – Presentation from Orano Canada Inc. – Cluff Lake Project (PDF, 40 pages, 6,534 KB)
- CMD 19-H3.A – Presentation from CNSC staff – Cluff Lake Project (PDF, 39 pages, 1,580 KB)
- CMD 19-H3.5A – Presentation from the Ya'thi Néné Land and Resource Office (PDF, 14 pages, 375 KB)
- Published on April 24, 2019
- Published on April 18, 2019
-
Published on April 17, 2019
- CMD 19-H3.2 – Submission from the Métis Nation of Saskatchewan (PDF, 8 pages, 370 KB)
- CMD 19-H3.3 – Submission from Cameco Corporationl (PDF, 3 pages, 214 KB)
- CMD 19-H3.4 – Submission from the Saskatchewan Environmental Society (PDF, 18 pages, 603 KB)
- CMD 19-H3.5 – Submission from the Ya'thi Néné Land and Resource Office (PDF, 10 pages, 649 KB)
- CMD 19-H3.6 – Submission from Rodney Gardiner (PDF, 3 pages, 91 KB)
- CMD 19-H3.7 – Submission from Val Drummond (PDF, 5 pages, 140 KB)
- CMD 19-H3.8 – Submission from the Saskatchewan Mining Association (PDF, 4 pages, 275 KB)
- CMD 19-H3.9 – Submission from the Northern Saskatchewan Environmental Quality Committee (PDF, 9 pages, 142 KB)
- CMD 19-H3.10 – Submission from the Métis Nation of Saskatchewan (Northern Region 2, Local 62) (PDF, 3 pages, 129 KB)
- CMD 19-H3.11 – Submission from Emile Burnouf (PDF, 4 pages, 160 KB)
-
Published on March 21, 2019
- CMD 19-H3 – Submission from CNSC Staff - Cluff Lake Project (PDF, 155 pages, 5660 KB)
- CMD 19-H3.1 – Submission from Orano Canada Inc. – Cluff Lake Project (PDF, 118 pages, 8550 KB)
- CMD 19-H2 – Submission from CNSC Staff – Best Theratronics Licence Renewal (PDF, 149 pages, 1429 KB)
- CMD 19-H2.1 – Submission from Best Theratronics – Best Theratronics Licence Renewal (PDF, 42 pages, 800 KB)
March 2019 Hearing in writing
Application from Canadian Nuclear Laboratories (CNL) to amend the release limits of liquid effluent (release limits) in its Waste Nuclear Substance Licence for the Port Granby Long-Term Low-Level Radioactive Waste Management Project (Port Granby Project). In its application, CNL has also requested an update to the format of the amended licence to align it with the CNSC’s modernized licences. The Port Granby Project site is located in the municipality of Clarington, Ontario.
March 2019 hearing in writing
- CMD 19-H101 - Submission from CNSC staff on the application by CNL for amendments to its licence for the Port Granby Project (PDF, 86 pages, 2518 KB)
- CMD 19-H101.1 - Submission from CNL on their application for amendments to their licence for the Port Granby Project (PDF, 9 pages, 2634 KB)
- CMD 19-H101.2 - Submission from the Municipality of Clarington (PDF, 4 pages, 278 KB)
February 2019 Hearing in writing
Application from Canadian Nuclear Laboratories (CNL) to replace the Waste Facility Decommissioning Licence for the Gentilly-1, Douglas Point and Nuclear Power Demonstration facilities. CNL is requesting to replace the current particular licence with three licences (one for each site), with no change to the licensed activities authorized by the Commission, and with the licence expiry date remaining the same.
February 2019 hearings in writing
- CMD 18-H107 - Submission from CNSC Staff on the application from CNL to separate the licence for Douglas Point, Gentilly-1 and Nuclear Power Demonstration into three licences (PDF, 216 pages, 3964 KB)
- CMD 18-H107.1 - Submission from CNL on their application to separate the licence for Douglas Point, Gentilly-1 and Nuclear Power Demonstration into three licences (PDF, 13 pages, 856 KB)
Application from Nordion (Canada) Inc. to transfer its Nuclear Substance Processing Facility Operating Licence. Nordion has applied to transfer its licence to a successor corporation resulting from the amalgamation of Nordion, its direct parent company, and two other non-licensee affiliated companies. The amalgamated corporation was assigned a new corporate number, but retained the current corporate name of Nordion (Canada) Inc., address, personnel and ultimate owners
February 2019 hearings in writing
- CMD 19-H102 – Submission from CNSC Staff on the application from Nordion (Canada) Inc. to transfer its Nuclear Substance Processing Facility Operating Licence (PDF, 102 pages, 1683 KB)
- CMD 19-H102.1 – Submission from Nordion (Canada) Inc. on their application to transfer their Nuclear Substance Processing Facility Operating Licence (PDF, 6 pages, 139 KB)
June 25 to 29, 2018 public hearing
Ontario Power Generation Inc.'s application for a 10-year renewal of its nuclear power reactor operating licence for the Pickering Nuclear Generating Station
June 25–29, 2018 Hearing
- CMD 18-H6-1B - Supplementary written submission and videos from OPG for Part-2 Hearing (PDF, 49 pages, 2755 KB)
- CMD 18-H6-1C - Presentation from OPG for Part-2 Hearing (PDF, 24 pages, 5693 KB)
- CMD 18-H6-B - Supplementary written submission from CNSC staff for Part-2 Hearing (PDF, 314 pages, 3586 KB)
- CMD 18-H6-C - Presentation from CNSC staff for Part-2 Hearing (PDF, 37 pages, 1138 KB)
- CMD 18-H6-2 - Submission from Safe Communities of Pickering and Ajax (PDF, 4 pages, 78 KB)
- CMD 18-H6-3 - Submission from the Rotary Club of Ajax (PDF, 3 pages, 357 KB)
- CMD 18-H6-4 - Submission from the Durham Nuclear Health Committee (PDF, 3 pages, 151 KB)
- CMD 18-H6-5 - Submission from the Durham College (PDF, 4 pages, 981 KB)
- CMD 18-H6-6 - Submission from the Women's Multicultural Resource & Counselling Centre of Durham (PDF, 4 pages, 1136 KB)
- CMD 18-H6-7 - Submission from the Ajax Pickering Hospital and the Ajax Pickering Hospital Foundation (PDF, 3 pages, 238 KB)
- CMD 18-H6-8 - Submission from Laker Energy Products Ltd- (PDF, 5 pages, 178 KB)
- CMD 18-H6-9 -Submission from the Whitby Chamber of Commerce (PDF, 3 pages, 655 KB)
- CMD 18-H6-10 - Submission from Nu-Tech Precision Metals Inc. (PDF, 3 pages, 69 KB)
- CMD 18-H6-11 - Submission from the Town of Ajax (PDF, 6 pages, 489 KB)
- CMD 18-H6-12 - Submission from the Pickering Naturalists (PDF, 4 pages, 1486 KB)
- CMD 18-H6-13 - Submission from Station Gallery (PDF, 3 pages, 416 KB)
- CMD 18-H6-14 - Submission from AECOM Canada Nuclear Operations Inc. (PDF, 3 pages, 66 KB)
- CMD 18-H6-15 - Submission from Jonathan Schofield (PDF, 3 pages, 81 KB)
- CMD 18-H6-16 - Submission from Black & McDonald Limited (PDF, 4 pages, 70 KB)
- CMD 18-H6-17 - Submission from the Oxford Coalition for Social Justice (PDF, 12 pages, 4174 KB)
- CMD 18-H6-18 - Submission from Peter Tabuns- MPP- Toronto-Danforth (PDF, 4 pages, 568 KB)
- CMD 18-H6-19 - Submission from the David Suzuki Foundation (PDF, 4 pages, 123 KB)
- CMD 18-H6-20 - Presentation from Paul Sedran- RESD Inc (PDF, 147 pages, 2031 KB)
- CMD 18-H6-21 - Presentation from CANDU Owners Group Inc (PDF, 6 pages, 2165 KB)
- CMD 18-H6-22 - Presentation from the Pickering Nuclear Generating Station Community Advisory Council (PDF, 23 pages, 5164 KB)
- CMD 18-H6-22A - Presentation from the Pickering Nuclear Generating Station Community Advisory Council (PDF, 15 pages, 2056 KB)
- CMD 18-H6-23 - Presentation from the Canadian Association of Nuclear Host Communities and the Municipality of Clarington (PDF, 8 pages, 1821 KB)
- CMD 18-H6-24 - Presentation from Anna Tilman (PDF, 30 pages, 853 KB)
- CMD 18-H6-24A - Presentation from Anna Tilman (PDF, 23 pages, 503 KB)
- CMD 18-H6-25 - Presentation from the Ajax-Pickering Board of Trade (PDF, 4 pages, 256 KB)
- CMD 18-H6-25A - Presentation from the Ajax-Pickering Board of Trade (PDF, 13 pages, 803 KB)
- CMD 18-H6-26 - Presentation from BWXT Canada Ltd. (PDF, 10 pages, 1795 KB)
- CMD 18-H6-27 - Presentation from the Toronto Region Board of Trade (PDF, 18 pages, 1082 KB)
- CMD 18-H6-28 - Presentation from Dan Rudka (PDF, 11 pages, 192 KB)
- CMD 18-H6-29 - Presentation from the Organization of Canadian Nuclear Industries (PDF, 4 pages, 238 KB)
- CMD 18-H6-29A - Presentation from the Organization of Canadian Nuclear industries (PDF, 17 pages, 1438 KB)
- CMD 18-H6-30 - Presentation from the Ontario Chamber of Commerce (PDF, 6 pages, 297 KB)
- CMD 18-H6-31 - Presentation from Rommel Bellosillo (PDF, 4 pages, 194 KB)
- CMD 18-H6-32 - Presentation from North American Young Generation in Nuclear - Canada (PDF, 8 pages, 466 KB)
- CMD 18-H6-33 - Presentation from Dominique Bruce (PDF, 4 pages, 125 KB)
- CMD 18-H6-34 - Presentation from Evelyn Butler (PDF, 5 pages, 131 KB)
- CMD 18-H6-35 - Presentation from Jerry Cuttler (PDF, 34 pages, 2544 KB)
- CMD 18-H6-35A - Presentation from Jerry Cuttler (PDF, 20 pages, 2026 KB)
- CMD 18-H6-35B - Revised presentation and submission from Jerry Cuttler (PDF, 50 pages, 4561 KB)
- CMD 18-H6-36 - Presentation from Dr Tim Seitz (PDF, 3 pages, 88 KB)
- CMD 18-H6-37 - Presentation from the Canadian Nuclear Workers Council (PDF, 7 pages, 436 KB)
- CMD 18-H6-37A - Presentation from the Canadian Nuclear Workers Council (PDF, 12 pages, 151 KB)
- CMD 18-H6-38 - Presentation from Sunil Nijhawan (PDF, 38 pages, 2099 KB)
- CMD 18-H6-39 - Presentation from Kimberly Grant-Stuart (PDF, 6 pages,183 KB)
- CMD 18-H6-40 - Presentation from Canadian Nuclear Society (PDF, 10 pages, 129 KB)
- CMD 18-H6-41 - Presentation from Canadian Nuclear Laboratories (PDF, 4 pages, 1162 KB)
- CMD 18-H6-42 - Presentation from Darlene Buckingham (PDF, 10 pages, 135 KB)
- CMD 18-H6-43 - Presentation from the Canadian Nuclear Association (PDF, 7 pages, 292 KB)
- CMD 18-H6-43A - Supplementary submission from the Canadian Nuclear Association (PDF, 26 pages, 459 KB)
- CMD 18-H6-44 - Presentation from SNC-Lavalin (PDF, 8 pages, 198 KB)
- CMD 18-H6-45 - Presentation from Women in Nuclear Canada (PDF, 60 pages, 710 KB)
- CMD 18-H6-46 - Submission from E-S- Fox Limited (PDF, 5 pages, 217 KB)
- CMD 18-H6-47 - Submission from Charles Chiarelli (PDF, 3 pages, 70 KB)
- CMD 18-H6-48 - Submission from Karen Walters (PDF, 3 pages, 74 KB)
- CMD 18-H6-49 - Submission from Aecon Group Inc- (PDF, 4 pages, 169 KB)
- CMD 18-H6-50 - Submission from InŠs Marchese (PDF, 4 pages, 64 KB)
- CMD 18-H6-51 - Submission from Stephanie Beausoleil (PDF, 4 pages, 52 KB)
- CMD 18-H6-52 - Submission from Melis Kilic (PDF, 5 pages, 129 KB)
- CMD 18-H6-53 - Submission from Jill Lennox (PDF, 3 pages, 45 KB)
- CMD 18-H6-54 - Submission from Jayanthini Jegatheswaran (PDF, 3 pages, 63KB)
- CMD 18-H6-55 - Presentation from Northwatch (PDF, 57 pages, 3395 KB)
- CMD 18-H6-56 - Presentation from Durham Nuclear Awareness (PDF, 45 pages, 1870 KB)
- CMD 18-H6-56A - Supplementary written submission and presentation from Durham Nuclear Awareness (PDF, 58 pages, 5077 KB)
- CMD 18-H6-57 - Presentation from the Canadian Environmental Law Association (PDF, 69 pages, 1038 KB)
- CMD 18-H6-57A - Supplementary written submission from the Canadian Environmental Law Association (PDF, 10 pages, 354 KB)
- CMD 18-H6-57B - Presentation from the Canadian Environmental Law Association (PDF, 33 pages, 344 KB)
- CMD 18-H6-58 - Presentation from Swim Drink Fish - Lake Ontario Waterkeeper (PDF, 21 pages, 686 KB)
- CMD 18-H6-58A - Supplementary submission from Swim Drink Fish / Lake Ontario Waterkeeper (PDF, 140 pages, 11001 KB)
- CMD 18-H6-59 - Presentation from Kirsten Dahl (PDF, 4 pages, 89 KB)
- CMD 18-H6-60 - Presentation from Michel Duguay (PDF, 6 pages, 81 KB)
- CMD 18-H6-61 - Presentation from Linda Gasser (PDF, 6 pages, 85 KB)
- CMD 18-H6-62 - Presentation from Greenpeace (PDF, 28 pages, 322 KB)
- CMD 18-H6-62A - Supplementary written submission from Greenpeace (PDF, 79 pages, 3967 KB)
- CMD 18-H6-62B - Presentation from Greenpeace (PDF, 15 pages, 796 KB)
- CMD 18-H6-63 - Presentation from the Canadian Coalition for Nuclear Responsibility (PDF, 9 pages, 156 KB)
- CMD 18-H6-64 - Presentation from the Provincial Council of Women of Ontario (PDF, 22 pages, 181 KB)
- CMD 18-H6-65 - Presentation from Ian Fairlie (PDF, 27 pages, 265 KB)
- CMD 18-H6-66 - Presentation from Registered Nurses Association of Ontario (PDF, 8 pages, 495 KB)
- CMD 18-H6-67 - Presentation from the Regional Municipality of Durham (PDF, 37 pages, 564 KB)
- CMD 18-H6-67A - Presentation from the Regional Municipality of Durham (PDF, 14 pages, 1065 KB)
- CMD 18-H6-68 - Presentation from Amir Ayazi (PDF, 4 pages, 53 KB)
- CMD 18-H6-69 - Presentation from the Power Workers Union (PDF, 10 pages, 161 KB)
- CMD 18-H6-69A - Presentation from the Power Workers Union (PDF, 9 pages, 136 KB)
- CMD 18-H6-70 - Presentation from Barbara Pulst (PDF, 3 pages, 46 KB)
- CMD 18-H6-71 - Presentation from Estefany Guecha (PDF, 4 pages, 86 KB)
- CMD 18-H6-71A - Presentation from Estefany Guecha (PDF, 11 pages, 4383 KB)
- CMD 18-H6-72 - Presentation from Louis Bertrand (PDF, 4 pages, 87 KB)
- CMD 18-H6-72A - Presentation from Louis Bertrand (PDF, 20 pages, 399 KB)
- CMD 18-H6-73 - Presentation from the Society of United Professionals (PDF, 29 pages, 637 KB)
- CMD 18-H6-74 - Presentation from Erin O'Toole- MP- Durham (PDF, 4 pages, 793 KB)
- CMD 18-H6-75 - Presentation from Belinda Cole (PDF, 5 pages, 56 KB)
- CMD 18-H6-76 - Presentation from the Canadian Association of Physicians for the Environment (PDF, 4 pages, 657 KB)
- CMD 18-H6-76A - Presentation from the Canadian Association of Physicians for the Environment (PDF, 9 pages, 66 KB)
- CMD 18-H6-77 - Presentation from the Ontario Clean Air Alliance (PDF, 142 pages, 16079 KB)
- CMD 18-H6-78 - Presentation from Andrei Neacsu (PDF, 5 pages, 77 KB)
- CMD 18-H6-79 - Presentation from North American Young Generation in Nuclear- Durham Chapter (PDF, 12 pages, 527 KB)
- CMD 18-H6-80 -Submission from the City of Pickering (PDF, 4 pages, 900KB)
- CMD 18-H6-81 - Submission from Lucy Seidler (PDF, 3 pages, 98 KB)
- CMD 18-H6-82 - Submission from the Toronto Environmental Alliance (PDF, 5 pages, 293 KB)
- CMD 18-H6-83 - Submission from Borden Rhodes (PDF, 4 pages, 121 KB)
- CMD 18-H6-84 - Submission from Lori Moncada (PDF, 5 pages, 184 KB)
- CMD 18-H6-85 - Submission from William Douglas (PDF, 3 pages, 65 KB)
- CMD 18-H6-86 - Submission from Maryam Astaneh (PDF, 3 pages, 49 KB)
- CMD 18-H6-87 - Submission from Christopher Small (PDF, 4 pages, 159 KB)
- CMD 18-H6-88 - Submission from Canadian Council for Aboriginal Business (PDF, 8 pages, 121 KB)
- CMD 18-H6-89 - Submission from ATS Automation (PDF, 4 pages, 209 KB)
- CMD 18-H6-90 - Submission from Sylvia Schmidt (PDF, 3 pages, 69 KB)
- CMD 18-H6-91 - Submission from the Scientists in School (PDF, 3 pages, 941 KB)