Each year, CNSC publishes an annual Staff Report on the Safety Performance of the Canadian Nuclear Power Industry (Industry Report), a comprehensive report card of the performance of Canada’s five nuclear power reactor sites – Bruce, Darlington, Pickering, Bécancour, and Point Lepreau.
CNSC assesses licensee programs and their implementation separately, according to five ratings that range from “A” (exceeds requirements) to “E” (unacceptable). Grades are assigned for both design of a program and its implementation, for performance in each safety area and for programs within each safety area.
In the 2007 Industry Report, CNSC personnel concluded that overall, the nuclear power plant industry operated safely. The vast majority of all grades were “B’s” indicating licensees met CNSC expectations. CNSC assigned a “C” grade where licensee performance fell below CNSC requirements. Even though a “C” rating does not mean a safety risk is unacceptable, CNSC continues to closely monitor facilities that received “C” grades, to ensure that licensees or applicants are making every effort to mitigate the issues identified. No facility received a lower than a “C” grade in 2007.
Safety area/ |
P or I |
Bruce |
Darlington |
Pickering |
Gentilly-2 |
Point Lepreau |
||||
A |
B |
A |
B |
|||||||
Operating performance |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
C |
B |
B |
B |
|||
Organization and plant management |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
C |
B |
B |
B |
|||
Operations |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
C |
B |
B |
B |
|||
Occupational health and safety (non-radiological) |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
A |
A |
A |
B |
B |
B |
B |
|||
Performance assurance |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
C |
B |
B |
B |
|||
Quality management |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
C |
B |
C |
B |
|||
Human factors
|
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
C |
B |
B |
C |
|||
Training, examination and certification |
P |
B |
B |
B |
B |
B |
B |
B |
||
|
I |
C |
B |
B |
B |
B |
B |
B |
||
Design and analysis |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Safety analysis |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Safety issues |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Design |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
C |
B |
B |
C |
B |
B |
B |
|||
Equipment fitness for service |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Maintenance |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
C |
B |
B |
B |
B |
B |
B |
|||
Structural integrity |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Reliability |
P |
B |
B |
B |
B |
B |
B |
A |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Equipment qualification |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
C |
B |
B |
B |
B |
|||
Emergency preparedness |
P |
A |
A |
A |
A |
A |
A |
A |
||
I |
A |
A |
A |
A |
A |
B |
B |
|||
Environmental protection |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Radiation protection |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
A |
B |
B |
B |
B |
|||
Site security |
P |
Protected |
||||||||
I |
Protected |
|||||||||
Safeguards |
P |
B |
B |
B |
B |
B |
B |
B |
||
I |
B |
B |
B |
B |
B |
B |
B |
|||
Legend:
P: Program I: Implementation
A = Exceeds requirements
B = Meets requirements
C = Below requirements
D = Significantly below requirements
E = Unacceptable
Note: